While project managers may each have their own personality and management style, it seems that many of them have a pernicious love of sneaking in "scope creep" when they can (whether anyone is watching or not). While they usually mean well (bless their hearts), what's the best way that you've found to say "NO" to project managers?
Let me start by saying that if a PM is "sneaking in scope creep" he is a very bad project manager.
Having said that...it's not your job to say no to a project manager. It's your job to ensure that he knows and understands the costs and risks of the change he is making. If the PM insists on changing the scope and adjusting nothing else in the project, get another job (because the project and/or company is doomed).
A good rule of thumb is to always answer, "Okay. What should we drop to get this in by the deadline?" and/or "Okay. If we move the deadline to X, we can add that in."
Every change affects completion time. There's no such thing as a zero-time task. Forcing a project manager to realize that quality, deadline, or feature list will suffer every time they make a change will go a long way towards getting them to think right about scope creep.
By having good costing and feature design for what is in scope, taking it back to them and asking if they want to move the date out, or cut other features. If the latter, what features are no longer important that haven't been started yet?
The easiest way to do it is be firm and tell them that it will affect the release date if you include the additional feature(s). Ultimately their job is to ship a product on time, so the bottom line for them is "can we fit this in without breaking the schedule". If the answer is no, then any project manager worth their salary should fall firmly on the side of development in agreeing it's unacceptable scope creep.
Be honest
Explain that there is a tight dependency between ship date, quality and features. Tell them that if they want to meet the ship date the quality will suffer if the new feature is added.
Chances are, while you suppose that your project manager has a 'pernicious love of sneaking in "scope creep" when they can', his perspective is probably different. It is probably more productive to make sure you understand his point of view.
This is of course in addition to communicating your own point of view, namely the consequences of the scope creep. You probably need to explicitly identify the additional work in your development plan, estimate how long the additional work will take, and explain that this means a delay or dropping some other feature.
This only works if your estimates are any good. This does not work if you do the additional work off the books, so that the additional time spent is not visible. Otherwise, you might meet the deadline for other reasons, such as harder work or efficiency gains, and your project manager will just remember that scope creep did not affect the delivery date 'last time'.
By pursuading him to understand how you are trying to help him save his job (i.e. you are telling him the truth.) He's got more at stake than you, I imagine.
If you want to succeed in your organization, you will want to be a team player and should strive to demonstrate your commitment. Sometimes, this means putting in some extra time to get a great new suggestion into the product.
However, you are more likely to command respect by placing firm limits on what can reasonably be expected of you. One way to do this is by helping managers to understand that they are not going to improve a product by engaging in scope-creep but that they are more likely to hurt the product in the long run.
Are the bits that get crept into the project being asked for by the client? Are they valuable items to deliver?
There is certainly an issue with the PM if they are sneaking things into the scope and not making them visible. This is a serious concern and something I would raise with them directly and openly.
However, scope creep (in my book) is perfectly acceptable if it continues to meet the requirements of the business. Sure, you have deadlines, but what's wrong with being flexible on what you deliver on that deadline? This is where visibility is critical.
Something that has worked well for me in the past:
I am taking it that if your project manager wants to sneak in features they do not have an accurate project plan. Keep your own task list with an estimate of how long each task will take, ordered by priority - it doesn't need to be elaborate just a text document or spreadsheet. If your project manager wants you to add a new feature, send a copy of your list and ask where you should insert it in the priority order.
If the project manager tries to negotiate down your time estimates then just say "I will do my best, but I can't guarantee anything."
Related
Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 3 years ago.
Improve this question
I currently work in a small business (15-20 employees, 5 programmers) where most projects are custom built CMS and a few web applications products.
Since I started working there, I have worked on many projects, but specifications for each project vary a lot. Sometimes we get a little detail, a Word document telling what the client wants, and what we are suggesting (suggested form fields, a short description of display, etc.). Sometimes almost nothing except "do what you think is the best approach for this project/module/request".
My question to you guys, who might work in different kind of businesses, is: How (huge pile of paper? Word docs? Visios?) and what kind of information do you get from your superiors, managers, teamates when starting a project (plenty of analysis, drawings, etc.)? How much detail do you get on this?
Hope my question is clear enough, thank you.
Specs..that's kind of funny...how about never :(.
Seriously a lot of companies assume specs aren't needed, its absolutely unacceptable but this is how it is in a LOT of companies. They assume a one liner and the programmer knows what the program should do, the inputs / outputs and so on.
