Related
I have to solve this problem and it has been bugging me for hours and I can't seem to find a valid solution that satisfies the time complexity required.
For any edge e in any graph G, let G\e denote the graph obtained by deleting e from G.
(a)Suppose we are given an edge-weighted directed graph G in which the shortest path σ from vertex s to vertex t passes through every vertex of G. Describe an algorithm to compute the shortest-path distance from s to t in G\e, for every edge e of G, in O(VlogV) time. Your algorithm should output a set of E shortest-path distances,one for each edge of the input graph. You may assume that all edge weights are non-negative.[Hint: If we delete an edge of the original shortest path, how do the old and new shortest paths overlap?
(b) Describe an algorithm to solve the replacement paths problem for arbitrary undirected graphs in O(V log V ) time.
a) Consider the shortest path P between vertices s and t. Since P is a shortest path, there is no edge between any two vertices u and v in P in which the length of shortest path between u and v is bigger than 1 in the induced graph P. Since every vertex in G is present in P, So every edge of G is present in the induced graph of P. So we conclude that every edge in G is between two adjacent vertices in P (not the induced graph of P). The only thing you should check for each edge e which connects vertices u and v in G, is that there is another edge which connects u and v in G. If so, the shortest path doesn't change in G/e, otherwise s and t will lie on different components.
First of all I want to mention that the complexity can't only depend on V since the output should contain E values, therefore I guess it should be O(E + Vlog(V)).
I think the following idea should work for problem b) and thus for a) as well. Let σ be the shortest s-t path.
For every edge e in G/E(σ), the shortest path in G/e is still σ.
If we remove an edge e in σ, then the shortest path in the remaining graph would like this: it would start going along σ, then would continue outside (might be from the very first vertex s, then go back to σ (might be at the very last vertex t). Let's then iterate over all edges e=(u,v) that either go from G/σ to σ, or from one vertex of σ, that is closer to s, to another vertex of σ, that is closer to t, as edges of potential candidate paths for some shortest s-t path in G/e' for some e'. Suppose that w is the last vertex in the shortest s-u path U that belongs to σ. Then U+e+σ[v..t] is a potential candidate for a shortest s-t path in graphs G/e' for all e' in σ[w..v]. In order to efficiently store this candidate, we can use a Segment Tree data structure with min operation. This would give us O(E log(E)) total complexity for all updates after we consider all edges. It might be possible to make it O(Vlog(V)) if we look closer at the structure of the updates, but I am not sure at the moment, might be not. Precomputing vertices w for each shortest s-u path above can be done in a single Dijkstra run, if we already have σ.
So in the end the solution runs in O(Elog(E)) time. I am not sure how to make it O(E + Vlog(V)), it is possible to make Dijkstra to run in this time by using Fibonacci heap, but for the updates for candidates I don't really see a faster solution at the moment.
I have directed Graph G(V,E) with weight function w. so that weight of each (u,v) is a positive value. I need to find the most lightweight circle in the graph that vertex k' is part of it.
I've also given an algorithm i can use which can find the most lightweight path for a graph with positives weights ( i can use it only once).
I thought about creating a sub graph G' where all vertices and edges that are strongly connected components. find the graph which k' is part of it. then find for the most lightweight adjacent edge from k' to some v of vertices. from that v i can run the algorithm given and find the lightweight path then add the weight of the vertex missing ( (k',v) ).
is that seems correct ? I'm in the beginning of this course and I feel i'm not there yet.
It is a single-source shortest-path problem, where you exclude k->k self-loop as a solution, and find a longer path from k to k. The trick is always expand the shortest path thread.
Given this definition, you can start Googling...
I can't imagine why you called your source vertex k'. Anyway...
Add a new vetrex w that has the same outgoing edges as k'.
Then use Dijkstra's algorithm to find the shortest path from w to k'.
Substitute k' for w in the path, and you have the smallest cycle including k'.
