I will try and keep this brief. I am attempting to make a google web app in google spreadsheet that will allow me to enter a values for min and max.
I have been able to create the GUI and add it to the panel. But I can't seem to pass the integer being entered into another function. I've tried everything, I'm relatively new to creating Google Script so I'm sorry if this comes across as a bit of a noobish problem.
Here is all the code so far :
function onOpen() {
var ss = SpreadsheetApp.getActive();
var menuEntries = [];
menuEntries.push({name: "Open Dialog", functionName: "showDialog"});
ss.addMenu("Min/Max", menuEntries);
}
//creating a panel to add the min and max of low to high for scoring
function showDialog() {
max = 10;
var app = UiApp.createApplication();
app.setTitle("My Applicaition");
var panel = app.createVerticalPanel();
var textBox = app.createTextBox();
var label = app.createLabel("Set the min value for 'Low'");
//had to create a hidden element with id="min" for a global value that can be updated
var min = app.createHidden().setValue('0').setName('min').setId('min');
textBox.setName('myTextBox').setId('myTextBox');
var button = app.createButton('Submit');
panel.add(label);
panel.add(textBox);
panel.add(min);
panel.add(button);
//click handler for setting the value of min to the new value
var clickHandler = app.createServerClickHandler("responedToSubmit");
button.addClickHandler(clickHandler);
clickHandler.addCallbackElement(panel);
app.add(panel);
var doc = SpreadsheetApp.getActive();
doc.show(app);
}
function responedToSubmit(e) {
var app = UiApp.getActiveApplication();
var textBoxValue = e.parameter.myTextBox;
Logger.log(e.parameter.min);
if (typeof textBoxValue != "number") {
var num = parseInt(textBoxValue);
app.getElementById('min').setValue(num);
Logger.log("textBoxValue is = "+textBoxValue+"\n min value is = "+e.parameter.min);
} else {
throw "value needs to be set as number";
}
return app.close();
}
This is where I believe things aren't going according to plan :
function responedToSubmit(e) {
var app = UiApp.getActiveApplication();
var textBoxValue = e.parameter.myTextBox;
Logger.log(e.parameter.min);
if (typeof textBoxValue != "number") {
var num = parseInt(textBoxValue);
app.getElementById('min').setValue(num);
Logger.log("textBoxValue is = "+textBoxValue+"\n min value is = "+e.parameter.min);
} else {
throw "value needs to be set as number";
}
return app.close();
}
I find that each time I test the .setValue() will not update the value of 'min' and I cannot see why. Can you please help?
You need to add textBox element to callBack elements list of your clickHandler.
Try this:
//click handler for setting the value of min to the new value
var clickHandler = app.createServerClickHandler("responedToSubmit");
clickHandler.addCallbackElement(panel);
clickHandler.addCallbackElement(textBox);
button.addClickHandler(clickHandler);
app.add(panel);
Related
I'm creating a social media outreach tracker. I want to create a drop-down list of the contact name. The problem is that I have two sources of names on two different sheets.
I wrote a script that pulls the names from the two different sources and combines them to a single array.
I was hoping to set the source range as that array.
Here is my code:
function setDataValid_(range, sourceRange) {
var rule = SpreadsheetApp.newDataValidation()
.requireValueInRange(sourceRange, true)
.build();
range.setDataValidation(rule);
}
function onEdit() {
var auditionsSheet = SpreadsheetApp.getActiveSpreadsheet();
var castingDirectorsTab = auditionsSheet.getSheetByName("Casting Directors");
var contactsTab = auditionsSheet.getSheetByName("Contacts");
var socialMediaOutreachTab = auditionsSheet.getSheetByName("Social Media Outreach");
var lastRowCD = castingDirectorsTab.getLastRow();
var lastRowContacts = contactsTab.getLastRow();
var activeCell = socialMediaOutreachTab.getActiveCell();
var activeColumn = activeCell.getColumn();
// get data
var castingDirectorNameData = castingDirectorsTab.getRange(2, 1, lastRowCD, 1).getValues();
var contactNameData = contactsTab.getRange(2, 1, lastRowContacts, 1).getValues();
//get name data to a single arrays
var castingDirectorName = [];
castingDirectorNameData.forEach(function(yr) {
castingDirectorName.push(yr[0]);
});
var contactName = [];
contactNameData.forEach(function(yr) {
contactName.push(yr[0]);
});
// get rid of the empty bits in the arrays
for (var x = castingDirectorName.length-1; x > 0; x--) {
if ( castingDirectorName[x][0] === undefined ) {
castingDirectorName.splice( x, 1 )
}
}
for (var x = contactName.length-1; x > 0; x--) {
if ( contactName[x][0] === undefined ) {
contactName.splice( x, 1 )
}
}
//combine two data sources for data validation
var combinedNames = [];
combinedNames.push(castingDirectorName + contactName);
Logger.log (combinedNames);
Logger.log( typeof combinedNames);
// data validation set up and build
if (activeColumn == 1 && auditionsSheet.getName() == "Social Media Outreach") {
var range = auditionsSheet.getRange(activeCell.getRow(), activeColumn +1);
var sourceRange = combinedNames;
setDataValid_(range, sourceRange)
}
}
When I enter a date in Col A on Social Media Outreach, nothing happens in Col 2.