Unfortunately in my case I have to actually help write the specs..and Im the programmer :(.
I mostly get a lot of verbal direction and I use a voice recorder to record the conversation and transcribe it when I am done. I write my own specs from my customers' words.
Then, as a good consultant should, I take the writeup back to the customer and verify it, and get a signature and build it, and they live happily every after! (no they dont, they change their mind a 100 times)
It can vary depending on what group the work falls under:
Support request - If the change will take a short period of time and is fixing something broken, there is this group. This could be as simple as, "Add Bob to the list of authorized users for that ancient form" where the form is something written years ago and aside from adding and removing users, it isn't touched for fear of breaking things.
Service Advisory Committee request - Items that are up to a few days are in this group as these are kind of like mini-projects as the request may be to create a new form or portal for a group. This could be upgrading some 3rd party software where we have some customizations that make the upgrade not necessarily a simple thing for Operations to do.
Project - In this case there are usually a few Word documents and/or e-mail threads that help nail down requirements in terms of scope, budget, and time. These can take months though there is something to be said for having a prototype to change rather than creating the initial prototype to tell if requirements are really met or not. Course my current project is over a year old, still has a few more months to the timeline and already has a successor coming after it is done,i.e. there is a Phase II to go after Phase I.
Uber project - These merit their own group of documentation and are the million dollar, multiple company projects that usually try to document everything up front rarely works out well here. Thus, there is some adoptioon of agile for these but there are still some growing pains to go through as how we use agile matures. Think installing a dozen modules of some off-the-shelf software that requires both internal and external developers to customize the suite for our specific needs as the software is supposed to be very robust, flexible and help save lots of time and money on how people otherwise do their jobs generally. Think ERP or CRM for a couple of examples here.
We are a 16-person company that creates and supports customized software for small retail shop owners.
The projects we get fall into three general categories (as related to specs):
"Here, automate this form." A sales person explains that our customer only wants this form to appear where they can fill it out and print it to make it look professional to their customer. Our specs is a single piece of paper that looks something like an order form or report. This is always false; they want pop-up lookups, automatic updating from other sources, and "while you're at it" add-ons that more than double the time. These, we've learned to just live in the moment and let the project take its course. By the time we're done, the program doesn't look anything like their original form.
Small changes. Like a simple e-mail explaining that the background color is stale, or a request to sort a report by a different column. These, we just do as time allows.
Big company integrations, where we're tasked with making our software work with some big outfit like Intuit (QuickBook) or FedEx (shipping rates). These often have well thought out documentation and sample code. We get 100's of pages in word documents or pdfs. The problem with these is when their specs are wrong. We find out about inaccuracies when we try to test or certify our integration. In these instances, we usually take longer in certification than we did to originally develop the processes.
In all cases, the real trouble is when a sales person promises a solution to the customer before even asking a programmer what it would take. As recently as 2 weeks ago, a sales person got into real trouble and had to issue a refund (that person is no longer with the company).
None - at least not from management.
Instead, as a developer (and particularly one leading a software project right now), I'm expected to contact my users/customers/etc and work directly with them to come up with our specifications and requirements. The documentation I do request from my team is only what will be useful to the team. I am lucky in that management rarely requests a document that doesn't make sense or won't provide some use to our project.
I currently have a half-dozen or so specs each 60-80 pages. One of them is 80 pages with no table of contents. Good times.
Our Product Managers and senior engineers prepare three planning docs for our data management software projects.
High-level requirements: 1-to-3 sentence descriptions of hardware/software supported or specific feature for this project. (10-15 pages of Excel-like grids)
Technical details: Engineering implementation of each high-level requirements. Up to a page for each, depending on amount of detail. (30-40 pages of filled-in feature details)
Business agreement: Summary of 1 & 2 with engineering schedule and Product Mgmt's market analysis. Everyone signs off on this. (5 pages analysis, 20 technical)
I haven't seen work flows or other Visio-like details in our specs. The prioritized requirements and schedule prove critical, so we understand when to lop things off to save development and testing time.
Closed. This question does not meet Stack Overflow guidelines. It is not currently accepting answers.
This question does not appear to be about programming within the scope defined in the help center.
Closed 5 years ago.
Improve this question
I am attempting to manage my projects a little better so I am looking at attempting to apply some of (eventually all) the features of scrum.