Very interesting problem. I am assuming that there are no negative values in the graph, or otherwise the following solutions requires first normalizing the vertices such that the negative values become at least 0. First method (trivial) is to detect all cycles starting from the target vertex (k). Then compute the weight of all those cycles and take the minimum. The second method is to run Dijkstra algorithm (again watch out negative weights) from the target node (k). Then iterate over all incoming edges of (k), and select the source node that has the minimum Dijkstra value. Now the lightest cycle includes the single path (formed by Dijkstra traversal) from (k) to the chosen node + the bridge to come back to (k). I hope that helps :)
What is the exact difference between Dijkstra's and Prim's algorithms? I know Prim's will give a MST but the tree generated by Dijkstra will also be a MST. Then what is the exact difference?
Prim's algorithm constructs a minimum spanning tree for the graph, which is a tree that connects all nodes in the graph and has the least total cost among all trees that connect all the nodes. However, the length of a path between any two nodes in the MST might not be the shortest path between those two nodes in the original graph. MSTs are useful, for example, if you wanted to physically wire up the nodes in the graph to provide electricity to them at the least total cost. It doesn't matter that the path length between two nodes might not be optimal, since all you care about is the fact that they're connected.
Dijkstra's algorithm constructs a shortest path tree starting from some source node. A shortest path tree is a tree that connects all nodes in the graph back to the source node and has the property that the length of any path from the source node to any other node in the graph is minimized. This is useful, for example, if you wanted to build a road network that made it as efficient as possible for everyone to get to some major important landmark. However, the shortest path tree is not guaranteed to be a minimum spanning tree, and the sum of the costs on the edges of a shortest-path tree can be much larger than the cost of an MST.
Another important difference concerns what types of graphs the algorithms work on. Prim's algorithm works on undirected graphs only, since the concept of an MST assumes that graphs are inherently undirected. (There is something called a "minimum spanning arborescence" for directed graphs, but algorithms to find them are much more complicated). Dijkstra's algorithm will work fine on directed graphs, since shortest path trees can indeed be directed. Additionally, Dijkstra's algorithm does not necessarily yield the correct solution in graphs containing negative edge weights, while Prim's algorithm can handle this.
Dijkstra's algorithm doesn't create a MST, it finds the shortest path.
Consider this graph
5 5
s *-----*-----* t
\ /
-------
9
The shortest path is 9, while the MST is a different 'path' at 10.
Prim and Dijkstra algorithms are almost the same, except for the "relax function".
Prim:
MST-PRIM (G, w, r) {
for each key ∈ G.V
u.key = ∞
u.parent = NIL
r.key = 0
Q = G.V
while (Q ≠ ø)
u = Extract-Min(Q)
for each v ∈ G.Adj[u]
if (v ∈ Q)
alt = w(u,v) <== relax function, Pay attention here
if alt < v.key
v.parent = u
v.key = alt
}
Dijkstra:
Dijkstra (G, w, r) {
for each key ∈ G.V
u.key = ∞
u.parent = NIL
r.key = 0
Q = G.V
while (Q ≠ ø)
u = Extract-Min(Q)
for each v ∈ G.Adj[u]
if (v ∈ Q)
alt = w(u,v) + u.key <== relax function, Pay attention here
if alt < v.key
v.parent = u
v.key = alt
}
The only difference is pointed out by the arrow, which is the relax function.
The Prim, which searches for the minimum spanning tree, only cares about the minimum of the total edges cover all the vertices. The relax function is alt = w(u,v)
The Dijkstra, which searches for the minimum path length, so it cares about the edge accumulation. The relax function is alt = w(u,v) + u.key
Dijsktra's algorithm finds the minimum distance from node i to all nodes (you specify i). So in return you get the minimum distance tree from node i.
Prims algorithm gets you the minimum spaning tree for a given graph. A tree that connects all nodes while the sum of all costs is the minimum possible.
So with Dijkstra you can go from the selected node to any other with the minimum cost, you don't get this with Prim's
The only difference I see is that Prim's algorithm stores a minimum cost edge whereas Dijkstra's algorithm stores the total cost from a source vertex to the current vertex.
