My app is reporting CPU time, and people reasonably want to know how much time this is out of, so they can compute % CPU utilized. My question is, what's the name for the wall clock time times the number of CPUs?
If you add up the total user, system, idle, etc. time for a system, you get the total wall clock time, times the number of CPUs. What's a good name for that? According to Wikipedia, CPU time is:
CPU time (or CPU usage, process time) is the amount of time for which
a central processing unit (CPU) was used for processing instructions
of a computer program, as opposed to, for example, waiting for
input/output (I/O) operations.
"total time" suggests just wall clock time, and doesn't connote that over a 10 second span, a four-cpu system would have 40 seconds of "total time."

Total Wall Clock Time of all CPUs
Naming things is hard, why waste a good 'un once you've found it ?

Aggregate time: 15 of 40 seconds.

Related

Approximating Processing Power from CPU-Time

In a particular scenario I found that a code has taken 20 CPU Years and 4 real Months time. My goal is to approximate the amount of processing power utilized considering the fact that all the processors were on 100% usage all the time. So, my approach is as follows,
20 CPU Years = 20 * 365 * 24 CPU Hours = 175,200 CPU Hours.
Now, 1 CPU Year means 1 GFLOP machine working for 1 real Hour. Which means, in this case, the work done is, 1 GFLOP machine working for 175,200 real Hours. But in reality it took 4 * 30 * 24 = 2,880 real hours. So, approximately 175,200/2,880 =(approx.) 61 GLFOP machine.
My question is am I doing the approximation correctly or misunderstanding some particular term as per the calculations given above ? Or I am mixing GFLOPS and GFLOP together ?
Definitions
My question is am I doing the approximation correctly or misunderstanding some particular term as per the calculations given above ?
"100% usage" may mean the CPU spent 20% of its time doing nothing waiting for data to be transferred to/from RAM (and/or branch mispredictions or other stalls), 10% of its time running faster than normal because other CPUs where actually doing nothing, and 15% of its time running slower than normal for power/temperature management reasons; and (depending on where you got that "100% usage" statistic) "100% usage" may be significantly more confusing (e.g. http://www.brendangregg.com/blog/2017-08-08/linux-load-averages.html ).
Depending on context; GFLOPS is either "theoretical maximum under perfect conditions that will never occur in practice" (worthless marketing hype); or a direct measurement of a specific case that ignores most of the work a CPU did (everything involving integers, all control flow, all data transfer, all memory management, ...)
In a particular scenario I found that a code has taken 20 CPU Years and 4 real Months time. My goal is to approximate the amount of processing power utilized.
From this; you might (or might not) be able to say "most of the work that CPUs did was discarded due to lockless algorithm retries and/or transactions that couldn't be committed; and (partly because the bottleneck was RAM bandwidth and partly because of the way SMT works on this system) it would have been 4 times as fast if half as many CPUs were used."
TL;DR: Approximating processor power is just an inconvenient way to obfuscate the (more useful) information that you started with (e.g. that a specific piece of code running on a specific piece of hardware that was working on a specific piece of data happened to take 4 months of real time).
Your Calculation:
Yes; you're mixing GFLOP and GFLOPS (e.g. GFLOPS = GFLOP per second; and a "1 GFLOP machine" is a computer that can do a billion floating point operations in an infinite amount of time, which is every computer), and the web page you linked to is making the same mistake (e.g. saying "a 1 GFLOP reference machine" when it should be saying "a 1 GFLOPS reference machine").
Note that there's no need to care about GFLOPS or GFLOP for the calculation you're doing: If something was supposed to take 20 "reference CPU years" and actually took 4 months (or 4/12 years); then you'd say that your hardware is equivalent to "20 / (4/12) = 60 reference CPUs". Of course this is horribly silly and it'd make more sense to say that your hardware happened to achieve 60 GFLOPS without bothering with the misleading "reference CPU" nonsense.

