My bike computer can show me various figures such as distance travelled, time elapsed, max speed, average speed, current speed etc. I usually have it set to display the current and average speeds.
You can reset the distance and time (both together) at any point; the max and average speeds are calculated since the last reset. The distance is taken from the wheel sensor (you have to calibrate it initially to tell it the circumference of your wheel) and the time is from its own real-time clock.
Now, quite often while I am cycling along, I will be going at well above the displayed average speed and yet the average speed shown will go down. As a concrete example, this evening I was cycling home and my current speed was holding steady at 19.5 mph; my average was showing 12.6 mph and as I looked at it, it clicked downwards to 12.5.
What I'm trying to work out is what kind of bizarre averaging algorithm it is using that can give this effect. I can't believe it's doing any kind of fancy stuff other than total distance / total time. I guess it must be some sort of rounding / boundary condition but I can't work out what. Any suggestions?
[I asked this around the office at work but nobody had any ideas other than that I should stop worrying about these sorts of details! Hey, I have to think about something when I'm cycling, it's 9 miles each way...]

I'm going to guess that it has a history of a certain number of data points and displays the average over them. As time goes on the older points are pushed off.
If you were going faster at the point far enough back to be the end of the history pushing off a point will lower your average.

It's not a running average, it's supposed to be the average for the whole trip, right? At least that's what I always assumed mine was doing.
I've noticed that effect too. My theory is that both the clock and the distance counter it uses for the average have a fairly low resolution, so sometimes the clock counter ticks up while the distance counter stays steady, and you get the dip. For Example:
dist time spd
8.5 40.1 12.72
8.5 40.2 12.69
If they are using an integer processor and fixed point, truncation would make the drop appear even larger

It's really a motivational technique.

It probably uses something similar to the Remaining time estimation algorithm.

It's timing between rotations of the wheel but it can easily miss a pass of the magnet over the sensor because of a bump in the road or noise.
So you measure a speed half the correct value for that one data point, it then does a running average so that bad point pollutes the speed for the next few revolutions.

The system needs to sample at some (probably constant) rate.
In order to compute a moving average it only stores at most N datapoints.
So in order to update the average it must drop one of its stored points to get a new average, and if the dropped point was faster than your current speed, the moving average would drop.

Related

Finding the time in which a specific value is reached in time-series data when peaks are found