Dijkstra gives you a way from the source node to the destination node such that the cost is minimum. However Prim's algorithm gives you a minimum spanning tree such that all nodes are connected and the total cost is minimum.
In simple words:
So, if you want to deploy a train to connecte several cities, you would use Prim's algo. But if you want to go from one city to other saving as much time as possible, you'd use Dijkstra's algo.
Both can be implemented using exactly same generic algorithm as follows:
Inputs:
G: Graph
s: Starting vertex (any for Prim, source for Dijkstra)
f: a function that takes vertices u and v, returns a number
Generic(G, s, f)
Q = Enqueue all V with key = infinity, parent = null
s.key = 0
While Q is not empty
u = dequeue Q
For each v in adj(u)
if v is in Q and v.key > f(u,v)
v.key = f(u,v)
v.parent = u
For Prim, pass f = w(u, v) and for Dijkstra pass f = u.key + w(u, v).
Another interesting thing is that above Generic can also implement Breadth First Search (BFS) although it would be overkill because expensive priority queue is not really required. To turn above Generic algorithm in to BFS, pass f = u.key + 1 which is same as enforcing all weights to 1 (i.e. BFS gives minimum number of edges required to traverse from point A to B).
Intuition
Here's one good way to think about above generic algorithm: We start with two buckets A and B. Initially, put all your vertices in B so the bucket A is empty. Then we move one vertex from B to A. Now look at all the edges from vertices in A that crosses over to the vertices in B. We chose the one edge using some criteria from these cross-over edges and move corresponding vertex from B to A. Repeat this process until B is empty.
A brute force way to implement this idea would be to maintain a priority queue of the edges for the vertices in A that crosses over to B. Obviously that would be troublesome if graph was not sparse. So question would be can we instead maintain priority queue of vertices? This in fact we can as our decision finally is which vertex to pick from B.
Historical Context
It's interesting that the generic version of the technique behind both algorithms is conceptually as old as 1930 even when electronic computers weren't around.
The story starts with Otakar Borůvka who needed an algorithm for a family friend trying to figure out how to connect cities in the country of Moravia (now part of the Czech Republic) with minimal cost electric lines. He published his algorithm in 1926 in a mathematics related journal, as Computer Science didn't existed then. This came to the attention to Vojtěch Jarník who thought of an improvement on Borůvka's algorithm and published it in 1930. He in fact discovered the same algorithm that we now know as Prim's algorithm who re-discovered it in 1957.
Independent of all these, in 1956 Dijkstra needed to write a program to demonstrate the capabilities of a new computer his institute had developed. He thought it would be cool to have computer find connections to travel between two cities of the Netherlands. He designed the algorithm in 20 minutes. He created a graph of 64 cities with some simplifications (because his computer was 6-bit) and wrote code for this 1956 computer. However he didn't published his algorithm because primarily there were no computer science journals and he thought this may not be very important. The next year he learned about the problem of connecting terminals of new computers such that the length of wires was minimized. He thought about this problem and re-discovered Jarník/Prim's algorithm which again uses the same technique as the shortest path algorithm he had discovered a year before. He mentioned that both of his algorithms were designed without using pen or paper. In 1959 he published both algorithms in a paper that is just 2 and a half page long.
Dijkstra finds the shortest path between it's beginning node
and every other node. So in return you get the minimum distance tree from beginning node i.e. you can reach every other node as efficiently as possible.
Prims algorithm gets you the MST for a given graph i.e. a tree that connects all nodes while the sum of all costs is the minimum possible.
To make a story short with a realistic example:
Dijkstra wants to know the shortest path to each destination point by saving traveling time and fuel.
Prim wants to know how to efficiently deploy a train rail system i.e. saving material costs.