I was using an existing working nested data validation script I have but the sourceRange pulls from a sheet based on the value in the active cell. Here is that code:
function setDataValid_(range, sourceRange) {
var rule = SpreadsheetApp.newDataValidation()
.requireValueInRange(sourceRange, true)
.build();
range.setDataValidation(rule);
}
function onEdit() {
var aSheet = SpreadsheetApp.getActiveSheet();
var aCell = aSheet.getActiveCell();
var aColumn = aCell.getColumn();
// data validation for Auditions Tab Projet Type to Project Details
if (aColumn == 9 && aSheet.getName() == 'Auditions') {
var range = aSheet.getRange(aCell.getRow(), aColumn + 1);
var sourceRange = SpreadsheetApp.getActiveSpreadsheet().getRangeByName('RefTables!' + aCell.getValue())
setDataValid_(range, sourceRange)
}
}
For this script when I select from the data validation drop-down, a new data validation comes up in the next col with the appropriate secondary data validation.
So the question is, can the source range be set to an array or do I need to put the names back into my sheet to reference a la the second script.
I've looked through the documentation and searched and can't find an answer. I'm relatively new to GAS and am not sure of all the inner workings of the data validation builder.
I've built a simple Student Information platform using Google Sheets. It allows the user to query, update and create new student info on a user interface. Please refer to this sheet to see how it works.
The functions to Refresh/Update/Save are inside the Actions button on a menu bar. Everything seems to work well however when the number of records increases, say above 100 records, all the functions slow down and it gets extremely slow with 200+ records.
Appreciate if anyone could help to take a look at the scripts as I suspect they need to be optimized.
Many thanks in advance!
function UpdateDataIntoMaster() { //This script is used in the SAVE button in UPDATE sheet)
/*Get data from UPDATE Sheet*/
var ss = SpreadsheetApp.openById("11Djp9UmXbtWv7VitZFfo0X4Ctet3O8Amh4xADNKOZgY");
var sheet = ss.getSheetByName('UPDATE');
var range = sheet.getRange("D30:AE30"); //All data transposed into this line. MUST be updated if more fields are added into the Data sheet
var values = range.getValues();
var rangeForKey = sheet.getRange("D30") //Student Name is used as the
key identifier
var keyValue = rangeForKey.getValue();
/*Pass in keyValue(identifier = Student Name)
and all data in the function below in order
to update master data sheet*/
updDbase(keyValue,values);
function updDbase(keyValue,values) {
var ss = SpreadsheetApp.openById("11Djp9UmXbtWv7VitZFfo0X4Ctet3O8Amh4xADNKOZgY")
var sheet = ss.getSheetByName('Data');
var data = sheet.getDataRange().getValues();
var noOfRow = values.length
var noOfCol = values[0].length
for (var i=0; i < data.length; i++) { // going through all the rows in Data sheet
var keyData = ss.getSheetByName("Data").getRange(i+1,1).getValue(); //Get the Student Name from Data sheet
if (keyData == keyValue) {
// for (var j=0; j < data[i].length; j++) { // this is going through all the cell of a row
var row = Number(i)+1;
var sh = SpreadsheetApp.getUi();
var response = sh.alert("Update Information","Are you sure you want to update the student information?", sh.ButtonSet.YES_NO);
if (response == sh.Button.YES)
{
var sheets = ss.getSheetByName("Data").getRange(row,1,noOfRow,noOfCol).setValues(values);
}//If response == YES
}
}
}
}
function CreateNew() {
/*Get data from Inquiry Sheet*/
var ss = SpreadsheetApp.openById("11Djp9UmXbtWv7VitZFfo0X4Ctet3O8Amh4xADNKOZgY");
var sheetNew = ss.getSheetByName('Create New');
var range = sheetNew.getRange("D30:AZE30"); //All data transposed into
this line
