PLSQL Daily record of changes on table, then select from day - oracle

Oracle PL SQL question: One table should be archived day by day. Table counts about 50.000 records. But only few records during a day are changed. Second table (destination/history table) has one additional field - import_date. Two days = 100.000 records. Should be 50.000 + feq records with informations about changes during a day.
I need one simple solution to copy data from source table to destination like a "LOG" - only changes are copied/registered. But I should have possibility to check dataset of source table from given day.
Is there such mechanism like MERGE or something like that?

Normally you'd have a day_table and a master_table. All records are loaded from the day_table into master and only master is manipulated with the day table used to store the raw data.
You could add a new column to master such as a date_modified and have the app update this field when a record changes, or a flag used to indicate it's changed.
Another way to do this is to have an active/latest flag. Instead of changing the record it is duplicated with a flag set to indicate this is a better/old record. This might be easier for comparison
e.g. select * from master_table where record = 'abcd'
This would show 2 rows - the original loaded at 1pm and the modified active one changed at 2pm.
There's no need to have another table, you could base a view on this flag then
e.g. CHANGED_RECORDS_VIEW = select * from master_table where flag = 'Y'

Once i faced a similar issue. And please find the solution below.
Tables we had :
Master table always has records it and keeps adding up.
One backup table to store all the master records on daily basis.
Solution:
From morning to evening records are inserted and updated into the master table. The concept of finding out the new records was the timestamp. Whenever a new record is inserted/updated then corresponding timestamp is added and kept.
At night, we had created a job schedule to run a procedure (Create_Job-> please check oracle documentations for further learning) which runs exactly at 10:00 pm to bulk collect all the records available in master table based on today's date and insert into the backup table.
This scenrio which i have explained to you will help you. Please check out the concept of Job scheduling which will help you. Thank you .

Related

Is there any time limit on the records in table user_tab_modifications table?

I'm using user_tab_modifications table to monitor all my table's change in DB, but sometimes the records disappeared.
For example, I updated the data in table A, and ran the following SQL to flush the table user_tab_modifications so that I can see the latest information there.
exec DBMS_STATS.FLUSH_DATABASE_MONITORING_INFO;
Then
SELECT * FROM USER_TAB_MODIFICATIONS;
So I can see the record about table A in there.
But then I found the record about table A disappeared after about 1 minute even though I didn't do anything in Oracle.
(other records in user_tab_modifications do not change. No problems)
That's why and can I do some settings to change it (make sure the records there will not disappear)? Thank you.
From the documentation:
USER_TAB_MODIFICATIONS describes modifications to all tables owned by the current user that have been modified since the last time statistics were gathered on the tables.
You might want to check if some stat gathering process was running in the background on the concerned table between the time when the changes were done and when you saw the stat record disappear.

Read from a table while a transaction in going on - Oracle

I am using Oracle9i (9.2). I have a situation where I have to populate a table daily. Daily at mid night this table will be truncated and new data will be put in. The new data population takes about 10-20 mins. The issue is that this table can't be down(locked). While the new data is being inserted, the previous days data needs to be available for a select procedure.
Edit - I am looking into the transaction levels. I just need some expert opinion.
Is this possible in Oracle?
How about using two tables. Have a "current" table that has the previous days data. Then have a new table which you can load. Then when you are ready, you can "swap" the two tables, using a series of rename operations.

Oracle 12c - refreshing the data in my tables based on the data from warehouse tables

I need to update the some tables in my application from some other warehouse tables which would be updating weekly or biweekly. I should update my tables based on those. And these are having foreign keys in another tables. So I cannot just truncate the table and reinsert the whole data every time. So I have to take the delta and update accordingly based on few primary key columns which doesn't change. Need some inputs on how to implement this approach.
My approach:
Check the last updated time of those tables, views.
If it is most recent then compare each row based on the primary key in my table and warehouse table.
update each column if it is different.
Do nothing if there is no change in columns.
insert if there is a new record.
My Question:
How do I implement this? Writing a PL/SQL code is it a good and efficient way? as the expected number of records are around 800K.
Please provide any sample code or links.
I would go for Pl/Sql and bulk collect forall method. You can use minus in your cursor in order to reduce data size and calculating difference.
You can check this site for more information about bulk collect, forall and engines: http://www.oracle.com/technetwork/issue-archive/2012/12-sep/o52plsql-1709862.html
There are many parts to your question above and I will answer as best I can:
While it is possible to disable referencing foreign keys, truncate the table, repopulate the table with the updated data then reenable the foreign keys, given your requirements described above I don't believe truncating the table each time to be optimal
Yes, in principle PL/SQL is a good way to achieve what you are wanting to
achieve as this is too complex to deal with in native SQL and PL/SQL is an efficient alternative
Conceptually, the approach I would take is something like as follows:
Initial set up:
create a sequence called activity_seq
Add an "activity_id" column of type number to your source tables with a unique constraint
Add a trigger to the source table/s setting activity_id = activity_seq.nextval for each insert / update of a table row
create some kind of master table to hold the "last processed activity id" value
Then bi/weekly:
retrieve the value of "last processed activity id" from the master
table
select all rows in the source table/s having activity_id value > "last processed activity id" value
iterate through the selected source rows and update the target if a match is found based on whatever your match criterion is, or if
no match is found then insert a new row into the target (I assume
there is no delete as you do not mention it)
on completion, update the master table "last processed activity id" to the greatest value of activity_id for the source rows
processed in step 3 above.
(please note that, depending on your environment and the number of rows processed, the above process may need to be split and repeated over a number of transactions)
I hope this proves helpful

Creating a record history table - How do I create a record on creation?