Directly from Dijkstra's Algorithm's wikipedia article:
The process that underlies Dijkstra's algorithm is similar to the greedy process used in Prim's algorithm. Prim's purpose is to find a minimum spanning tree that connects all nodes in the graph; Dijkstra is concerned with only two nodes. Prim's does not evaluate the total weight of the path from the starting node, only the individual path.
Here's what clicked for me: think about which vertex the algorithm takes next:
Prim's algorithm takes next the vertex that's closest to the tree, i.e. closest to some vertex anywhere on the tree.
Dijkstra's algorithm takes next the vertex that is closest to the source.
Source: R. Sedgewick's lecture on Dijkstra's algorithm, Algorithms, Part II: https://coursera.org/share/a551af98e24292b6445c82a2a5f16b18
I was bothered with the same question lately, and I think I might share my understanding...
I think the key difference between these two algorithms (Dijkstra and Prim) roots in the problem they are designed to solve, namely, shortest path between two nodes and minimal spanning tree (MST). The formal is to find the shortest path between say, node s and t, and a rational requirement is to visit each edge of the graph at most once. However, it does NOT require us to visit all the node. The latter (MST) is to get us visit ALL the node (at most once), and with the same rational requirement of visiting each edge at most once too.
That being said, Dijkstra allows us to "take shortcut" so long I can get from s to t, without worrying the consequence - once I get to t, I am done! Although there is also a path from s to t in the MST, but this s-t path is created with considerations of all the rest nodes, therefore, this path can be longer than the s-t path found by the Dijstra's algorithm. Below is a quick example with 3 nodes:
2 2
(s) o ----- o ----- o (t)
| |
-----------------
3
Let's say each of the top edges has the cost of 2, and the bottom edge has cost of 3, then Dijktra will tell us to the take the bottom path, since we don't care about the middle node. On the other hand, Prim will return us a MST with the top 2 edges, discarding the bottom edge.
Such difference is also reflected from the subtle difference in the implementations: in Dijkstra's algorithm, one needs to have a book keeping step (for every node) to update the shortest path from s, after absorbing a new node, whereas in Prim's algorithm, there is no such need.
The simplest explanation is in Prims you don't specify the Starting Node, but in dijsktra you (Need to have a starting node) have to find shortest path from the given node to all other nodes.
The key difference between the basic algorithms lies in their different edge-selection criteria. Generally, they both use a priority queue for selecting next nodes, but have different criteria to select the adjacent nodes of current processing nodes: Prim's Algorithm requires the next adjacent nodes must be also kept in the queue, while Dijkstra's Algorithm does not:
def dijkstra(g, s):
q <- make_priority_queue(VERTEX.distance)
for each vertex v in g.vertex:
v.distance <- infinite
v.predecessor ~> nil
q.add(v)
s.distance <- 0
while not q.is_empty:
u <- q.extract_min()
for each adjacent vertex v of u:
...
def prim(g, s):
q <- make_priority_queue(VERTEX.distance)
for each vertex v in g.vertex:
v.distance <- infinite
v.predecessor ~> nil
q.add(v)
s.distance <- 0
while not q.is_empty:
u <- q.extract_min()
for each adjacent vertex v of u:
if v in q and weight(u, v) < v.distance:// <-------selection--------
...
The calculations of vertex.distance are the second different point.
Dijkstras algorithm is used only to find shortest path.
In Minimum Spanning tree(Prim's or Kruskal's algorithm) you get minimum egdes with minimum edge value.
For example:- Consider a situation where you wan't to create a huge network for which u will be requiring a large number of wires so these counting of wire can be done using Minimum Spanning Tree(Prim's or Kruskal's algorithm) (i.e it will give you minimum number of wires to create huge wired network connection with minimum cost).
Whereas "Dijkstras algorithm" will be used to get the shortest path between two nodes while connecting any nodes with each other.