var values = range.getValues();
var rangeForKey = sheetNew.getRange("E30") //Using Student ID as key identifier
var keyValue = rangeForKey.getValue();
var noOfRow = values.length
var noOfCol = values[0].length
var sheetData = ss.getSheetByName('Data');
var lastRow = sheetData.getLastRow();
var data = sheetData.getDataRange().getValues();
for (var i=0; i < data.length; i++) { // going through all the rows in Data sheet
var keyData = sheetData.getRange(i+1,2).getValue(); //Get the Student ID from Data sheet
if (keyData == keyValue) {
AlertBox();//If Student ID is found, to prompt Student ID already
exist
return;
} //If
} //For
/*Confirming with user whether to proceed to create new entry*/
var sh = SpreadsheetApp.getUi();
var response = sh.alert("Create New Record","Are you sure you want to
create new student information?", sh.ButtonSet.YES_NO);
if (response == sh.Button.YES){
if (keyValue == ""){
var response = sh.alert("Create New Record","Unable to proceed
because Student ID is empty", sh.ButtonSet.OK);
return;}
else {
//var response = sh.alert("Create New Record","Unable to
proceed because Student ID is empty", sh.ButtonSet.OK);
var sheets =
sheetData.getRange(lastRow+1,1,1,noOfCol).setValues(values)
}
}//If
}
function EditStudentInfo() {
var ss = SpreadsheetApp.getActiveSpreadsheet().getSheetByName("Inquiry");
//var ss = SpreadsheetApp.getActive();
var protections = ss.getProtections(SpreadsheetApp.ProtectionType.RANGE);
for (var i = 0; i < protections.length; i++) {
var protection = protections[i];
if (protection.canEdit()) {
protection.remove();
}
}
}
function EditContent() {
var s = SpreadsheetApp.getActiveSpreadsheet().getSheetByName("Update");
var rangeContentCol1 = s.getRange("E3:E23");
var CopyContentCol1 = s.getRange("E3:E23").getValues();
var rangeContentCol2 = s.getRange("I3:I23");
var CopyContentCol2 = s.getRange("I3:I23").getValues();
rangeContentCol1.clearContent();
rangeContentCol2.clearContent();
var PasteContentCol1 =
s.getRange("E3:E23").setValues(CopyContentCol1);
var PasteContentCol2 = s.getRange("I3:I23").setValues(CopyContentCol2);
}
A common performance mistake people with Apps Script is doing the .getRange().getValues() within their for loops. Performance-wise these get and set calls are quite expensive.
Lucky the fix for this is quite easy - get all the data at once first, then loops through it. You actually do this already, sort of. In your script you get the whole data range, but then only use a part of the data and instead do another getValues call. I've updated the two areas in your script that had getRange() calls in a for loop --> var keyData = data[i][0];
function UpdateDataIntoMaster() { //This script is used in the SAVE button in UPDATE sheet)
/*Get data from UPDATE Sheet*/
var ss = SpreadsheetApp.openById("11Djp9UmXbtWv7VitZFfo0X4Ctet3O8Amh4xADNKOZgY");
var sheet = ss.getSheetByName('UPDATE');
var range = sheet.getRange("D30:AE30"); //All data transposed into this line. MUST be updated if more fields are added into the Data sheet
var values = range.getValues();
var rangeForKey = sheet.getRange("D30") //Student Name is used as the
key identifier
var keyValue = rangeForKey.getValue();
/*Pass in keyValue(identifier = Student Name)
and all data in the function below in order
to update master data sheet*/
updDbase(keyValue,values);
function updDbase(keyValue,values) {
var ss = SpreadsheetApp.openById("11Djp9UmXbtWv7VitZFfo0X4Ctet3O8Amh4xADNKOZgY")
var sheet = ss.getSheetByName('Data');
var data = sheet.getDataRange().getValues();
var noOfRow = values.length
var noOfCol = values[0].length
for (var i=0; i < data.length; i++) { // going through all the rows in Data sheet
var keyData = data[i][0]; //Use the data that is already loaded.