Looking at user stories specifically the high level format seems to be:
As a User I can Feature Description
or
Artifact is Doing Something
How would I write "Upgrade the Database"?
Is it simply Upgrade the Database?
I think I am being thrown off as there is no specific actor/customer and that the customer is the IT department.
AS A [person/role]
I NEED TO [do something]
SO THAT [provides business value].
For your example a user story might look like this:
AS A user of the XYZ application
I NEED TO get reports of ABC faster
SO THAT we can increase our conversion rates.
ACCEPTANCE CRITERIA - The database reliably completes transactions on average in 2 seconds.
I've added an acceptance criteria because without this you will never know when the job is done. Now at this point, you have a business case for upgrading the database. This story would be decomposed into a story where the role is the IT department or DBA, like so:
AS AN administrator for the database server
I NEED TO upgrade to the latest version of FancyDB 11.7
SO THAT we can improve the average transaction time for XYZ users to 2 seconds.
ACCEPTANCE CRITERIA - the new version starts successfully, the XYZ developers sign off on the test installation of 11.7, data migration is successful, we have cut over to the new db
When story decomposition is added to your box of tools, the story must start from where the user is a real part of the business, and the "so that" leads to a real business value. Then decompose the story into one or more stories in which internal users do things "so that" real users get the benefits in need.
Here are a couple of articles that talk about Story Decomposition:
http://jpattonassociates.com/the_shrinking_story/
http://old.cognitive-edge.com/wp-content/uploads/1999/11/56-1999-11-Paradox-of-Story.pdf
Scrum is not very prescriptive and there is nothing in Scrum that forces you to use User Stories for your Product Backlog Items (PBIs). You can definitely do Scrum without capturing requirements/features as user stories, user stories are just one way to do it. Actually, stories do work for many teams, especially web development teams, but this doesn't mean that they work in all cases and on every project (many projects are web development but not all, like in your case). There is no consensus about using stories.
That said, the recommended template for User Stories is actually As a <role>, I want to <action> so that <benefits>. I don't mean to be picky but, if you choose to use stories, I'd warmly suggest to use it as is, without removing any part. First, using a role do help (a same user/person can have several roles) to discover stories. Then specifying the benefits is really important to expose the business value of a story in order to prioritize them well. Regarding the value, you should think of it as end-user/customer ("put on customer glasses" --Mary Poppendieck). It is really not always that easy to express the benefits, but some tools might help and my preferred one is the 5 whys (which is used for root cause analysis).
In your case, this could lead to something like: As the IT department, I want the database to be upgraded so that users can benefits from the latest features of the application and [do a better job|have a better user experience] (not very satisfying though, use the 5 whys).
But personally I don't find that user stories are the best medium for technical tasks even if it is clearly possible to use them and if they have their strengths. Theoretically, stories capture the essence, not the details and should be a support for the discussion. I may be wrong but I don't find that technical tasks offer much room for discussion and creativity. So, depending on who will read them, what the should convey, I might use them or not. Another option could be to mix stories with another formalism for your PBIs. As I said, the point is not to use stories, the point is to have a list of prioritized and estimated items.
Upgrade the database may be one of the tasks involved in implementing another story that brings direct value to the user, for example I as a user can add a new foo to my bar.
If adding a foo to a bar requires a database upgrade behind the scenes, then you would include that work in implementing that user story.
User stories are worded this way to help ensure that any work directly benefits the end user in some way.
This gets to the forefront of why user stories are so great.
What benefit does upgrading your database give to the end user? None? Then don't spend the time and money doing it. Spend that time and money providing something that will give value to your end user.
If it does? Then think about it the other way. Maybe you can only implement a new feature when you have version x of your database software? In the dependency of the story, you could mention that database upgrade required to provide this feature.
tl;dr Don't just upgrade for the sake of it. Make sure upgrading adds tangible value to your customers.
Generally, technical tasks in the PB are frowned upon because they very rarely directly deliver business value to the customer. That's why User Stories are popular, because they force you to think about the business value of the story, and who it's being delivered to.
So, why are you upgrading the database? Can you identify business value in upgrading it, and why should the Product Owner agree to let you upgrade the database instead of building new features?
Is it because of a new feature that will make it possible or make it easier to do something in your application? In that case, that something should be the PB item, and the database upgrade should be a task within that story. If you already have stories on the PB that would benefit from the upgrade, then you should increase the estimates for one or more of those stories, and add the upgrade as a technical task to the story.