Dijkstra's algorithm is a single source shortest path problem between node i and j, but Prim's algorithm a minimal spanning tree problem. These algorithm use programming concept named 'greedy algorithm'
If you check these notion, please visit
Greedy algorithm lecture note : http://jeffe.cs.illinois.edu/teaching/algorithms/notes/07-greedy.pdf
Minimum spanning tree : http://jeffe.cs.illinois.edu/teaching/algorithms/notes/20-mst.pdf
Single source shortest path : http://jeffe.cs.illinois.edu/teaching/algorithms/notes/21-sssp.pdf
#templatetypedef has covered difference between MST and shortest path. I've covered the algorithm difference in another So answer by demonstrating that both can be implemented using same generic algorithm that takes one more parameter as input: function f(u,v). The difference between Prim and Dijkstra's algorithm is simply which f(u,v) you use.
At the code level, the other difference is the API.
You initialize Prim with a source vertex, s, i.e., Prim.new(s); s can be any vertex, and regardless of s, the end result, which are the edges of the minimum spanning tree (MST) are the same. To get the MST edges, we call the method edges().
You initialize Dijkstra with a source vertex, s, i.e., Dijkstra.new(s) that you want to get shortest path/distance to all other vertices. The end results, which are the shortest path/distance from s to all other vertices; are different depending on the s. To get the shortest paths/distances from s to any vertex, v, we call the methods distanceTo(v) and pathTo(v) respectively.
They both create trees with the greedy method.
With Prim's algorithm we find minimum cost spanning tree. The goal is to find minimum cost to cover all nodes.
with Dijkstra we find Single Source Shortest Path. The goal is find the shortest path from the source to every other node
Prim’s algorithm works exactly as Dijkstra’s, except
It does not keep track of the distance from the source.
Storing the edge that connected the front of the visited vertices to the next closest vertex.
The vertex used as “source” for Prim’s algorithm is
going to be the root of the MST.
What is the exact difference between Dijkstra's and Prim's algorithms? I know Prim's will give a MST but the tree generated by Dijkstra will also be a MST. Then what is the exact difference?
Prim's algorithm constructs a minimum spanning tree for the graph, which is a tree that connects all nodes in the graph and has the least total cost among all trees that connect all the nodes. However, the length of a path between any two nodes in the MST might not be the shortest path between those two nodes in the original graph. MSTs are useful, for example, if you wanted to physically wire up the nodes in the graph to provide electricity to them at the least total cost. It doesn't matter that the path length between two nodes might not be optimal, since all you care about is the fact that they're connected.
Dijkstra's algorithm constructs a shortest path tree starting from some source node. A shortest path tree is a tree that connects all nodes in the graph back to the source node and has the property that the length of any path from the source node to any other node in the graph is minimized. This is useful, for example, if you wanted to build a road network that made it as efficient as possible for everyone to get to some major important landmark. However, the shortest path tree is not guaranteed to be a minimum spanning tree, and the sum of the costs on the edges of a shortest-path tree can be much larger than the cost of an MST.
Another important difference concerns what types of graphs the algorithms work on. Prim's algorithm works on undirected graphs only, since the concept of an MST assumes that graphs are inherently undirected. (There is something called a "minimum spanning arborescence" for directed graphs, but algorithms to find them are much more complicated). Dijkstra's algorithm will work fine on directed graphs, since shortest path trees can indeed be directed. Additionally, Dijkstra's algorithm does not necessarily yield the correct solution in graphs containing negative edge weights, while Prim's algorithm can handle this.
Dijkstra's algorithm doesn't create a MST, it finds the shortest path.
Consider this graph
5 5
s *-----*-----* t
\ /
-------
9
The shortest path is 9, while the MST is a different 'path' at 10.
Prim and Dijkstra algorithms are almost the same, except for the "relax function".