if (keyData == keyValue) {
// for (var j=0; j < data[i].length; j++) { // this is going through all the cell of a row
var row = Number(i)+1;
var sh = SpreadsheetApp.getUi();
var response = sh.alert("Update Information","Are you sure you want to update the student information?", sh.ButtonSet.YES_NO);
if (response == sh.Button.YES)
{
var sheets = ss.getSheetByName("Data").getRange(row,1,noOfRow,noOfCol).setValues(values);
}//If response == YES
}
}
}
}
function CreateNew() {
/*Get data from Inquiry Sheet*/
var ss = SpreadsheetApp.openById("11Djp9UmXbtWv7VitZFfo0X4Ctet3O8Amh4xADNKOZgY");
var sheetNew = ss.getSheetByName('Create New');
var range = sheetNew.getRange("D30:AZE30"); //All data transposed into
this line
var values = range.getValues();
var rangeForKey = sheetNew.getRange("E30") //Using Student ID as key identifier
var keyValue = rangeForKey.getValue();
var noOfRow = values.length
var noOfCol = values[0].length
var sheetData = ss.getSheetByName('Data');
var lastRow = sheetData.getLastRow();
var data = sheetData.getDataRange().getValues();
for (var i=0; i < data.length; i++) { // going through all the rows in Data sheet
var keyData = data[i][0]; //Use the data that is already loaded.
if (keyData == keyValue) {
AlertBox();//If Student ID is found, to prompt Student ID already
exist
return;
} //If
} //For
/*Confirming with user whether to proceed to create new entry*/
var sh = SpreadsheetApp.getUi();
var response = sh.alert("Create New Record","Are you sure you want to
create new student information?", sh.ButtonSet.YES_NO);
if (response == sh.Button.YES){
if (keyValue == ""){
var response = sh.alert("Create New Record","Unable to proceed
because Student ID is empty", sh.ButtonSet.OK);
return;}
else {
//var response = sh.alert("Create New Record","Unable to
proceed because Student ID is empty", sh.ButtonSet.OK);
var sheets =
sheetData.getRange(lastRow+1,1,1,noOfCol).setValues(values)
}
}//If
}
function EditStudentInfo() {
var ss = SpreadsheetApp.getActiveSpreadsheet().getSheetByName("Inquiry");
//var ss = SpreadsheetApp.getActive();
var protections = ss.getProtections(SpreadsheetApp.ProtectionType.RANGE);
for (var i = 0; i < protections.length; i++) {
var protection = protections[i];
if (protection.canEdit()) {
protection.remove();
}
}
}
function EditContent() {
var s = SpreadsheetApp.getActiveSpreadsheet().getSheetByName("Update");
var rangeContentCol1 = s.getRange("E3:E23");
var CopyContentCol1 = s.getRange("E3:E23").getValues();
var rangeContentCol2 = s.getRange("I3:I23");
var CopyContentCol2 = s.getRange("I3:I23").getValues();
rangeContentCol1.clearContent();
rangeContentCol2.clearContent();
var PasteContentCol1 =
s.getRange("E3:E23").setValues(CopyContentCol1);
var PasteContentCol2 = s.getRange("I3:I23").setValues(CopyContentCol2);
}
Give this a test and let me know if it helps!
Full disclosure, I am in no way a programmer of any kind. My library was looking for an easier way for multiple locations to add events to the public calendar.
Eventually I stumbled upon this script which I was able to adapt for our needs. However, the one change they would like is to have the end time default to 2 hours later. For example, if an event starts at 1 then the end time automatically defaults to 3.
Can anyone show me what change in the script I need to make for that to happen? Here is the test form that we use to enter the dates. Right now the end time is entered manually but I'd imagine that would have to be removed, correct?
Any help in figuring this out would be greatly appreciated.
Thanks!
