HI guys
I have a master / detail table, however I’m trying to apply a sequence to the detail section.
Master table contains
M_ID, DATE, PER_ID
1, 01-May-15, 1
2, 01-May-15, 2
Detail
D_ID, M_ID(FK), SEQ, ACCOUNT_ID, TASK_ID, HRS, TRAVEL_HRS
The sequence needs to increase each time a job is requested/created, however have the ability to change its order. For Each job this must start from 1.
Once the SEQ is set. I will then need to go update all current records retrospectively .
so tables would look something like
As you can see, the SEQ increases for each detail record.
The user can update the detail table via different methods. However the primary way is via a tabular form. So when a user creates a new row within the detail form this needs to increment the SEQ by one. However the user may wish to change the SEQ or order.
Hope this makes sense.

Related

ORACLE APEX / SQL DEVELOPER: Cannot get PK to autoincrement

I am trying to implement my SQLDeveloper DB into Oracle APEX. I cannot figure out how to get the PK's in my table to auto-increment starting from a certain value (i.e. 400001). I have tried making triggers and sequences but when I try to add a row using a form in APEX, my PK increments from 40 for some reason.
Here is my APEX form outcome
enter image description here
Here is how it inserts into SQL Developer
enter image description here
Basically, can someone describe to me how I can edit the existing trigger, or create a sequence, that would make application_id of a new entry auto-increment by 1.
Thanks!
Find max application_id:
select max(application_id) From your_Table;
Suppose it is 400010 (as screenshot suggests). Now recreate the sequence (presuming its name is seq_app):
drop sequence seq_app;
create sequence seq_app start with 400011 increment by 1 nocache;
Trigger is most probably OK, as you see values being inserted into the table.
Side note: sequences will be unique, but not necessarily gapless. CACHE (or NOCACHE) might affect that, but - for performance sake, you'd rather let Oracle cache sequence numbers (default is 20) which means that - if you don't use some of those cached numbers, they will be lost. I wouldn't worry, if I were you.

PLSQL Daily record of changes on table, then select from day

Oracle PL SQL question: One table should be archived day by day. Table counts about 50.000 records. But only few records during a day are changed. Second table (destination/history table) has one additional field - import_date. Two days = 100.000 records. Should be 50.000 + feq records with informations about changes during a day.
I need one simple solution to copy data from source table to destination like a "LOG" - only changes are copied/registered. But I should have possibility to check dataset of source table from given day.
Is there such mechanism like MERGE or something like that?
Normally you'd have a day_table and a master_table. All records are loaded from the day_table into master and only master is manipulated with the day table used to store the raw data.
You could add a new column to master such as a date_modified and have the app update this field when a record changes, or a flag used to indicate it's changed.
Another way to do this is to have an active/latest flag. Instead of changing the record it is duplicated with a flag set to indicate this is a better/old record. This might be easier for comparison
e.g. select * from master_table where record = 'abcd'
This would show 2 rows - the original loaded at 1pm and the modified active one changed at 2pm.
There's no need to have another table, you could base a view on this flag then
e.g. CHANGED_RECORDS_VIEW = select * from master_table where flag = 'Y'
Once i faced a similar issue. And please find the solution below.
Tables we had :
Master table always has records it and keeps adding up.
One backup table to store all the master records on daily basis.
Solution:
From morning to evening records are inserted and updated into the master table. The concept of finding out the new records was the timestamp. Whenever a new record is inserted/updated then corresponding timestamp is added and kept.
At night, we had created a job schedule to run a procedure (Create_Job-> please check oracle documentations for further learning) which runs exactly at 10:00 pm to bulk collect all the records available in master table based on today's date and insert into the backup table.
This scenrio which i have explained to you will help you. Please check out the concept of Job scheduling which will help you. Thank you .

Oracle 12c - refreshing the data in my tables based on the data from warehouse tables

I need to update the some tables in my application from some other warehouse tables which would be updating weekly or biweekly. I should update my tables based on those. And these are having foreign keys in another tables. So I cannot just truncate the table and reinsert the whole data every time. So I have to take the delta and update accordingly based on few primary key columns which doesn't change. Need some inputs on how to implement this approach.
My approach:
Check the last updated time of those tables, views.
If it is most recent then compare each row based on the primary key in my table and warehouse table.
update each column if it is different.
Do nothing if there is no change in columns.
insert if there is a new record.
My Question:
How do I implement this? Writing a PL/SQL code is it a good and efficient way? as the expected number of records are around 800K.
Please provide any sample code or links.
I would go for Pl/Sql and bulk collect forall method. You can use minus in your cursor in order to reduce data size and calculating difference.
You can check this site for more information about bulk collect, forall and engines: http://www.oracle.com/technetwork/issue-archive/2012/12-sep/o52plsql-1709862.html
There are many parts to your question above and I will answer as best I can:
While it is possible to disable referencing foreign keys, truncate the table, repopulate the table with the updated data then reenable the foreign keys, given your requirements described above I don't believe truncating the table each time to be optimal
Yes, in principle PL/SQL is a good way to achieve what you are wanting to
achieve as this is too complex to deal with in native SQL and PL/SQL is an efficient alternative
Conceptually, the approach I would take is something like as follows:
Initial set up:
create a sequence called activity_seq
Add an "activity_id" column of type number to your source tables with a unique constraint
Add a trigger to the source table/s setting activity_id = activity_seq.nextval for each insert / update of a table row
create some kind of master table to hold the "last processed activity id" value
Then bi/weekly:
retrieve the value of "last processed activity id" from the master
table
select all rows in the source table/s having activity_id value > "last processed activity id" value
iterate through the selected source rows and update the target if a match is found based on whatever your match criterion is, or if
no match is found then insert a new row into the target (I assume
there is no delete as you do not mention it)
on completion, update the master table "last processed activity id" to the greatest value of activity_id for the source rows
processed in step 3 above.
(please note that, depending on your environment and the number of rows processed, the above process may need to be split and repeated over a number of transactions)
I hope this proves helpful

