I am trying to simulate 100 threads request with 4 different users, all the 97 requests were sent and received but the remaining 3 requests still showing as executing.
I have to manually stop the Jmeter and then only the remaining request are passed.
Why is this happening?
Your machine probably doesn't have the resources to execute the requests or Java isn't configured appropriately. Take a look at this article and this one
In case you are running jmeter in a window mode, please check for attributes provided for heap memory etc. (those should not exceed more than half of the RAM on the machine you are running upon)
Related
I am running a load test using JMeter with 200 users for approx 1hr. So, the observation is that a few threads are stuck even after the duration completes. Like 60 out of 200 get stuck. When I take the thread dump and observe that these threads are in a Runnable state. Any suggestions for resolving this issue? And I do not see anything meaningful from the JMeter log file.
You will find an unexpected increase in response time at the end of that time.
This is because of the thread's insufficient ramp-down time. Some of your threads were active and made requests to the server and didn't receive the response but threads were closed forcefully. If your JMeter test is stopped forcefully, all the active threads will be closed immediately. So the requests generated by those threads will get higher response time.
You can use Ultimate Thread Group for graceful shutdown time(ramp-down time) of threads just like the ramp-up time.
Here is an example setting:
This is not a normal behaviour for a JMeter test, most probably it indicates that either JMeter engine is overloaded (not properly configured for high loads) or the machine where JMeter is running is overloaded (i.e. lacks RAM and starts intensive swapping)
Make sure to follow JMeter Best Practices (run your test in non-GUI mode, remove all Listeners and test elements you don't need, increase JMeter heap size, etc.)
Make sure to monitor the essential health metrics of the machine where JMeter is running (CPU, RAM, Network and Disk IO, Swap file usage). You can use JMeter PerfMon Plugin for this if you don't have any better software
It might be the case you'll have to switch to Distributed Testing, 200 virtual users doesn't seem to be a "high" load to me, but it depends on what exactly these users are doing, if they're uploading/downloading large files it may be sufficient to cause the problems
Going forward consider adding the thread dump and jmeter log file contents to your question as it doesn't contain any clues so we can only come up with "blind shot" answers
You may want to check your HTTP timeouts.
I usually set Connect Timeout to 5000 milliseconds, and Response Time out to 30000.
Your values may vary for your specific environment/ application.
In this way, if things go bad on the server under test, all requests terminate within the timeout (with errors).
You have also to consider that, if you are retrieving an HTML page with all its embedded objects, and the web server is stuck, you need to wait for multiple timeouts to expire before the operation terminate.
I have come across a situation where I can`t decide what scenario would be best. I have written my test in JMeter as follows:
I have one test plan that runs test in consecutive.
I have 4 thread groups and each thread group has the following properties:
No of threads: 8000
Ramp-up period: 60 sec
Loop count : 10
Same user on each iteration: true
I was having connection error, connection time out error.
So, to make it work , when I test from localhost (same machine), I have to enter a response time out of 1800000 ms, whereas when I do the same test on a remote server, I have to enter the response time out of 3600000 ms.
Can someone please advise :
Is it a good idea to include response time? Is there any other issue I should look for instead of including a response time? Is it an alert for other issue?
Can I improve the test without using response time?
First of all, a couple of questions to you:
Do you really think that the real user will really wait for 1 hour for getting the response from the application?
How did you come to this 8000 users?
Now recommendations:
Never have JMeter and the system under test on the same machine, they are both resource intensive and they will start struggling for CPU cycles, memory pages, etc. and you won't be able to tell whether JMeter is not capable of sending requests fast enough or your application cannot respond properly
Follow JMeter Best Practices
Although the number of virtual users you can simulate with JMeter is very high it's limited by the machine/operating system resources so make sure JMeter has enough headroom to operate in terms of CPU, RAM, Network and Disk IO. The metrics can be checked using JMeter PerfMon Plugin. Once you notice that any of monitored metrics start exceeding i.e. 80% of total available capacity - mention how many users are online and this is how many you can simulate from this machine for this test. If you need more - go for Distributed Testing
The same for the system under test, if you hit the resources consumption limits you need either to upgrade the hardware or to deploy your application in clustered mode (if it supports such a mode)
I want to test 400 Concurrency Users Which allow us to pass our load testing scenario as I am using below configuration setting in Apache JMeter which will through us lots of errors.
Number of Thread (Users): 400
Ramp-Up Time: 1
Loop Count: Forever Until ( Period of 1 minutes )
We are not telepathic enough to tell what's wrong with your setup without seeing the configuration and the nature of errors.