//insert your google calendar ID
var calendarId = "ID-FOR-TEST-CALENDAR";
//index (starting from 1) of each column in the sheet
var titleIndex = 2;
var descriptionIndex = 3;
var startDateIndex = 4;
var endDateIndex = 5;
var googleCalendarIndex = 6;
/*
find the row where the Google Calendar Event ID is blank or null
The data of this row will be used to create a new calendar event
*/
function findRow(sheet) {
var sheet = SpreadsheetApp.getActiveSheet();
var dataRange = sheet.getDataRange();
var values = dataRange.getValues();
for (var i = 0; i < values.length; i++) {
if(values[i][googleCalendarIndex-1]=="" || values[i][googleCalendarIndex-1]==null)
newEvent(i+1);
}
};
/*
get the data of the new row by calling getSheetData() and
create a new Calendar event by calling submitToGoogleCalendar()
*/
function newEvent(row){
var sheet = SpreadsheetApp.getActiveSheet();
var eventId = submitToGoogleCalendar(getSheetData(sheet,row),null)
if(eventId!=null)
sheet.getRange(row,googleCalendarIndex,1,1).setValue(eventId);
};
/*
Store the data of a row in an Array
*/
function getSheetData(sheet,row)
{
var data = new Array();
data.title=sheet.getRange(row,titleIndex,1,1).getValue();
data.description=sheet.getRange(row,descriptionIndex,1,1).getValue();
data.startDate = sheet.getRange(row,startDateIndex,1,1).getValue();
data.endDate = sheet.getRange(row,endDateIndex,1,1).getValue();
return data;
};
/*
if a cell is edited in the sheet, get all the data of the corresponding row and
create a new calendar event (after deleting the old event) by calling submitToGoogleCalendar()
*/
function dataChanged(event){
var sheet = SpreadsheetApp.getActiveSheet();
var row = event.range.getRow();
var eventId = sheet.getRange(row,googleCalendarIndex,1,1).getValue();
var eventId = submitToGoogleCalendar(getSheetData(sheet,row),eventId)
if(eventId!=null)
sheet.getRange(row,googleCalendarIndex,1,1).setValue(eventId);
};
/*
This function creates an event in the Google Calendar and returns the calendar event ID
which is stored in the last column of the sheet
*/
function submitToGoogleCalendar(sheetData,eventId) {
// some simple validations ;-)
if(sheetData.title == "" || sheetData.startDate == "" || sheetData.startDate == null)
return null;
var cal = CalendarApp.getCalendarById(calendarId);
var start = new Date(sheetData.startDate);
var end = new Date(sheetData.endDate);
// some simple date validations
if(start > end)
return null;
var event = null;
//if eventId is null (when called by newEvent()) create a new calendar event
if(eventId==null)
{
event = cal.createEvent(sheetData.title, start, end, {
description : sheetData.description,
});
return event.getId();
}
/*
else if the eventid is not null (when called by dataChanged()), delete the calendar event
and create a new event with the modified data by calling this function again
*/
else
{
event = cal.getEventSeriesById(eventId);
event.deleteEventSeries();
return submitToGoogleCalendar(sheetData,null);
}
return event.getId();
};
Without having tried it myself, I believe you could do it like this:
function submitToGoogleCalendar(sheetData,eventId) {
var cal = CalendarApp.getCalendarById(calendarId);
var start = new Date(sheetData.startDate);
var end = new Date(sheetData.endDate);
end.setHours(start.getHours() + 2);
...where the last line is the new line added to your original script.
To your question wether the end time should be removed, I would say yes, it should be removed.
I have a huge spreadsheet matrix, from which I create a long list of check boxes. The users then select different abilities, press search. The code the cross-checks with the database spreadsheet, returning names of the persons who has those abilities.
I need to update the "rightPanel" with the results of my search. But i simple can't figure out how to - if at all posible - update a panel in my UI..