Prim:
MST-PRIM (G, w, r) {
for each key ∈ G.V
u.key = ∞
u.parent = NIL
r.key = 0
Q = G.V
while (Q ≠ ø)
u = Extract-Min(Q)
for each v ∈ G.Adj[u]
if (v ∈ Q)
alt = w(u,v) <== relax function, Pay attention here
if alt < v.key
v.parent = u
v.key = alt
}
Dijkstra:
Dijkstra (G, w, r) {
for each key ∈ G.V
u.key = ∞
u.parent = NIL
r.key = 0
Q = G.V
while (Q ≠ ø)
u = Extract-Min(Q)
for each v ∈ G.Adj[u]
if (v ∈ Q)
alt = w(u,v) + u.key <== relax function, Pay attention here
if alt < v.key
v.parent = u
v.key = alt
}
The only difference is pointed out by the arrow, which is the relax function.
The Prim, which searches for the minimum spanning tree, only cares about the minimum of the total edges cover all the vertices. The relax function is alt = w(u,v)
The Dijkstra, which searches for the minimum path length, so it cares about the edge accumulation. The relax function is alt = w(u,v) + u.key
Dijsktra's algorithm finds the minimum distance from node i to all nodes (you specify i). So in return you get the minimum distance tree from node i.
Prims algorithm gets you the minimum spaning tree for a given graph. A tree that connects all nodes while the sum of all costs is the minimum possible.
So with Dijkstra you can go from the selected node to any other with the minimum cost, you don't get this with Prim's
The only difference I see is that Prim's algorithm stores a minimum cost edge whereas Dijkstra's algorithm stores the total cost from a source vertex to the current vertex.
Dijkstra gives you a way from the source node to the destination node such that the cost is minimum. However Prim's algorithm gives you a minimum spanning tree such that all nodes are connected and the total cost is minimum.
In simple words:
So, if you want to deploy a train to connecte several cities, you would use Prim's algo. But if you want to go from one city to other saving as much time as possible, you'd use Dijkstra's algo.
Both can be implemented using exactly same generic algorithm as follows:
Inputs:
G: Graph
s: Starting vertex (any for Prim, source for Dijkstra)
f: a function that takes vertices u and v, returns a number
Generic(G, s, f)
Q = Enqueue all V with key = infinity, parent = null
s.key = 0
While Q is not empty
u = dequeue Q
For each v in adj(u)
if v is in Q and v.key > f(u,v)
v.key = f(u,v)
v.parent = u
For Prim, pass f = w(u, v) and for Dijkstra pass f = u.key + w(u, v).
Another interesting thing is that above Generic can also implement Breadth First Search (BFS) although it would be overkill because expensive priority queue is not really required. To turn above Generic algorithm in to BFS, pass f = u.key + 1 which is same as enforcing all weights to 1 (i.e. BFS gives minimum number of edges required to traverse from point A to B).
Intuition
Here's one good way to think about above generic algorithm: We start with two buckets A and B. Initially, put all your vertices in B so the bucket A is empty. Then we move one vertex from B to A. Now look at all the edges from vertices in A that crosses over to the vertices in B. We chose the one edge using some criteria from these cross-over edges and move corresponding vertex from B to A. Repeat this process until B is empty.
A brute force way to implement this idea would be to maintain a priority queue of the edges for the vertices in A that crosses over to B. Obviously that would be troublesome if graph was not sparse. So question would be can we instead maintain priority queue of vertices? This in fact we can as our decision finally is which vertex to pick from B.
Historical Context
It's interesting that the generic version of the technique behind both algorithms is conceptually as old as 1930 even when electronic computers weren't around.
The story starts with Otakar Borůvka who needed an algorithm for a family friend trying to figure out how to connect cities in the country of Moravia (now part of the Czech Republic) with minimal cost electric lines. He published his algorithm in 1926 in a mathematics related journal, as Computer Science didn't existed then. This came to the attention to Vojtěch Jarník who thought of an improvement on Borůvka's algorithm and published it in 1930. He in fact discovered the same algorithm that we now know as Prim's algorithm who re-discovered it in 1957.
