Following truth table resulted from the circuit below. SR(NOR) latch is used. I have tried several times to trace through the circuit to see how truth table values are produced but its not working. Can someone explain to me what is going on ? This circuit was introduced in conjunction with racing although I am not sure if it has anything to do with it.
NOTE: "CLOCK" appears as a straight line to show how its connected everything. It is a normal clock that oscillates between 1 and 0. (this is how my instructor drew it).
Strictly, this does belong on EE. The other questions you've found are likely to be old - before EE was established.
You should look at the 1-to-0 transitions of the clock. When that occurs and only when that occurs, the value currently on S is transferred to Q.
The Race condition appears when the clock signal is delayed, even with the tiny amount of copper track between real components. The actual waveform is not 1-0 or 0-1, it ramps between the two values. A tiny variation between two components, one seeing the transition at say 2.7V and the other at 2.5 would mean that the first component moves the value from S to Q fractionally before the second, so when the second component decides to transfer the value, it may see the value after the transfer has occurred on the prior component. You therefore may have a race between the two. These delays can also be affected by supply-rail stability and temperature, so the whole arrangement can become unreliable if not carefully designed. The condition is often overcome be deliberately routing the clock so that it will arrive at the last component in the chain first, giving that end of the chain a head-start.
I've worked on systems where replacing a component with a faster version caused the circuit to stop working. The new component was working too fast for the remainder of the circuit - and you needed to deliberately select (or use factory-selected) slower versions.
On a related note, before hard-drives became cheap, and floppy-drives (you may need to google that) before them it was common to use casste tapes (even more likely you'd need google on those.) Cheap and cheerful was best. If you used a professional quality recorder/player, you'd often get unusable results.
Related
This problem has been bothering me for a long time, based on my understanding:
set_false_path is a timing constraints which is not required to be optimized for timing. we can use it for two flop synchronizer since it is not required to get captured in a limited time.
set_clock_groups It saves us from defining too many false paths.
set_multicylce_path used to relax the path requirement when the default worst requirement is too restrictive. we can set the set/hold clk to fix the timing. we can use it in cross domain
set_max_skew/set_max_delay -datapath_only used on asynchronous FIFO style that does the whole convert read/write pointers from binary to gray. Looks like set_max_skew help with control the skew between the multiple bits of the gray code to the double-flop synchronizers. Why do you need the "datapath_only"? Just using set_multicycle_path will also pass the timing check.
So in summary, all those methods can be used in async fifo right?
And the set_false_path is the most simple way. No need to worry about the mcp cycle or max delay. I guess we use it only when the logic between 2 FF is "combinational"? Can we use it when there are sequence logic between 2 cross domain FF?
If ignoring all timing calculations using FP is bad, when is it a good time to use it? In theory I can replace all the FP with MCP.
What factors do you need to consider in order to choose the most suitable constraints?
So apparently there are 4 following questions in your post:
Question 1: So in summary, all those methods can be used in async fifo right?
Question 2: And the set_false_path is the most simple way. No need to worry about the mcp cycle or max delay. I guess we use it only when the logic between 2 FF is "combinational"? Can we use it when there are sequence logic between 2 cross domain FF?
Question 3: If ignoring all timing calculations using FP is bad, when is it a good time to use it? In theory I can replace all the FP with MCP.
Question 4: What factors do you need to consider in order to choose the most suitable constraints?
Following are the 4 answers to aforementioned questions:
Answer 1: As shown below in figure, with an asynchronous FIFO, data can arrive at arbitrary time intervals on the transmission side, and the receiving side pulls data out of the queue as it has the bandwidth to process it.
Therefore, Yes, you can use all those optimizations/constraints/methods for asynchronous FIFO.
Answer 2: Yes set_false_path can be considered as one of the most simplest. And as the following figure shows, you are right we use when the logic between 2 FF is "combinational"?
Furthermore, based on my understanding, we do not use for sequence logic.
Answer 3: A false path is similar to the multicycle path in that it is not required to propagate signals within a single clock period. The difference is that a false path is not logically possible as dictated by the design. In other words, even though the timing analysis tool sees a physical path from one point to the other through a series of logic gates, it is not logically possible for a signal to propagate between those two points during normal operation. The main difference between a multicycle path with many available cycles (large n) versus a false path is that the multicycle path will still be checked against setup and hold requirements and will still be included in the timing analysis. It is possible for a multicycle path to still
fail timing, but a false path will never have any associated timing violations.
Hence use a multicycle path in place of a false path constraint when:
your intent is only to relax the timing requirements on a synchronous path;
but
the path still must be timed, verified and optimized.