Several generic hints:
Run your test with 1-2 users/iterations to ensure it works fine and does what it is supposed to be doing. Check requests and responses details using View Results Tree listener
Make sure to run your test in command-line non-GUI mode and disable all the Listeners while your test is running.
It is better to increase and decrease the load gradually so consider using longer ramp-up time and increase test duration accordingly. I.e.
During the first minute virtual users arrive
They then hold the load for another minute
During the last minute virtual users leave
This way you will be able to tell what was the load when the errors started occurring, what is the maximum number of users your application can support, where is the saturation point, does it recover when the load gets back to normal, etc. See JMeter Ramp-Up - The Ultimate Guide article for more details.
It might be the case you found the bottleneck, i.e. your application fails to support 400 concurrent users, now you need to find the reason which may be in:
incorrect middleware configuration (wrong web server, database, load balancer settings)
your application simply lacks resources (CPU, RAM, Network, Swap, etc.). You can check this using JMeter PerfMon Plugin
if infrastructure configuration is OK and there is enough headroom for the application to operate most probably the reason is in the application code, you need to inspect what it is doing using APM or Profiler tools and report the issue.
I am new to jmeter.
I am doing load testing on web application using recording feature in jmeter.
The issue is, If I'm giving say 100 with 100s ramp up time in Thread pool for 50 continuous web requests(sequence of web application flow).
If the server is not responding at 25th request(total 50) of 45th Thread(total 100) it is stuck at that point and not sending requests for remaining 55 threads.
What should I do.? is there any other method to initiate the threads.
it is not sending the threads because of many reasons
1. jmeter memory print you need to check
2. the server you are targeting will accept only no of threads.
etc are there.
if each thread processing time will take x amount of time hence n threads with x amount of time the processor is busy .
if your targeting server can only process 40 in this case i am assuming capacity as 40 , then the 41st request will only get chance , only at least one of the previous request get processed or released the thread .
too many threads might cause STUCK or BLOCKED threads at the server end in that case we either dont see response or error code . try stopping the threads you see all the reaming as failed requests
JMeter shouldn't normally act like you described. Check out jmeter.log file, it usually should have enough information to get to the bottom of problem.
It looks like you're trying to run the load test using JMeter GUI. If it's the case - please don't, JMeter is not designed for producing high load in GUI mode.
Run your test in command-line mode
Delete or disable Listeners if any
Increase JVM Heap size, JMeter comes with very little value by default.
Follow other recommendations from 9 Easy Solutions for a JMeter Load Test “Out of Memory” Failure article
I have created a test plan for creating userprofile.
I want to run my test plan for 100 users but when i run it for 10 users then it is running successfully with rump up time of 2 sec; but when i try it for 100 users & more than that it is getting failed I am giving rump uptime of 40 sec for 100 users.
I am not able to understand what may be the problem with it.
In my test plan the thread user are differentiated with id
Thanks in Advance.
It's a wide question, this behavior can be caused by
Your application under test can't handle load of 100 threads. Check logs for errors and make sure that application/web server and/or database configuration allow 100+ concurrent connections. Also you can check "Latency" metric to see if there is a problem with infrastructure or application itself.
Your load generator machine can't create 100 concurrent threads. If so - you'll need to consider JMeter Distributed Testing
Your script isn't optimized. I.e. using memory-consuming listeners like "View Results Tree", any graph listeners, regular expression extractors. Try following JMeter Performance and Tuning Tips guide and see whether it resolves your issue.
Agree with Dmitri, reason could be one of the above three.
One more thing you can try.
You can run your jmeter in ui mode for validation of your script and after validation you can run it in non-ui mode which will save lot of memory and cpu processing (basically UI is heaviest part in jmeter).
you can run your jmeter script in non-ui mode like this,
Jmeter -n -t -H proxy -P port
generally on a single dual core machine with 2 GB ram (Load Generator in your case) 100 user test can be carried out successfully.
some more things you can look at to find out the actual bottleneck
1.check application server logs (server on which your application is hosted)
if there are any failures in that then see performance counters on server (CPU, Memory, network etc) to see anything is overloaded.
(if server is windows then check using perfmon if linux then try sar)
if something is overloaded then reason is your app server cant take load of 100 users
probably try tuning it more.
2.check load generator system performance counters (JVM heap usage,CPU,Memory etc)
if JVM heap size is small enough try increasing it but if other counters are overloaded then try distributed load testing.