Query a table in different ways or orderings in Cassandra

I've recently started to play around with Cassandra. My understanding is that in a Cassandra table you define 2 keys, which can be either single column or composites:
The Partitioning Key: determines how to distribute data across nodes
The Clustering Key: determines in which order the records of a same partitioning key (i.e. within a same node) are written. This is also the order in which the records will be read.
Data from a table will always be sorted in the same order, which is the order of the clustering key column(s). So a table must be designed for a specific query.
But what if I need to perform 2 different queries on the data from a table. What is the best way to solve this when using Cassandra ?
Example Scenario
Let's say I have a simple table containing posts that users have written :
CREATE TABLE posts (
username varchar,
creation timestamp,
content varchar,
PRIMARY KEY ((username), creation)
);
This table was "designed" to perform the following query, which works very well for me:
SELECT * FROM posts WHERE username='luke' [ORDER BY creation DESC];
Queries
But what if I need to get all posts regardless of the username, in order of time:
Query (1): SELECT * FROM posts ORDER BY creation;
Or get the posts in alphabetical order of the content:
Query (2): SELECT * FROM posts WHERE username='luke' ORDER BY content;
I know that it's not possible given the table I created, but what are the alternatives and best practices to solve this ?
Solution Ideas
Here are a few ideas spawned from my imagination (just to show that at least I tried):
Querying with the IN clause to select posts from many users. This could help in Query (1). When using the IN clause, you can fetch globally sorted results if you disable paging. But using the IN clause quickly leads to bad performance when the number of usernames grows.
Maintaining full copies of the table for each query, each copy using its own PRIMARY KEY adapted to the query it is trying to serve.
Having a main table with a UUID as partitioning key. Then creating smaller copies of the table for each query, which only contain the (key) columns useful for their own sort order, and the UUID for each row of the main table. The smaller tables would serve only as "sorting indexes" to query a list of UUID as result, which can then be fetched using the main table.
I'm new to NoSQL, I would just want to know what is the correct/durable/efficient way of doing this.
The SELECT * FROM posts ORDER BY creation; will results in a full cluster scan because you do not provide any partition key. And the ORDER BY clause in this query won't work anyway.
Your requirement I need to get all posts regardless of the username, in order of time is very hard to achieve in a distributed system, it supposes to:
fetch all user posts and move them to a single node (coordinator)
order them by date
take top N latest posts
Point 1. require a full table scan. Indeed as long as you don't fetch all records, the ordering can not be achieve. Unless you use Cassandra clustering column to order at insertion time. But in this case, it means that all posts are being stored in the same partition and this partition will grow forever ...
Query SELECT * FROM posts WHERE username='luke' ORDER BY content; is possible using a denormalized table or with the new materialized view feature (http://www.doanduyhai.com/blog/?p=1930)
Question 1:
Depending on your use case I bet you could model this with time buckets, depending on the range of times you're interested in.
You can do this by making the primary key a year,year-month, or year-month-day depending on your use case (or finer time intervals)
The basic idea is that you bucket changes for what suites your use case. For example:
If you often need to search these posts over months in the past, then you may want to use the year as the PK.
If you usually need to search the posts over several days in the past, then you may want to use a year-month as the PK.
If you usually need to search the post for yesterday or a couple of days, then you may want to use a year-month-day as your PK.
I'll give a fleshed out example with yyyy-mm-dd as the PK:
The table will now be:
CREATE TABLE posts_by_creation (
creation_year int,
creation_month int,
creation_day int,
creation timeuuid,
username text, -- using text instead of varchar, they're essentially the same
content text,
PRIMARY KEY ((creation_year,creation_month,creation_day), creation)
)
I changed creation to be a timeuuid to guarantee a unique row for each post creation event. If we used just a timestamp you could theoretically overwrite an existing post creation record in here.
Now we can then insert the Partition Key (PK): creation_year, creation_month, creation_day based on the current creation time:
INSERT INTO posts_by_creation (creation_year, creation_month, creation_day, creation, username, content) VALUES (2016, 4, 2, now() , 'fromanator', 'content update1';
INSERT INTO posts_by_creation (creation_year, creation_month, creation_day, creation, username, content) VALUES (2016, 4, 2, now() , 'fromanator', 'content update2';
now() is a CQL function to generate a timeUUID, you would probably want to generate this in the application instead, and parse out the yyyy-mm-dd for the PK and then insert the timeUUID in the clustered column.
For a usage case using this table, let's say you wanted to see all of the changes today, your CQL would look like:
SELECT * FROM posts_by_creation WHERE creation_year = 2016 AND creation_month = 4 AND creation_day = 2;
Or if you wanted to find all of the changes today after 5pm central:
SELECT * FROM posts_by_creation WHERE creation_year = 2016 AND creation_month = 4 AND creation_day = 2 AND creation >= minTimeuuid('2016-04-02 5:00-0600') ;
minTimeuuid() is another cql function, it will create the smallest possible timeUUID for the given time, this will guarantee that you get all of the changes from that time.
Depending on the time spans you may need to query a few different partition keys, but it shouldn't be that hard to implement. Also you would want to change your creation column to a timeuuid for your other table.
Question 2:
You'll have to create another table or use materialized views to support this new query pattern, just like you thought.
Lastly if your not on Cassandra 3.x+ or don't want to use materialized views you can use Atomic batches to ensure data consistency across your several de-normalized tables (that's what it was designed for). So in your case it would be a BATCH statement with 3 inserts of the same data to 3 different tables that support your query patterns.
The solution is to create another tables to support your queries.
For SELECT * FROM posts ORDER BY creation;, you may need some special column for grouping it, maybe by month and year, e.g. PRIMARY KEY((year, month), timestamp) this way the cassandra will have a better performance on read because it doesn't need to scan the whole cluster to get all data, it will also save the data transfer between nodes too.
Same as SELECT * FROM posts WHERE username='luke' ORDER BY content;, you must create another table for this query too. All column may be same as your first table but with the different Primary Key, because you cannot order by the column that is not the clustering column.

