I've got a phantomjs app (http://css.benjaminbenben.com) running on heroku - it works well for some time but then I have to run heroku restart because it requests start timing out.
I'm looking for a stop-gap solution (I've gone from around 6 to 4500 daily visitors over the last week), and I was considering exiting the process after it had served a set number of requests to fire a restart.
Will this work? And would this be considered bad practice?
(in case you're interested, the app source is here - https://github.com/benfoxall/wtcss)

It'd work, as long as you don't crash within I think 10 minutes of the last crash. If it's too frequent the process will stay down.
It's not bad practice, but it's not great practice. You should figure out what is causing your server to hang, of course.

Related

Inconsistent crashes on Heroku app: where to look?

Disclaimer: Please tell me if the question is too broad, and I will do my best to narrow it down.
We have an Heroku app which is running 2 web 1X dynos. This infrastructure has been running for the last 9 months.
However, in the last few weeks, we had several episodes where the app would see its response times skyrocketing for about an hour, before returning to normal without us doing anything about it.
On the pictures below, you can find an extract of Heroku Metrics during one of these "episodes", which happened yesterday afternoon.
As you can see, response time is going up and eventually, almost any request made to the server gets a timeout. During the event, it was barely possible to even load the home page of our website, hosted on this app. Most of the times, we would get the "Application Error" Heroku page.
What I see is:
The amount of requests to the server (failed or not) was not crazily high (less than 1000 every 10 minutes). For this reason, I think a DDOS attack is out of the picture.
Everything that is shown by Heroku Logs is that the failed request get a 503 (Service Unavailable) error, which would make me think about an overload.
The dynos do not seem overloaded. The memory usage is low, and the dyno load is reasonable, nothing unusual.
Heroku reported no issue during our crash event, as https://status.heroku.com/ states (last incident was on the 1st of July).
Restarting the dynos through several methods (from the interface, a command line or triggering an automatic deployment via our Gitlab repository) had no effect.
I am quite unsure as to how to interpretate these metrics, and what would be the solution to ensure this kind of episode does not happen again.
So my question is: where should I look? Is there some kind of documentation about how to investigate crashes on Heroku apps?

Heroku website only loads slowly the first time, even after clearing local cache?

I have a website hosted on heroku. Whenever I load it for the first time after awhile (I haven't figured out the exact interval yet, be it days or hours), it takes upwards of 15 seconds to load. Subsequent loads are <1second, even if I clear the cache completely and open it in an incognito tab.
Why might this be? It almost seems like some kind of DNS issue but I haven't really got a clue. I don't know how to troubleshoot something like this. The situation seems to be the same even on other computers at other locations.
Quoting the Heroku docs:
If an app has a free web dyno, and that dyno receives no web traffic in a 30-minute period, it will sleep.
When the dyno receives traffic again, it will take a few seconds to wake up, hence the delay you've experienced.
Note that the Heroku free tier also has a maximum number of dyno hours per month. A sleeping dyno doesn't use any hours, but it does when it's active. When the hours are used up, the dyno won't wake up to incoming traffic.
You can see your remaining quota of dyno hours with:
$ heroku ps -a <app name>
Heroku suggests upgrading to a hobby dyno if your app needs to be permanently accessible. More info on https://devcenter.heroku.com/articles/free-dyno-hours
On the free tier, Heroku dynos go to sleep if they aren't used after an hour or something like that. They take a few seconds to wake up. Pay for the service and it stops happening, or write a script to ping your site every couple minutes or something.

Is it dangerous to run git push heroku master too many times in a short period

I have been testing some viewport issues for mobile and probably ran
git push heroku master
about 50 times in the last 3 hours. I am now seeing from the google speed tests that:
Reduce server response time In our test, your server responded in 8.9
seconds. There are many factors that can slow down your server
response time. Please read our recommendations to learn how you can
monitor and measure where your server is spending the most time. Hide
details
This wasn't popping up earlier this morning and was under .5 seconds. Did I damage one of my dynos on the heroku servers?= My site isn't really getting any traffic yet so I haven't been doing any stage testing.
What is the best way to test production?
I was reading through this but was wondering if there is a better way to test production quickly.
https://devcenter.heroku.com/articles/multiple-environments
Thanks,
Jeff
There's nothing wrong with pushing many times in a row, but every time you push, your dynos will cycle. This takes something like 5 to 15 seconds depending on the size of your slug.
Generally this means that the first query sent to your app at the moment your dynos are cycling might hang for about that long. If Google checked your server's speed at that time, then that explains the response time. However, there shouldn't be any lasting effects after you finish pushing repeatedly.
If I recall correctly there is a Heroku labs option to cycle dynos to eliminate this pause, basically taking down some of your dynos and then cycling them while the other ones are still up, but I do not recommend using it as it makes code pushes very unpredictable and can result in two versions of your app being live at the same time.

Upgrade process on Heroku?

If I update an application running on Heroku using git push and this application is running on multiple dynos - how is the upgrade process run by Heroku?
All dynos at the same time?
One after another?
...?
In other words: Will there be a down-time of my "cluster", or will there be a small time-frame where different versions of my app are running in parallel, or ...?
well can not tell the internal state but what i have experienced is
Code push complete
Code compiled (slug is compiled )
After that all dynos get the latest code and get restarted. (restart take up to 30 seconds or so and during this time all requests get queue).
So there will be no down time as during the restart process all the requests get queued and there i dont think that that multiple versions of your code will be running after the deployment.
Everyone says there's 'no downtime' when updating a Heroku app, but for your app this may not be true.
I've recently worked on a reasonably sized Rails app that takes at least 25 seconds to start, and often fails to start inside the 30 seconds that Heroku allows before returning errors to your clients.
During this entire time, your users are waiting for something to happen. 30 seconds is a long time, and they may not be patient enough to wait.
Someone once told me that if you have more than 1 dyno, that they are re-started individually to give you no downtime. This is not true - Heroku Stops all dynos and then Starts all Dynos.
At no time will there be 2 versions of your app running on Heroku

Is there any reson to not reduce Ping Maximum Response Time in IIS 7

IIS includes a worker process health check "ping" function that pings worker processes every 90 seconds by default and recycles them if they don't respond. I have an application that is chronically putting app pools into a bad state and I'm curious if there is any reason not to lower this time to force IIS to recycle a failed worker process quicker. Searching the web all I can find is people that are increasing the time to allow for debugging. It seems like 90 seconds is far to high for a web application, but perhaps I'm missing something.
Well the obvious answer is that in some situations requests would take longer than 90 seconds for the worker process to return. If you can't imagine a situation where this would be appropriate, then feel free to lower it.
I wouldn't recommend going too much lower than 30 seconds. I can see situations where you get in recycle loops. However you can do testing and see what makes sense in your situation. I would recommend Siege for load testing to see how your application behaves.