Answer 4:
Although a very valid question yet too broad. It all depends on the underlying design. Most implementation tools for FPGA layout have a plenty of optimization options. And obviously not all constraints are used by all steps
in the compilation flow. Based on my experience and citing from Reference 1 the constraints that must be included in every design include all clock definitions,
I/O delays, pin placements, and any relaxed constraints including multicycle
and false paths.
Following two main references can further explain you to understand the the use of constraints:
Reference 1
Reference 2
I am not sure how to express my scenario using activity diagrams:
What I am trying to visualise is the fact that:
A message is received
Two independent and concurrent actions take place: logging of the message and processing the message
Logging always takes less time than processing
The first activity in the diagram is correct in the sense that the actions are independent but it does not relay the fact that logging is guaranteed to take less time than processing.
The second activity in the diagram is not correct because, even if logging completes before processing, it looks as though processing depended on the logging's finishing first and that does not represent the reality.
Here is a non-computer related example:
You are a novice in birdwatching, trying to make your first notes in your notebook about birds passing by
A flock of birds approaches, you try to recognise as many details as possible
You want to write down the details in your notebook, but wait, you begin to realise that your theoretical background does not work in practice, what should be a quick scribble actually amounts to nothing in the end because you did not recognise anything
In the meantime, the birds majestically flew away without waiting for you, the activity is gone
Or maybe you did actually write it down, it took you only a moment and the birds are still nearby, slowly flying away, ending the activity again after some time
Or maybe you were under such awe that you just kept watching at them, without taking any notes - they fly away, disappearing in the horizon, ending the activity
After a few hours, you have enough notes and you come home very happy - maybe you did not capture everything but this was enough to make you smile anyway
I can always add a comment to a diagram to express it all somehow but I wonder, is there a more structured way to express what I described in an activity diagram? If not an activity diagram then what kind of a diagram would be better suited in your opinion? Thank you.
Your first diagram assumes that the duration of logging is always shorter than processing:
If this assumption is correct, the upper flow reaches the flow-final node, and the remaining flows continue until the first reaches the activity-final node. Here, the processing continues and the activity ends when the processing ends. This is exactly what you want.
But if once, the execution would deviate from this assumption and logging would get delayed for any reason, then the end of the processing would reach the activity-final node, resulting in the immediate interruption of all other ongoing activities. So logging would not complete. Maybe it’s not a problem for you, but in most cases audit expects logs to be complete.
You may be interested in a safer way that would be to add a join node:
The advantage is that the activity does not depend on any assumptions. It will always work:
whenever the logging is faster, the token on that flow will wait at the join node, and as soon as process is finished the activity (safely) the join can happen and the outgoing token reaches the end. This is exactly what you currently expect.
if the logging is exceptionally slower, no problem: the processing will be over, but the activity will wait for the logging to be completed.
This robust notation makes logging like Schroedinger's cat in its box: we don't have to know what activity is longer or shorter. At the end of the activity, both actions are completed.
Time in activity diagrams?
Activity diagrams are not really meant to express timing and duration. It's about the flow of control and the synchronization.
However, if time is important to you, you could:
visually make one activity shorter than the other. This is super-ambiguous and absolute meaningless from a formal UML point of view. But it's intuitive when readers see the parallel flow (a kind of sublminal communication ;-) ) .
add a comment note to express your assumption in plain English. This has the advantage of being very clear an unambiguous.
using UML duration constraints. This is often used in timing diagram, sometimes in sequence diagrams, but in general not in activity diagrams (personally I have never seen it, but UML specs doesn't exclude it either).
Time is something very general in the UML specs, and defined independently of the diagram. For example:
8.4.4.2: A Duration is a value of relative time given in an implementation specific textual format. Often a Duration is a non- negative integer expression representing the number of “time ticks” which may elapse during this duration.
8.5.1: An Interval is a range between two values, primarily for use in Constraints that assert that some other Element has a value in the given range. Intervals can be defined for any type of value, but they are especially useful for time and duration values as part of corresponding TimeConstraints and DurationConstraints.
In your case you have a duration observation for the processing (e.g. d), and a duration constraint for the logging (e.g. 0..d).
8.5.4.2: An IntervalConstraint is shown as an annotation of its constrainedElement. The general notation for Constraints may be used for an IntervalConstraint, with the specification Interval denoted textually (...).
Unfortunately little more is said. The only graphical examples are for messages in sequence diagrams (Fig 8.5 and 17.5) and for timing diagrams (Fig 17.28 to 17.30). Nevertheless, the notation could be extrapolated for activity diagrams, but it would be so unusal that I'd rather recommend the comment note.
I am designing a video pixel data processing pipeline in VHDL which involves several steps including multiply and divide.
I want to keep signals synchronised so that I can e.g. maintain a sync signal and output it correctly at the end of the pipeline along with manipulated pixel data which has been through several processing stages.