var dataSSkey = 'sheetID'; //datasheet ID
var dataSheet = SpreadsheetApp.openById(dataSSkey).getSheetByName('Ansatte');
var groupsArray = [[],[],[],[]];
var lastRow = dataSheet.getLastRow();
var lastColumn = dataSheet.getLastColumn();
var dataArray = dataSheet.getRange(1,1,lastRow,lastColumn).getValues();
var numberGroups
var app = UiApp.createApplication().setTitle('Find Consultant');
var panel = app.createVerticalPanel();
var leftPanel = app.createVerticalPanel().setWidth(450);
var rightPanel = app.createVerticalPanel().setWidth(450);
var grid = app.createGrid(1, 2).setId('myGrid')
var outputArray = []; //to store output from search
var positiveList = [[],[]]; //array to store name and folder-ID of consultants matching
var numberPositive = 0; //number of consultants matching
function doGet() {
buildGroupsArray()
addCheckBoxesToUI()
var scrollPanel = app.createScrollPanel().setHeight(460);
//Search button
var searchButton = app.createButton('Search');
var clickHandler = app.createServerClickHandler("respondToSearch");
searchButton.addClickHandler(clickHandler);
clickHandler.addCallbackElement(panel);
var spacerImage = app.createImage("http://www.bi..ge.jpg").setHeight(3);
scrollPanel.add(panel);
rightPanel.add(app.createLabel('resultat her'));
leftPanel.add(scrollPanel);
leftPanel.add(spacerImage);
leftPanel.add(searchButton);
grid.setWidget(0, 0, leftPanel)
grid.setWidget(0, 1, rightPanel);
app.add(grid);
return app;
}
function respondToSearch(e){
var numberLogged = 0;
//define firstEmpty
var firstEmpty = "A"+lastRow;
if(lastRow !== 1){
firstEmpty = "A"+(lastRow+1);
};
//find selected competencies --> store in array + count competencies
for(i = 1; i <= lastRow; i++){
if (e.parameter["Checkbox"+i] == "true") {
var value = e.parameter["CheckboxValue"+i];
outputArray[numberLogged] = value;
numberLogged++;
}
}
for(i = 2; i <= lastColumn; i++){
var numberCorrect = 0;
//Run through rows according to content of output from selection
for(j in outputArray){
//Check if consultant own selected competency
if(dataArray[outputArray[j]][i] == "x"){
numberCorrect++; //if consultant owns selected competency then count
}
}
//if consultant owns all competencies, then add name and folder-id to array
if(numberCorrect == numberLogged){
positiveList[0][numberPositive] = dataArray[1][i]; //Add consultant name
positiveList[1][numberPositive] = dataArray[2][i]; //Add consultant-folder ID
numberPositive++ //count the number of consultants that own all competencies
}
}
for(j in positiveList[0]){
var name = positiveList[0][j];
var id = positiveList[1][j];
Logger.log(name);
Logger.log(id)
var anchor = app.createAnchor(name,'https://ww......folderviewid='+id);
rightPanel.add(anchor)
}
return app;
}
I don't really understand the problem you have...
In your handler function you only have to use app=UiApp.getActiveApplication() and from there populate the panel exactly the same way you did it in the doGet() function, ending with a return app; that will actually update the current Ui.
There are dozens of examples all around... did I misunderstand something in your question ?
Edit : following your comment.
I suppose you defined your variables outside of the doGet function hoping they will become global and so available to all the functions in your script but this is not going to work. Global variables in Google Apps script can't be updated by functions.
I would strongly recommend that you create app and panels in the doGet function and give them an ID so that you can get them back and update their values (or content) from the handler functions.
Here is a re-written version of your code (didn't test)
: (some parts are not reproduced (see //...)
var dataSSkey = 'sheetID'; //datasheet ID
var dataSheet = SpreadsheetApp.openById(dataSSkey).getSheetByName('Ansatte');
var groupsArray = [[],[],[],[]];
var lastRow = dataSheet.getLastRow();
var lastColumn = dataSheet.getLastColumn();
var dataArray = dataSheet.getRange(1,1,lastRow,lastColumn).getValues();
var numberGroups
var outputArray = []; //to store output from search
var positiveList = [[],[]]; //array to store name and folder-ID of consultants matching
var numberPositive = 0; //number of consultants matching
function doGet() {
var app = UiApp.createApplication().setTitle('Find Consultant');
var panel = app.createVerticalPanel();
var leftPanel = app.createVerticalPanel().setWidth(450).setId('leftPanel');
var rightPanel = app.createVerticalPanel().setWidth(450).setId('rightPanel');;
var grid = app.createGrid(1, 2).setId('myGrid')
buildGroupsArray(app); // in this function get app as parameter or use UiApp.getActiveApplication();
addCheckBoxesToUI(app);// in this function get app as parameter or use UiApp.getActiveApplication();
var scrollPanel = app.createScrollPanel().setHeight(460);
//...
//...
return app;
}
function respondToSearch(e){
//...