Independent of all these, in 1956 Dijkstra needed to write a program to demonstrate the capabilities of a new computer his institute had developed. He thought it would be cool to have computer find connections to travel between two cities of the Netherlands. He designed the algorithm in 20 minutes. He created a graph of 64 cities with some simplifications (because his computer was 6-bit) and wrote code for this 1956 computer. However he didn't published his algorithm because primarily there were no computer science journals and he thought this may not be very important. The next year he learned about the problem of connecting terminals of new computers such that the length of wires was minimized. He thought about this problem and re-discovered Jarník/Prim's algorithm which again uses the same technique as the shortest path algorithm he had discovered a year before. He mentioned that both of his algorithms were designed without using pen or paper. In 1959 he published both algorithms in a paper that is just 2 and a half page long.
Dijkstra finds the shortest path between it's beginning node
and every other node. So in return you get the minimum distance tree from beginning node i.e. you can reach every other node as efficiently as possible.
Prims algorithm gets you the MST for a given graph i.e. a tree that connects all nodes while the sum of all costs is the minimum possible.
To make a story short with a realistic example:
Dijkstra wants to know the shortest path to each destination point by saving traveling time and fuel.
Prim wants to know how to efficiently deploy a train rail system i.e. saving material costs.
Directly from Dijkstra's Algorithm's wikipedia article:
The process that underlies Dijkstra's algorithm is similar to the greedy process used in Prim's algorithm. Prim's purpose is to find a minimum spanning tree that connects all nodes in the graph; Dijkstra is concerned with only two nodes. Prim's does not evaluate the total weight of the path from the starting node, only the individual path.
Here's what clicked for me: think about which vertex the algorithm takes next:
Prim's algorithm takes next the vertex that's closest to the tree, i.e. closest to some vertex anywhere on the tree.
Dijkstra's algorithm takes next the vertex that is closest to the source.
Source: R. Sedgewick's lecture on Dijkstra's algorithm, Algorithms, Part II: https://coursera.org/share/a551af98e24292b6445c82a2a5f16b18
I was bothered with the same question lately, and I think I might share my understanding...
I think the key difference between these two algorithms (Dijkstra and Prim) roots in the problem they are designed to solve, namely, shortest path between two nodes and minimal spanning tree (MST). The formal is to find the shortest path between say, node s and t, and a rational requirement is to visit each edge of the graph at most once. However, it does NOT require us to visit all the node. The latter (MST) is to get us visit ALL the node (at most once), and with the same rational requirement of visiting each edge at most once too.
That being said, Dijkstra allows us to "take shortcut" so long I can get from s to t, without worrying the consequence - once I get to t, I am done! Although there is also a path from s to t in the MST, but this s-t path is created with considerations of all the rest nodes, therefore, this path can be longer than the s-t path found by the Dijstra's algorithm. Below is a quick example with 3 nodes:
2 2
(s) o ----- o ----- o (t)
| |
-----------------
3
Let's say each of the top edges has the cost of 2, and the bottom edge has cost of 3, then Dijktra will tell us to the take the bottom path, since we don't care about the middle node. On the other hand, Prim will return us a MST with the top 2 edges, discarding the bottom edge.
Such difference is also reflected from the subtle difference in the implementations: in Dijkstra's algorithm, one needs to have a book keeping step (for every node) to update the shortest path from s, after absorbing a new node, whereas in Prim's algorithm, there is no such need.
The simplest explanation is in Prims you don't specify the Starting Node, but in dijsktra you (Need to have a starting node) have to find shortest path from the given node to all other nodes.
The key difference between the basic algorithms lies in their different edge-selection criteria. Generally, they both use a priority queue for selecting next nodes, but have different criteria to select the adjacent nodes of current processing nodes: Prim's Algorithm requires the next adjacent nodes must be also kept in the queue, while Dijkstra's Algorithm does not:
def dijkstra(g, s):
q <- make_priority_queue(VERTEX.distance)
for each vertex v in g.vertex:
v.distance <- infinite
v.predecessor ~> nil
q.add(v)
s.distance <- 0
while not q.is_empty:
u <- q.extract_min()
for each adjacent vertex v of u:
...
def prim(g, s):
q <- make_priority_queue(VERTEX.distance)
for each vertex v in g.vertex:
v.distance <- infinite
v.predecessor ~> nil
q.add(v)
s.distance <- 0
while not q.is_empty:
u <- q.extract_min()
for each adjacent vertex v of u:
if v in q and weight(u, v) < v.distance:// <-------selection--------
...