I assume I want to use shift registers or something to delay signals by the right number of cycles so that the output is correct, but I'm looking for advice about good ways to design this, particularly as the number of pipeline stages for different signals may vary as I evolve the design.
Good question.
I'm not aware of a complete solution but here are two partial strategies...
Interconnecting components... It would be really nice if a component could export a generic whose value was its pipeline depth. Unfortunately you can't, and dedicating a port to this seems silly (though it's probably workable; as it would be an integer constant, it would disappear in synthesis)
Failing that, pass IN a generic indicating the budget for this module. Inside the module, assert (severity FAILURE) if the budget can't be met... (this assert is checkable at synth time and at least Xilinx XST handles similar asserts)
Make the budget a hard number, and either assert if not equal to actual pipeline depth, or add pipe stages inside the module if the budget is too large, and only assert if the budget is too small.
That way you are connecting predictable modules, and the top level can perform pipeline arithmetic to balance things (e.g. passing a computed constant value to a programmable delay line)
Within a component... I use a single process, with registers represented as internal signals whose names reflect their pipe stage, exponent_1, exponent_2, exponent_3 and so on. Within the process, the first section describes all the actions for the first cycle, the second section describes the second cycle, and so on. Typically the "easier" paths may be copied verbatim to the next pipe stage, just to sync them with the critical path. The process is fairly organised and easy to maintain.
I might break a 32-bit multiply down into 16*16 chunks and pipeline the partial product additions. The control this gives, USED to give better results than XST gave alone...
I know some people prefer variables within a process, and I use them for intermediate results in a pipe stage, but using signals I can describe the pipeline in its natural order (thanks to postponed assignment) whereas using variables, I would have to describe it backwards!
I create a package for each of my major processing blocks, one of the constants in there is the processing delay of that block. I can then connect that up to my general-purpose "delay-line" block which has a generic for the number of cycles.
Keeping that constant in "sync" with the actual implementation is best done by a self-checking testbench.
Something to consider is delay lines (i.e. back to back registers) vs FIFOs.
Consider a module X with a pipeline delay N. FIFOs work well when there is a N is variable. The trick is remembering that you can only request new work when both the module and the FIFO can accept it. Ideally you size the FIFO so that it can contain the maximum number of items that X can work on concurrently, but sometimes that's not practical. For example, if your calculation includes accesses to a distant memory.
Another option is integrating the side channel (i.e. the path that your sync flag is taking) into the module X rather than it going outside. If you do this then if any part of the calculation has to stall, you can also stall the side channel and the two stay in sync. You can do this because you're in a scope that has all the necessary signals in it. Then all signals, whether used in the calculation or not, appear at the output at the same time.
A few years back, researchers announced that they had completed a brute-force comprehensive solution to checkers.
I have been interested in another similar game that should have fewer states, but is still quite impractical to run a complete solver on in any reasonable time frame. I would still like to make an attempt, as even a partial solution could give valuable information.
Conceptually I would like to have a database of game states that has every known position, as well as its succeeding positions. One or more clients can grab unexplored states from the database, calculate possible moves, and insert the new states into the database. Once an endgame state is found, all states leading up to it can be updated with the minimax information to build a decision trees. If intelligent decisions are made to pick probable branches to explore, I can build information for the most important branches, and then gradually build up to completion over time.
Ignoring the merits of this idea, or the feasability of it, what is the best way to implement such a database? I made a quick prototype in sql server that stored a string representation of each state. It worked, but my solver client ran very very slow, as it puled out one state at a time and calculated all moves. I feel like I need to do larger chunks in memory, but the search space is definitely too large to store it all in memory at once.
Is there a database system better suited to this kind of job? I will be doing many many inserts, a lot of reads (to check if states (or equivalent states) already exist), and very few updates.
Also, how can I parallelize it so that many clients can work on solving different branches without duplicating too much work. I'm thinking something along the lines of a program that checks out an assignment, generates a few million states, and submits it back to be integrated into the main database. I'm just not sure if something like that will work well, or if there is prior work on methods to do that kind of thing as well.
In order to solve a game, what you really need to know per a state in your database is what is its game-theoretic value, i.e. if it's win for the player whose turn it is to move, or loss, or forced draw. You need two bits to encode this information per a state.
You then find as compact encoding as possible for that set of game states for which you want to build your end-game database; let's say your encoding takes 20 bits. It's then enough to have an array of 221 bits on your hard disk, i.e. 213 bytes. When you analyze an end-game position, you first check if the corresponding value is already set in the database; if not, calculate all its successors, calculate their game-theoretic values recursively, and then calculate using min/max the game-theoretic value of the original node and store in database. (Note: if you store win/loss/draw data in two bits, you have one bit pattern left to denote 'not known'; e.g. 00=not known, 11 = draw, 10 = player to move wins, 01 = player to move loses).