What is the difference between MIPS and Execution time

When it comes to rating the performance of a processor, is calculating the Million Instructions Per Second (MIPS) a practical measure to use?
Or is finding the Execution Time (IC x CPI x 1/CR) the main thing to use?
Imagine you have one CPU that does 100 million tiny little instructions that don't do much on their own per second. Next; imagine you have another CPU where you need a quarter of the instructions to do the same work; which can do 50 million larger instructions per second. The second CPU has half as many MIPs but is twice as fast.
Now.. Imagine you have 2 CPUs that both execute the exact same instructions; where one CPU runs at 1 GHz, can do 5 instructions per cycle, and stalls rarely; and the other CPU runs at 4 GHz, can only do 2 instructions per cycle, and spends a lot more time stalled doing nothing (due to cache misses, branch mispredictions, etc). In this case the 1 GHz CPU might be significantly faster than the 4 GHz CPU.
Finally; imagine you have 2 CPUs that both execute the exact same instructions, both have exactly the same clock frequency, both execute the same number of instructions per cycle, and both spend exactly the same amount of time stalled. One CPU has overheats easily and had to "under-clock" itself to a crawl after 250 milliseconds of not being idle just to avoid melting itself, and the other CPU can go at max. speed continuously without ever overheating.
Execution time is how long it takes to do some work taking everything into account (and can be extremely different for different types of work); while MIPS is like a real estate agent determining how much a building is worth by measuring the weight of a rubber chicken.

Calculating Cycles Per Instruction

From what I understand, to calculate CPI, it's the percentage of the type of instruction multiplied by the number of cycles right? Does the type of machine have any part of this calculation whatsoever?
I have a problem that asks me if a change should be recommended.
Machine 1: 40% R - 5 Cycles, 30% lw - 6 Cycles, 15% sw - 6 Cycles, 15% beq 3 - Cycles, on a 2.5 GHz machine
Machine 2: 40% R - 5 Cycles, 30% lw - 6 Cycles, 15% sw - 6 Cycles, 15% beq 4 - Cycles, on a 2.7 GHz machine
By my calculations, machine 1 has 5.15 CPI while machine 2 has 5.3 CPI. Is it okay to ignore the GHz of the machine and say that the change would not be a good idea or do I have to factor the machine in?
I think the point is to evaluate a design change that makes an instruction take more clocks, but allows you to raise the clock frequency. (i.e. leaning towards a speed-demon design like Pentium 4, instead of brainiac like Apple's A7/A8 ARM cores. http://www.lighterra.com/papers/modernmicroprocessors/)
So you need to calculate instructions per second to see which one will get more work done in the same amount of real time. i.e. (clock/sec) / (clocks/insn) = insn/sec, cancelling out the clocks from the units.
Your CPI calculation looks ok; I didn't check it, but yes a weighted average of the cycles according to the instruction mix.
These numbers are obviously super simplified; any CPU worth building at 2.5GHz would have some kind of branch prediction so the cost of a branch isn't just a 3 or 4 instruction bubble. And taking ~5 cycles per instruction on average is pathetic. (Most pipelined designs aim for at least 1 instruction per clock.)
Caches and superscalar CPUs also lead to complex interactions between instructions depending on whether they depend on earlier results or not.
But this is sort of like what you might do if considering increasing the L1d cache load-use latency by 1 cycle (for example), if that took it off the critical path and let you raise the clock frequency. Or vice versa, tightening up the latency or reducing the number of pipeline stages on something at the cost of reducing frequency.
Cycles per instruction a count of cycles. ghz doesnt matter as far as that average goes. But saying that we can see from your numbers that one instruction is more clocks but the processors are a different speed.
So while it takes more cycles to do the same job on the faster processor the speed of the processor DOES compensate for that so it seems clear this is a question about does the processor speed account for the extra clock?
5.15 cycles/instruction / 2.5 (giga) cycles/second, cycles cancels out you get
2.06 seconds/(giga) instruction or (nano) seconds/ instruction
5.30 / 2.7 = 1.96296 (nano) seconds / instruction
The faster one takes a slightly less amount of time so it will run the program faster.
Another way to see this to check the math.
For 100 clock cycles on the slower machine 15% of those are beq. So 15 of the 100 clocks, which is 5 beq instructions. The same 5 beq instructions take 20 clocks on the faster machine so 105 clocks total for the same instructions on the faster machine.
100 cycles at 2.5ghz vs 105 at 2.7ghz
we want the amount of time
hz is cycles / second we want seconds on the top
so we want
cycles / (cycles/second) to have cycles cancel out and have seconds on the top
1/2.5 = 0.400 (400 picoseconds)
1/2.7 = 0.370
0.400 * 100 = 40.00 units of time
0.370 * 105 = 38.85 units of time
So despite taking 5 more cycles the processor speed differences is fast enough to compensate.
2.7/2.5 = 1.08
105/100 = 1.05
so 2.5 * 1.05 = 2.625 so a processor 2.625ghz or faster would run that program faster.
Now what were the rules for changing computers, is less time defined as a reason to change computers? What is the definition of better? How much more power does the faster one consume it might take less time but the power consumption might not be linear so it may take more watts despite taking less time. I assume the question is not that detailed, meaning it is vague meaning it is a poorly written question on its own, so it goes to what the textbook or lecture defined as the threshold for change to the other processor.
Disclaimer, dont blame me if you miss this question on your homework/test.
Outside an academic exercise like this, the real world is full of pipelined processors (not all but most of the folks writing programs are writing programs for) and basically you cant put a number on clock cycles per instruction type in a way that you can do this calculation because of a laundry list of factors. Make sore you understand that, nice exercise, but that specific exercise is difficult and dangerous to attempt on real world processors. Dangerous in that as hard as you work you may be incorrectly measuring something and jumping to the wrong conclusions and as a result making bad recommendations. At the same time there is very much the reality that faster ghz does improve some percentage of the execution, but another percentage suffers, and is there a net gain or loss. Or a new processor design faster or slower may have features that perform better than an older processor, but not all feature will be better, there is a tradeoff and then we get into what "better" means.

