when I am not selected start date and end date then it shows me NaN-aN-aN. I need to show null in request parameter. I use ajax for request and use flagpicker package for calendar
Related
I am new to the environment and need help writing a validation statement in APEX.
I have a Start Date and End Date field on a page with a Date Picker Type.
The End Date validation has already been set ( end date must be equal to or greater than start date )
Now I need to implement this validation for start date:
User should be able to choose either the current date (today) or a future date.
Is there a way to disable previous days on Apex? Or would I need to write a validation statement? If so, what validation statement could I use?
Check out the settings for the date picker, specifically the minimum date.
Use the help to work out exactly what you need. APEX will then handle the validations for you.
I'm trying to populate my Vue.js Template to update a model
<input type="datetime-local" name="start_time" v-model="start_time">
Having issues pre filling the date-time field
start_time: "2020-02-12 22:00:00"
this is the data that i receive from api and i'm directly assigning it to my start_time variable
Just adding to the answer
use format
'YYYY-MM-DDTHH:mm'
otherwise there will be an issue with AM and PM
According to the MDN web docs for datetime-local the format should be yyyy-mm-ddThh:mm. Therefore you'll need to update the value of your data property to be:
2020-02-12T22:00
Since you've using moment you can format the initial date with:
moment(dateString).format('YYYY-MM-DDThh:mm')
Replace dateString with the actual date string or property that contains the date string.
I have created email workflow which will trigger biweekly. I have to show To Date-From Date in the email body based on the record Created On field. I am not using any custom code, as I am new to dynamics and don't have developer background. For To date, I can use record Created On field but how to calculate End Date based on Created On.
If End Date is always a set amount of time after the Start Date, you can specify this in an update step of the workflow. For example, you can set it to 14 days after the Start Date:
You can also use the date when the workflow runs:
I am using Microsoft Dynamics 365 Web API approach to interacting with CRM data.
Here I want to update the field with type: DATE and TIME.
Date value I am passing in the request body is as below:
"packfirstday":"1-15-2018"
Except for above, I have also tried with DateTime and with different date formats.
e.g.
mm-dd-yyyy
m-dd-yyyy
mm/dd/yyyy
yyyy/mm/dd
yyyy-mm-dd
PS: I try to post without date field it is saving details successfully.
The problem is not with the code, the simple misunderstanding.
There are 2 components namely Behavior & Format. You have Format set as 'Date only' not the Behavior. Behavior decides the Database terms whereas Format is used for displaying datepicker controls in Form.
So when you set the field in web api with only date part - the CRM database expects time part also.
Either set behavior also as date only, so this will work:
"packfirstday":"2018-01-15" //YYYY-mm-dd format
Or change your code to pass time part also:
"packfirstday":"2018-01-15T11:10:00.000Z" //UTC offset
Since user local behavior still expects the time part.
In my code, I insert from one date field to another date field, then update my entity with the new data and debugging my code. I get this exception:
A validation error occurred. The value of on record of type is outside the valid range.
When I change the same field in CRM UI I get no error. Where should I look for? What is the problem?
Normally this error will look like:
A validation error occurred. The value of 'field_name' on record of type 'entity_name' is outside the valid range.
You have to make sure, if the field is optionset - then the value (ex.10000000) passed in code is within the available range of options in optionset customization (ex: 10000000, 10000001, 10000002)
You said date field, verify if the date fields between the entities are of same type (like date only, date time, timezone specific, etc). Also the retrieval from CRM using SDK will give you UTC whereas the date value assignments in code while create/update will be parsed to UTC.. check that too for possible date range like 31st November 2017.