For example, consider tic-tac-toe. There are nine squares; every one can be empty, "X" or "O". This naive analysis gives you 39 = 214.26 = 15 bits per state, so you would have an array of 216 bits.
You undoubtedly want a task queue service of some sort, such as RabbitMQ - probably in conjunction with a database which can store the data once you've calculated it. Alternately, you could use a hosted service like Amazon's SQS. The client would consume an item from the queue, generate the successors, and enqueue those, as well as adding the outcome of the item it just consumed to the queue. If the state is an end-state, it can propagate scoring information up to parent elements by consulting the database.
Two caveats to bear in mind:
The number of items in the queue will likely grow exponentially as you explore the tree, with each work item causing several more to be enqueued. Be prepared for a very long queue.
Depending on your game, it may be possible for there to be multiple paths to the same game state. You'll need to check for and eliminate duplicates, and your database will need to be structured so that it's a graph (possibly with cycles!), not a tree.
The first thing that popped into my mind is the Linda-style of a shared 'whiteboard', where different processes can consume 'problems' off the whiteboard, add new problems to the whiteboard, and add 'solutions' to the whiteboard.
Perhaps the Cassandra project is the more modern version of Linda.
There have been many attempts to parallelize problems across distributed computer systems; Folding#Home provides a framework that executes binary blob 'cores' to solve protein folding problems. Distributed.net might have started the modern incarnation of distributed problem solving, and might have clients that you can start from.
This question is about a whole class of similar problems, but I'll ask it as a concrete example.
I have a server with a file system whose contents fluctuate. I need to monitor the available space on this file system to ensure that it doesn't fill up. For the sake of argument, let's suppose that if it fills up, the server goes down.
It doesn't really matter what it is -- it might, for example, be a queue of "work".
During "normal" operation, the available space varies within "normal" limits, but there may be pathologies:
Some other (possibly external)
component that adds work may run out
of control
Some component that removes work seizes up, but remains undetected
The statistical characteristics of the process are basically unknown.
What I'm looking for is an algorithm that takes, as input, timed periodic measurements of the available space (alternative suggestions for input are welcome), and produces as output, an alarm when things are "abnormal" and the file system is "likely to fill up". It is obviously important to avoid false negatives, but almost as important to avoid false positives, to avoid numbing the brain of the sysadmin who gets the alarm.
I appreciate that there are alternative solutions like throwing more storage space at the underlying problem, but I have actually experienced instances where 1000 times wasn't enough.
Algorithms which consider stored historical measurements are fine, although on-the-fly algorithms which minimise the amount of historic data are preferred.
I have accepted Frank's answer, and am now going back to the drawing-board to study his references in depth.
There are three cases, I think, of interest, not in order:
The "Harrods' Sale has just started" scenario: a peak of activity that at one-second resolution is "off the dial", but doesn't represent a real danger of resource depletion;
The "Global Warming" scenario: needing to plan for (relatively) stable growth; and
The "Google is sending me an unsolicited copy of The Index" scenario: this will deplete all my resources in relatively short order unless I do something to stop it.
It's the last one that's (I think) most interesting, and challenging, from a sysadmin's point of view..
If it is actually related to a queue of work, then queueing theory may be the best route to an answer.
For the general case you could perhaps attempt a (multiple?) linear regression on the historical data, to detect if there is a statistically significant rising trend in the resource usage that is likely to lead to problems if it continues (you may also be able to predict how long it must continue to lead to problems with this technique - just set a threshold for 'problem' and use the slope of the trend to determine how long it will take). You would have to play around with this and with the variables you collect though, to see if there is any statistically significant relationship that you can discover in the first place.
Although it covers a completely different topic (global warming), I've found tamino's blog (tamino.wordpress.com) to be a very good resource on statistical analysis of data that is full of knowns and unknowns. For example, see this post.
edit: as per my comment I think the problem is somewhat analogous to the GW problem. You have short term bursts of activity which average out to zero, and long term trends superimposed that you are interested in. Also there is probably more than one long term trend, and it changes from time to time. Tamino describes a technique which may be suitable for this, but unfortunately I cannot find the post I'm thinking of. It involves sliding regressions along the data (imagine multiple lines fitted to noisy data), and letting the data pick the inflection points. If you could do this then you could perhaps identify a significant change in the trend. Unfortunately it may only be identifiable after the fact, as you may need to accumulate a lot of data to get significance. But it might still be in time to head off resource depletion. At least it may give you a robust way to determine what kind of safety margin and resources in reserve you need in future.