CPU time and wall clock time

curious question on timing. When measuring wall clock time with any language such as python time.time() does the time include the CPU/System time.clock() time in it as well?
In Python, time.time() gives you the elapsed time (also known as wall time).That includes CPU time inasmuch as that's a subset of wall time but you cannot extract CPU time from time.time() itself.
For example, if your process runs for ten seconds but uses the CPU for only five of those seconds, the former includes the latter.

Getting cpu usage and calculating % used

I need to calculate the cpu usage and aggregate it from proc file in linux
/proc/stat gives me data but how would i come to know the % used of cpu at time as
stat gives me the count of processes at cores running at any time which does not give me any idea of %use of cpu?
And i am coding this in Golang and have to do this w/o scripts
Thanks in advance!!
/proc/stat does not only give you the count of processes on each core. man proc will tell you the exact format of that file. Copied from it, here is the part you should be interested in:
/proc/stat
cpu 3357 0 4313 1362393
The amount of time, measured in units of USER_HZ
(1/100ths of a second on most architectures, use
sysconf(_SC_CLK_TCK) to obtain the right value), that the
system spent in user mode, user mode with low priority
(nice), system mode, and the idle task, respectively.
The last value should be USER_HZ times the second entry
in the uptime pseudo-file.
It is then easy to do the substraction of the idle field between two measures, which will give you the time spent not doing anything by this CPU. The other value that you can extract is the time doing something, which is the difference between two measures of:
time in user mode + time spent in user mode with low priority + time spent in system mode
You will then have two values; one, A, is expressing the time doing nothing, and the other, B, the time actually doing something. B / (A + B) will give you the percentage of time the CPU was busy.