//...
var app = UiApp.getActiveApplication();
var rightPanel = app.getElementById('rightPanel');
for(j in positiveList[0]){
var name = positiveList[0][j];
var id = positiveList[1][j];
Logger.log(name);
Logger.log(id)
var anchor = app.createAnchor(name,'https://ww......folderviewid='+id);
rightPanel.add(anchor)
}
return app;
}
My first post and I must admit that I'm bad at explaining stuffs. let me try.
I have this java code in spreadsheet which adds a UI, have certain checkboxes & a chart attached to UI.
When the first (EDC) checkbox is clicked range(C2) goes as true/false, changes the chart values in data.
Since the chart doesnt automatically update, I decided to remove the existing chart and add a new one. When the code is runned for first time...the UI is visible along with Populate charts, when I click checkbox the existing chart gets delete but the populate_chart function does not. Can any one help me??? Almost my first code (such big).
function Show_chart() {
var ss = SpreadsheetApp.getActive();
var calc = ss.getSheetByName("Calculations");
var data = calc.getRange(6, 19, 22, 2)
// var values = data.getValues()
// for (var row in values) {
// for (var col in values[row]) {
// Logger.log(values[row][col]);
// }
// }
var app = UiApp.createApplication().setHeight(600).setWidth(1200).setTitle("Attrition Report");
var mygrid = app.createGrid(7, 2)
var label1 = mygrid.setWidget(0, 0, app.createLabel("EDC Project"));
var label2 = mygrid.setWidget(1, 0, app.createLabel("Customer Project"));
var label3 = mygrid.setWidget(2, 0, app.createLabel("Support"));
var checkbox1 = mygrid.setWidget(0, 1, app.createCheckBox().setName("EDC"));
var checkbox2 = mygrid.setWidget(1, 1, app.createCheckBox().setName("CP"));
var checkbox3 = mygrid.setWidget(2, 1, app.createCheckBox().setName("Support"));
checkbox1.addClickHandler(app.createServerHandler("myClickHandler"));
var panel = app.createVerticalPanel();
panel.add(mygrid);
app.add(panel);
populate_charts()
ss.show(app);
}
function populate_charts(){
var ss = SpreadsheetApp.getActive();
var app = UiApp.getActiveApplication();
var calc = ss.getSheetByName("Calculations");
var data = calc.getRange(6, 19, 22, 2);
//1200 300
var chart = Charts.newLineChart().setDimensions(300, 100)
.setDataTable(data)
.build();
var chartpanel = app.createHorizontalPanel().setId("tbd");
chartpanel.add(chart);
return app.add(chartpanel);
}
function myClickHandler(e) {
var ss = SpreadsheetApp.getActive();
var calc = ss.getSheetByName("Calculations");
var app = UiApp.getActiveApplication();
// var data = calc.getRange(6, 19, 22, 2)
var chvalue = e.parameter.EDC;
calc.getRange("C2").setValue(chvalue);
var del = app.getElementById("tbd");
return app.remove(del);
populate_charts()
}
Thanks...
You should call populate_charts(); before return app.remove(del); in your function myClickHandler.
Whatever you add after returnin your function simply doesn't happen.
Don't delete an UiElement and recreate a new element with the same Id - very bad things will happen in UiApp, or GWT which is the mechanics behind UiApp.
You could simplify populate_charts:
function populate_charts(app, sSheet){
var data = sSheet.getSheetByName("Calculations").getRange(6, 19, 22, 2);
var chart = Charts.newLineChart().setDimensions(300, 100)
.setDataTable(data).build();
return chart;
}
myClickHandler could be reduced as well:
function myClickHandler(e) {
var app = UiApp.getActiveApplication();
var chvalue = e.parameter.EDC;
var sSheet = SpreadsheetApp.getActive();
sSheet.getSheetByName("Calculations").getRange("C2").setValue(chvalue);
app.getElementById("chartContainer").clear().add(populate_charts(app, sSheet));
return app;
}
The last 7 lines of Show_chart changed to:
app.add(mygrid.setId('grid'));
app.add(app.createFlowPanel()
.setId('chartContainer').add(populate_charts(app, ss)));
checkbox1.addClickHandler(
app.createServerHandler('myClickHandler')
.addCallbackElement(app.getElementById('grid'))
.addCallbackElement(app.getElementById('chartContainer')));
return app;
}
Don't forget to add all missing semicolons ; .