The calculations of vertex.distance are the second different point.
Dijkstras algorithm is used only to find shortest path.
In Minimum Spanning tree(Prim's or Kruskal's algorithm) you get minimum egdes with minimum edge value.
For example:- Consider a situation where you wan't to create a huge network for which u will be requiring a large number of wires so these counting of wire can be done using Minimum Spanning Tree(Prim's or Kruskal's algorithm) (i.e it will give you minimum number of wires to create huge wired network connection with minimum cost).
Whereas "Dijkstras algorithm" will be used to get the shortest path between two nodes while connecting any nodes with each other.
Dijkstra's algorithm is a single source shortest path problem between node i and j, but Prim's algorithm a minimal spanning tree problem. These algorithm use programming concept named 'greedy algorithm'
If you check these notion, please visit
Greedy algorithm lecture note : http://jeffe.cs.illinois.edu/teaching/algorithms/notes/07-greedy.pdf
Minimum spanning tree : http://jeffe.cs.illinois.edu/teaching/algorithms/notes/20-mst.pdf
Single source shortest path : http://jeffe.cs.illinois.edu/teaching/algorithms/notes/21-sssp.pdf
#templatetypedef has covered difference between MST and shortest path. I've covered the algorithm difference in another So answer by demonstrating that both can be implemented using same generic algorithm that takes one more parameter as input: function f(u,v). The difference between Prim and Dijkstra's algorithm is simply which f(u,v) you use.
At the code level, the other difference is the API.
You initialize Prim with a source vertex, s, i.e., Prim.new(s); s can be any vertex, and regardless of s, the end result, which are the edges of the minimum spanning tree (MST) are the same. To get the MST edges, we call the method edges().
You initialize Dijkstra with a source vertex, s, i.e., Dijkstra.new(s) that you want to get shortest path/distance to all other vertices. The end results, which are the shortest path/distance from s to all other vertices; are different depending on the s. To get the shortest paths/distances from s to any vertex, v, we call the methods distanceTo(v) and pathTo(v) respectively.
They both create trees with the greedy method.
With Prim's algorithm we find minimum cost spanning tree. The goal is to find minimum cost to cover all nodes.
with Dijkstra we find Single Source Shortest Path. The goal is find the shortest path from the source to every other node
Prim’s algorithm works exactly as Dijkstra’s, except
It does not keep track of the distance from the source.
Storing the edge that connected the front of the visited vertices to the next closest vertex.
The vertex used as “source” for Prim’s algorithm is
going to be the root of the MST.
I'm currently working on an implementation of the D*Lite algorithm from Sven Koenig.
http://idm-lab.org/bib/abstracts/papers/aaai02b.pdf. Basically I'm trying to understand all the details before starting to implement it. It seems that the algorithm works on directed graphs, that's the way to define the Pred and Succ functions.
How do I define the direction of the graphs and which the parameters decide the direction of the graphs. Should I use the value of some parameter like the g cost (which doesn't seem to be a good choice...since is the g cost along with the rhs value the one the algorithm updates) or the heuristic estimate of the distance?
D*, and D*-lite will both work on both directed and undirected graphs.
A graph is G = (V, E), where V is a list of configurations (or states) that can be reached. E is a list of the connections between vertices. In a directed graph, E is a set of edges which are ordered pairs (u, v), where both u and v are vertices. In an undirected graph, E is a set of unordered pairs.
Planning on an undirected graph is equivalent to planning on a directed graph, with a bidirectional edge. That is, if (u,v) is an edge (v, u) will also be an edge.
How you construct the graphs is application specific, and varies from simple grids to much more complex strategies like lattice approximations to forward kinematics.