oracle and creating history

I am working on a system to track a project's history. There are 3 main tables: projects, tasks, and clients then 3 history tables for each. I have the following trigger on projects table.
CREATE OR REPLACE TRIGGER mySchema.trg_projectHistory
BEFORE UPDATE OR DELETE
ON mySchema.projects REFERENCING NEW AS New OLD AS Old
FOR EACH ROW
declare tmpVersion number;
BEGIN
select myPackage.GETPROJECTVERSION( :OLD.project_ID ) into tmpVersion from dual;
INSERT INTO mySchema.projectHistiry
( project_ID, ..., version )
VALUES
( :OLD.project_ID,
...
tmpVersion
);
EXCEPTION
WHEN OTHERS THEN
-- Consider logging the error and then re-raise
RAISE;
END ;
/
I got three triggers for each of my tables (projects, tasks, clients).
Here is the challenge: Not everything changes at the same time. For example, somebody could just update a certain tasks' cost. In this case, only one trigger fires and I got one insert. I'd like to insert one record into 3 history tables at once even if nothing changed in the projects and clients tables.
Also, what if somebody changes a project's end_date, the cost, and say the picks another client. Now, I have three triggers firing at the same time. Only in this case, I will have one record inserted into my three history tables. (which I want)
If i modify the triggers to do insert into 3 tables for the first example, then I will have 9 inserts when the second example happens.
Not quite sure how to tackle this. any help?
To me it sounds as if you want a transaction-level snapshot of the three tables created whenever you make a change to any of those tables.
Have a row level trigger on each of the three tables that calls a single packaged procedure with the project id and optionally client / task id.
The packaged procedure inserts into all three history tables the relevant project, client and tasks where there isn't already a history record for that key and transaction (ie you don't want duplicates). You got a couple of choices when it comes to the latter. You can use a unique constraint and either a BULK select and insert with FORALL/SAVE EXCEPTIONS, DML error logging (EXCEPTIONS INTO) or a INSERT...SELECT...WHERE NOT EXISTS...
You do need to keep track of your transactions. I'm guessing this is what you were doing with myPackage.GETPROJECTVERSION. The trick here is to only increment versions when you have a new transaction. If, when you get a new version number, you hold it in a pacakge level variable, you can easily tell whether your session has already got a version number or not.
If your session is going to run multiple transaction, you'll need to 'clear' out the session-level version number if it was part of a previous transaction. If you get DBMS_TRANSACTION.LOCAL_TRANSACTION_ID and store that at the package/session level as well, you can determine if you are in a new transaction, or part of the same transaction.
From your description, it looks like you would be capturing the effective and end date for each of the history rows once any of the original rows change.
Eg. Project_hist table would have eff_date and exp_date which has the start and end date for a given project. Project table would just have an effective date. (as it is the active project).
I don't see why you want to insert rows for all three history tables when only one of the table values is updated. You can pretty much get the details as you need (as of a given date) using your current logic. (inserting old row in the history table for the table that has been updated only.).
Alternative answer.
Have a look at Total Recall / Flashback Archive
You can set the retention to 10 years, and use a simple AS OF TIMESTAMP to get the data as of any particular timestamp.
Not sure on performance though. It may be easier to have a daily or weekly retention and then a separate scheduled job that picks out the older versions using the VERSIONS BETWEEN syntax and stores them in your history table.