For a project, I want to have a "History" table for my records. I have two tables for this (example) system:
RECORDS
ID
NAME
CREATE_DATE
RECORDS_HISTORY
ID
RECORDS_ID
LOG_DATE
LOG_TYPE
MESSAGE
When I insert a record into RECORDS, how can I automatically create an associated entry in RECORDS_HISTORY where RECORDS_ID is equal to the newly inserted ID in RECORDS?
I currently have a sequence on the ID in RECORDS to automatically increment when a new row is inserted, but I am unsure how to prepopulate a record in RECORDS_HISTORY that will look like this for each newly created (not updated) record.
INSERT INTO RECORDS_HISTORY (RECORDS_ID, LOG_DATE, LOG_TYPE, MESSAGE) VALUES (<records.id>, sysdate(), 'CREATED', 'Record created')
How can I create this associated _HISTORY record on creation?
You didn't mention the DB you are working with. I assume its Oracle. The most obvious answer is: Use a "On Insert Trigger". You even can get back the ID (sequence) from the insert statement into table RECORDS. Disadvantages of this solution: Triggers are kinda "hidden" code, can slow down processes on massive inserts and you consume like double diskspace on storing data partially redundant. What if RECORDS got updated or deleted? Can that happen and do you have to take care of that as well? The big question is: What is your goal?
There are proved historisation concepts around. Have a look at this: https://en.wikipedia.org/wiki/Slowly_changing_dimension

oracle and creating history

I am working on a system to track a project's history. There are 3 main tables: projects, tasks, and clients then 3 history tables for each. I have the following trigger on projects table.
CREATE OR REPLACE TRIGGER mySchema.trg_projectHistory
BEFORE UPDATE OR DELETE
ON mySchema.projects REFERENCING NEW AS New OLD AS Old
FOR EACH ROW
declare tmpVersion number;
BEGIN
select myPackage.GETPROJECTVERSION( :OLD.project_ID ) into tmpVersion from dual;
INSERT INTO mySchema.projectHistiry
( project_ID, ..., version )
VALUES
( :OLD.project_ID,
...
tmpVersion
);
EXCEPTION
WHEN OTHERS THEN
-- Consider logging the error and then re-raise
RAISE;
END ;
/
I got three triggers for each of my tables (projects, tasks, clients).
Here is the challenge: Not everything changes at the same time. For example, somebody could just update a certain tasks' cost. In this case, only one trigger fires and I got one insert. I'd like to insert one record into 3 history tables at once even if nothing changed in the projects and clients tables.
Also, what if somebody changes a project's end_date, the cost, and say the picks another client. Now, I have three triggers firing at the same time. Only in this case, I will have one record inserted into my three history tables. (which I want)
If i modify the triggers to do insert into 3 tables for the first example, then I will have 9 inserts when the second example happens.
Not quite sure how to tackle this. any help?
To me it sounds as if you want a transaction-level snapshot of the three tables created whenever you make a change to any of those tables.
Have a row level trigger on each of the three tables that calls a single packaged procedure with the project id and optionally client / task id.
The packaged procedure inserts into all three history tables the relevant project, client and tasks where there isn't already a history record for that key and transaction (ie you don't want duplicates). You got a couple of choices when it comes to the latter. You can use a unique constraint and either a BULK select and insert with FORALL/SAVE EXCEPTIONS, DML error logging (EXCEPTIONS INTO) or a INSERT...SELECT...WHERE NOT EXISTS...
You do need to keep track of your transactions. I'm guessing this is what you were doing with myPackage.GETPROJECTVERSION. The trick here is to only increment versions when you have a new transaction. If, when you get a new version number, you hold it in a pacakge level variable, you can easily tell whether your session has already got a version number or not.
If your session is going to run multiple transaction, you'll need to 'clear' out the session-level version number if it was part of a previous transaction. If you get DBMS_TRANSACTION.LOCAL_TRANSACTION_ID and store that at the package/session level as well, you can determine if you are in a new transaction, or part of the same transaction.
From your description, it looks like you would be capturing the effective and end date for each of the history rows once any of the original rows change.
Eg. Project_hist table would have eff_date and exp_date which has the start and end date for a given project. Project table would just have an effective date. (as it is the active project).
I don't see why you want to insert rows for all three history tables when only one of the table values is updated. You can pretty much get the details as you need (as of a given date) using your current logic. (inserting old row in the history table for the table that has been updated only.).
Alternative answer.
Have a look at Total Recall / Flashback Archive
You can set the retention to 10 years, and use a simple AS OF TIMESTAMP to get the data as of any particular timestamp.
Not sure on performance though. It may be easier to have a daily or weekly retention and then a separate scheduled job that picks out the older versions using the VERSIONS BETWEEN syntax and stores them in your history table.