Is it because the vendor of the database is cutting off an old version from support? In that case you could have the upgrade as the story; something like, "As the department manager, I want to be sure that we have support for all of the software so that the continuity of the business isn't at risk if something goes wrong". Even that's pushing it, though. Generally, this kind of reason isn't really part of a project, unless the project has been going on so long the system software goes off support.
Is it for performance? Then the story should be about some aspect of the performance of the application that needs to be improved to deliver business value. Something like, "As a CSR I need to be able to retrieve customer information in a reasonable time so that customers on the phone are satisfied with our service". Then the upgrade becomes a task under that story.
Is it for some totally technical reason? If you can't identify how the upgrade is going to deliver business value, then why would you do it? Why would the Product Owner select it for a Sprint?
It's simply "Upgrade the Database" or maybe "When the new version is installed, there must be a way to migrate the existing database". If you already know more details about this step, then include them. But the story mostly exists to make sure something isn't forgotten; it's not to be detailed.
Later, when you get to implement this story, you can flesh it out (which tables, do we need one or more backups, is there a fall back scenario, etc).
OTOH, if the project is more complex, this can become a "tag", like a post-it notice which must be attached to many stories. That means you must include this as a "sub story" to all stories which change the database. As you can see, these "project-spanning stories" are a bit hard to track with agile methods.
Infrastructure stories do not need to follow the prescribed story template. Just write down what needs to be done and estimate accordingly
How about:
As the application support person I want to be on the latest version of database because it is more reliable / more secure / whatever.
You could even phrase refactoring like that:
As the application developer I want all the data classes in one module so that I can add new fields to the app very quickly.
Who benefits
What you want to do
What the benefit is
Ideally you don't want all the stories to have 1 be developers, but a few make sense (sharpening your ax instead of cutting down trees and all that).
Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 3 years ago.
Improve this question
forget the weird cases/companies, but in general, who, in your view, is the person who should be able to put his/her foot down and say "THIS is the layout. THIS is where the marketing message comes, THIS is where the price comes, THIS is where the testimonial comes"?? - the boss man, the template designer, users (split testing or something?)
I have never seen a never-ending series of stupid arguments and suggestions that lead up to a website that is a total disaster. That is what is happening at my work-place.
Technically, who should have the final say? I am very new to corporate world so I'd like to know how it is done.
Edit: when the client is paying, what they want goes in and what they don't want doesn't. Clear. What about when the website is built in-house? the top brass is acting as if the company is democratic and stuff when its actually not. So, going by their acclaimed democratic process, who should make the decision?
My company is product based and we develop our own website.
The question is WHO... not WHY. So please don't even begin to justify your answer or this question will be closed as argumentative or something. If 8 out of 10 replies say a particular person is responsible, there is no need for an argument there. If the replies are equally distributed, i'll take it that there is no ideal person who has the final say in the real world. But for god's sake please don't turn this into an argument! :D
It doesn't matter so much who it is that makes the decision, as long as there is someone.
What you are facing seems to be the situation where there is noone responsible for these decisions, so everyone is making decisions back and forth, and noone has the final say.
It's natural that the client should have the final say, however it's common that the client doesn't really know what they want or how to describe what they want. In that case someone else has to make the decisions on what should be presented to the client for approval.
Even if there is a democratic process during the development (which is usually a good way to progress), a company is not a democracy. In the end someone has to take the fruits of the process and decide what's good for the final product and what's not.
Ultimately it would be the business owner or the person elected to represent the business owners.
However, they would normally expect to be able to delegate the responsibility for such decisions to a single person further down the hierarchy. This person should have the authority to coordinate the required people and departments and make a decision. In an ideal world this person has the humility to realise that they aren't a web or UI designer and will allow the experts to advise them.
It sounds like the decision making hasn't been delegated to an individual but to a number of people (or the individual who has the authority isn't able or willing to use it). These seems to be relatively common.
Who's paying for it?
The Client! However its the job of the service provider to shape the clients ideas - However, there is always an odd client who has very firm ideas of what they want, in this case not alot you can do other than produce it.
Edit:
In the case of In-House - It works from the top-down then, the Owner -> MD -> Managers etc etc
However you would like to think that the top level managment would know that a designer is a designer and know how to design.
Edit 2: When I did work in such a place it was the job of the Analyst.
I would say that the final say on how a site should look (in terms of design, screen flow and usability) should come from the client.
However designers and developers should try to frame their ideas from a business sense. Remember that most (ok some) designers have spent a large amount of time at university studying elements of graphical design and know what colours work together and what gets people’s attention. Good developers will have some understanding on usability and we all know that usability is important. Whilst the customer should always have the last say we (as service providers) should always be willing to provide input (if warranted).
most programmers find it convenient to just do what their client or employer say. that's where code monkey term comes from I guess.
I could never work like that but I don't expect client to automatically trust me as well. Trust is something that has to be earned by showing confidence, diligence and good ethics. if client doesn't trust his supplier, relationship is doomed. that's why code monkeys can never deliver good results.
The end-user. If its client, then he should decide. Else if its internal website, then the actual user.
Also see the book by Joel about UI. I don't remember the name though.
Everyone has a client - even in-house.
The 'person' who gets the final say are the ones who will be eventually using it.
Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 3 years ago.
Improve this question
Do you do it when you’re in the code doing something else?
When your manager approves it? (Seems this never happens)
I guess some of this depends on the impact of the changes. If I change the code and it affects nothing outside of the class, to me that is low impact.
What does it become a design change? When it effect X object or X projects?
I’m just curious how others teams tackle this...
As part of original development (red/green/refactor)
When suggested by a code reviewer
When we've noticed a design pain-point
When making another change, if the refactoring is low impact, i.e. typically not affecting any other files.
If it affects the public API, I generally like to make the refactoring a single source code commit which doesn't change behaviour (and then build new behaviour into another commit). If it affects other projects too, there needs to be consensus over it and I would want to get permission to change their code to go in the same refactoring commit.
I find I refactor when revisiting code (presumably to add/extend functionality) more than 3 months after it was written.
If it takes me more than 2 minutes to discern what a chunk of code is doing, I'll break it apart to make it more immediately understandable (or just add some more comments.)
as soon as all of the tests run.
I work in a large system, so I only change things I have to. It is easy to have bad side effects to changes.
I will refactor sections of code that are performing poorly, not working properly, or needs new functionality.
I never just decide to fix things, I would never be done. if it works, and no one is asking for changes or complaining about problems, move on. life is too short to fix everything.
I often refactor my code when there is a user requirement change or bug fixes. Then there will be a chance for people to review your changes.
Otherwise, I normally don't touch the workable code even it smells.
We found small refactorings are best done while we were working on a bit of code - do what's required, preferably paired.
For bigger things, we had a Technical Debt section on the wall - if you spotted something and didn't have the time to address it, or it was going to take some discussion to solve, you'd add it to the wall and they would be scheduled for future iterations (or when free time cropped up).
Refactoring while you're already in the code is sometimes easiest, especially if your manager does not support the initiative, but if you only change a small part it will break consistency with surrounding parts. In these cases it's better to be selective and, as you suggested, do things that are low-impact. It may also be helpful to refactor long select/switch statements into functions and delay on refactoring the inner code until sometime later.
At a previous job, I was the manager, so I refactored whenever I wanted. At my current job, I'm an analyst so most of the code is not directly my responsibility. When I do write code, I avoid impacting anything that I'm not writing. I have one project which is entirely under my own control and I refactor any time I learn a better way to do something.
We refactor as often as we can. Having unit tests to ensure that everything works pre- and post- refactoring really helps.
Code review processes often help with this. If I touch some code, it gets reviewed, reviewer asks, "why did you do it this way?", I say, "I had to because of (insert ugliness here)". This is a sign that the code should be refactored right after the review is done.
To look at our company, we have decided that our upcoming application release is mostly dedicated to performance optimizations rather than new functionality. This was something we felt was needed and also was requested by some clients.
Therefore we have spent a lot of time identifying performance bottlenecks in our app and reviewing code and refactoring it to make things run faster.
So in our case we did it because management approved us doing it for this new release, because we showed to them how much performance improvement could be gained.
Refactor when needed:
when you need a better understanding of the code you are working on (pairing often helps here), examples are: renaming, method extraction etc.
when the current design doesn't allow for a 'clean' change: at this point you can actually argue with your manager on a value basis (e.g. what is this new feature worth to the project)
I am always making small refactorings in my code. I know as long as I have my unit tests to verify that everything is still functioning properly afterward, I see no harm in doing it as I go. That way you don't get that vague "needs refactoring" feeling every time you work on it.
Now if it requires a large refactoring, it's best to plan for that and set aside some time.
Seems most other posters are resistant to refacotring mercilessly. Of course this isn't possible if the system you're working on doesn't support this through extensive unit tests. But in general, If I can see an opportunity to make the code tighter without spending more than a few minutes or hours at most, I go for it. If I'm not sure what I should be working on, I look for something to refactor.
I refactor when I'm fixing a bug or adding a feature and the process of refactoring makes the code easier to read and easier to maintain.
Following DRY principles vehemently will often be a trigger for me to refactor.
Insufficiently often, thus building up technical debt.
Sad, but so.
Do as I say, not as the team I work on does.
Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 3 years ago.
Improve this question
I would like to know your experience when you need to take over somebody else's software project - more so when the original software developer has already resigned.
The most success that we've had with that is to "wiki" everything. During the notice period ask the leaving developer to help you document everything in the team/company wiki and see if you can do code reviews with him/her and add comments to the code while doing the reviews that explain sections. Best for the "taking over" developer to write the comments in the code under the supervision of the leaver.
Cases where original devs leaved before handing over the project are always the most interesting: you're stuck with a codebase in an unknown state. What I always find intriguing is how the new devs often do their utmost best to comment on how badly designed the code is: they forget about the constraints the old devs might have been under, the shortcuts they might have been forced to make. The saying is always Old dev == bad dev. What do you people think:
I would even call this out as an official bad practice: bad-mouthing the ones who have been before us.
I try to take as much a pragmatic approach as possible: learn the codebase, wander around a bit. Try to understand the relation between requirements and code, even is there is no clear initial relationship at all. There will always be the "aha moment" when you realise why they did something was done this way or that. If you're still convinced something is implemented the wrong way, do your refactorings if possible. And isolate the pieces of code you cannot change: unit test them by using a mocking framework.
Hail to the maintenance developer.
I once joined a team which has been handed over a pile of steaming crap from outsourcing. The original project - a multimedia content manager based on Java, Struts, Hibernate|Oracle - was well structured (it seems like it was the work of a couple of people, pair programming, wise use of design patterns, some unit testing). Then someone else inherited the project and endlessly copy-pasted features, loosened the business rules, patched, branched until it became a huge spaghetti monster with fine crafted piece of codes like:
List<Stuff> stuff = null;
if (LOG.isDebugEnabled())
{
stuff = findStuff();
LOG.debug("Yeah, I'm a smart guy!");
for (Stuff stu : stuff)
{
LOG.debug("I've got this stuff: " + stu);
}
}
methodThatUsesStuff(stuff);
hidden amongst the other brilliant ingenuity.
I tamed the beast via patient refactoring (extracting methods and classes more of the times), commenting the code from time to time, reorganizing everything till the codebase shrunk by 30%, getting more and more manageable over time.
I had to take over someone else’s code of different degrees of quality on several occasions. Hence the tips:
Make effort to take structured notes of any piece of significant information from minute one: names of stakeholders, business rules, code and document locations etc. It is best to dedicate a fresh spiral notebook, so you could tear pages out if you had to.
Make use of one of the better free indexing and desktop search tools available on the market (Google Desktop Search, MS Windows Search will do). Add all document, e-mail, code locations to it.
Before developing anything do document analysis: find everything you can get you hands on electronically on network and printed out docs, make effort of simply reading it. There is amazingly much of useful information even within unfinished drafts.
Mind map the code, architecture etc as you go.
With lesser documented and maintained systems you inevitably will have moments of despair that are likely to push you into procrastination mode. Especially during your first days or week when amount of new information your mind has to digest is overwhelming. At these times it is nice to have someone to remind you (or just do it yourself) to take it easy, concentrate on important things first and revert to making smaller steps in trying to gain understanding instead of trying to leap forward.
Keep taking notes, making diagrams, drawing rich pictures, mind mapping. It really helps to digest the copious amounts of new information, mostly disorganised.
Hei, good luck!
We actually have a specified set of "Deliverables" that has to be present for us to take over a project.
If we have the chance we try to push in one of our folks within the group developing the project at first. That way we get some firsthand knowledgde before our group takes over the code. (in the line of what #Guy wrote)
That being said, the most important part for me would be:
Some kind og highlevel overview(drawing?) of what the code do.
Easy access to ask questions of the people who actually wrote the code
This for me is alpha omega when taking over code and projects