I would like to find the time instant at which a certain value is reached in a time-series data with noise. If there are no peaks in the data, I could do the following in MATLAB.
Code from here
% create example data
d=1:100;
t=d/100;
ts = timeseries(d,t);
% define threshold
thr = 55;
data = ts.data(:);
time = ts.time(:);
ind = find(data>thr,1,'first');
time(ind) %time where data>threshold
But when there is noise, I am not sure what has to be done.
In the time-series data plotted in the above image I want to find the time instant at which the y-axis value 5 is reached. The data actually stabilizes to 5 at t>=100 s. But due to the presence of noise in the data, we see a peak that reaches 5 somewhere around 20 s . I would like to know how to detect e.g 100 seconds as the right time and not 20 s . The code posted above will only give 20 s as the answer. I
saw a post here that explains using a sliding window to find when the data equilibrates. However, I am not sure how to implement the same. Suggestions will be really helpful.
The sample data plotted in the above image can be found here
Suggestions on how to implement in Python or MATLAB code will be really helpful.
EDIT:
I don't want to capture when the peak (/noise/overshoot) occurs. I want to find the time when equilibrium is reached. For example, around 20 s the curve rises and dips below 5. After ~100 s the curve equilibrates to a steady-state value 5 and never dips or peaks.
Precise data analysis is a serious business (and my passion) that involves a lot of understanding of the system you are studying. Here are comments, unfortunately I doubt there is a simple nice answer to your problem at all -- you will have to think about it. Data analysis basically always requires "discussion".
First to your data and problem in general:
When you talk about noise, in data analysis this means a statistical random fluctuation. Most often Gaussian (sometimes also other distributions, e.g. Poission). Gaussian noise is a) random in each bin and b) symmetric in negative and positive direction. Thus, what you observe in the peak at ~20s is not noise. It has a very different, very systematic and extended characteristics compared to random noise. This is an "artifact" that must have a origin, but of which we can only speculate here. In real-world applications, studying and removing such artifacts is the most expensive and time-consuming task.
Looking at your data, the random noise is negligible. This is very precise data. For example, after ~150s and later there are no visible random fluctuations up to fourth decimal number.
After concluding that this is not noise in the common sense it could be a least two things: a) a feature of the system you are studying, thus, something where you could develop a model/formula for and which you could "fit" to the data. b) a characteristics of limited bandwidth somewhere in the measurement chain, thus, here a high-frequency cutoff. See e.g. https://en.wikipedia.org/wiki/Ringing_artifacts . Unfortunately, for both, a and b, there are no catch-all generic solutions. And your problem description (even with code and data) is not sufficient to propose an ideal approach.
After spending now ~one hour on your data and making some plots. I believe (speculate) that the extremely sharp feature at ~10s cannot be a "physical" property of the data. It simply is too extreme/steep. Something fundamentally happened here. A guess of mine could be that some device was just switched on (was off before). Thus, the data before is meaningless, and there is a short period of time afterwards to stabilize the system. There is not really an alternative in this scenario but to entirely discard the data until the system has stabilized at around 40s. This also makes your problem trivial. Just delete the first 40s, then the maximum becomes evident.
So what are technical solutions you could use, please don't be too upset that you have to think about this yourself and assemble the best possible solution for your case. I copied your data in two numpy arrays x and y and ran the following test in python:
Remove unstable time
This is the trivial solution -- I prefer it.
plt.figure()
plt.xlabel('time')
plt.ylabel('signal')
plt.plot(x, y, label="original")
y_cut = y
y_cut[:40] = 0
plt.plot(x, y_cut, label="cut 40s")
plt.legend()
plt.grid()
plt.show()
Note carry on reading below only if you are a bit crazy (about data).
Sliding window
You mentioned "sliding window" which is best suited for random noise (which you don't have) or periodic fluctuations (which you also don't really have). Sliding window just averages over consecutive bins, averaging out random fluctuations. Mathematically this is a convolution.
Technically, you can actually solve your problem like this (try even larger values of Nwindow yourself):
Nwindow=10
y_slide_10 = np.convolve(y, np.ones((Nwindow,))/Nwindow, mode='same')
Nwindow=20
y_slide_20 = np.convolve(y, np.ones((Nwindow,))/Nwindow, mode='same')
Nwindow=30
y_slide_30 = np.convolve(y, np.ones((Nwindow,))/Nwindow, mode='same')
plt.xlabel('time')
plt.ylabel('signal')
plt.plot(x,y, label="original")
plt.plot(x,y_slide_10, label="window=10")
plt.plot(x,y_slide_20, label='window=20')
plt.plot(x,y_slide_30, label='window=30')
plt.legend()
#plt.xscale('log') # useful
plt.grid()
plt.show()
Thus, technically you can succeed to suppress the initial "hump". But don't forget this is a hand-tuned and not general solution...
Another caveat of any sliding window solution: this always distorts your timing. Since you average over an interval in time depending on rising or falling signals your convoluted trace is shifted back/forth in time (slightly, but significantly). In your particular case this is not a problem since the main signal region has basically no time-dependence (very flat).
Frequency domain
This should be the silver bullet, but it also does not work well/easily for your example. The fact that this doesn't work better is the main hint to me that the first 40s of data are better discarded.... (i.e. in a scientific work)
You can use fast Fourier transform to inspect your data in frequency-domain.
import scipy.fft
y_fft = scipy.fft.rfft(y)
# original frequency domain plot
plt.plot(y_fft, label="original")
plt.xlabel('frequency')
plt.ylabel('signal')
plt.yscale('log')
plt.show()
The structure in frequency represent the features of your data. The peak a zero is the stabilized region after ~100s, the humps are associated to (rapid) changes in time. You can now play around and change the frequency spectrum (--> filter) but I think the spectrum is so artificial that this doesn't yield great results here. Try it with other data and you may be very impressed! I tried two things, first cut high-frequency regions out (set to zero), and second, apply a sliding-window filter in frequency domain (sparing the peak at 0, since this cannot be touched. Try and you know why).
# cut high-frequency by setting to zero
y_fft_2 = np.array(y_fft)
y_fft_2[50:70] = 0
# sliding window in frequency
Nwindow = 15
Start = 10
y_fft_slide = np.array(y_fft)
y_fft_slide[Start:] = np.convolve(y_fft[Start:], np.ones((Nwindow,))/Nwindow, mode='same')
# frequency-domain plot
plt.plot(y_fft, label="original")
plt.plot(y_fft_2, label="high-frequency, filter")
plt.plot(y_fft_slide, label="frequency sliding window")
plt.xlabel('frequency')
plt.ylabel('signal')
plt.yscale('log')
plt.legend()
plt.show()
Converting this back into time-domain:
# reverse FFT into time-domain for plotting
y_filtered = scipy.fft.irfft(y_fft_2)
y_filtered_slide = scipy.fft.irfft(y_fft_slide)
# time-domain plot
plt.plot(x[:500], y[:500], label="original")
plt.plot(x[:500], y_filtered[:500], label="high-f filtered")
plt.plot(x[:500], y_filtered_slide[:500], label="frequency sliding window")
# plt.xscale('log') # useful
plt.grid()
plt.legend()
plt.show()
yields
There are apparent oscillations in those solutions which make them essentially useless for your purpose. This leads me to my final exercise to again apply a sliding-window filter on the "frequency sliding window" time-domain
# extra time-domain sliding window
Nwindow=90
y_fft_90 = np.convolve(y_filtered_slide, np.ones((Nwindow,))/Nwindow, mode='same')
# final time-domain plot
plt.plot(x[:500], y[:500], label="original")
plt.plot(x[:500], y_fft_90[:500], label="frequency-sliding window, slide")
# plt.xscale('log') # useful
plt.legend()
plt.show()
I am quite happy with this result, but it still has very small oscillations and thus does not solve your original problem.
Conclusion
How much fun. One hour well wasted. Maybe it is useful to someone. Maybe even to you Natasha. Please be not mad a me...
Let's assume your data is in data variable and time indices are in time. Then
import numpy as np
threshold = 0.025
stable_index = np.where(np.abs(data[-1] - data) > threshold)[0][-1] + 1
print('Stabilizes after', time[stable_index], 'sec')
Stabilizes after 96.6 sec
Here data[-1] - data is a difference between last value of data and all the data values. The assumption here is that the last value of data represents the equilibrium point.
np.where( * > threshold )[0] are all the indices of values of data which are greater than the threshold, that is still not stabilized. We take only the last index. The next one is where time series is considered stabilized, hence the + 1.
If you're dealing with deterministic data which is eventually converging monotonically to some fixed value, the problem is pretty straightforward. Your last observation should be the closest to the limit, so you can define an acceptable tolerance threshold relative to that last data point and scan your data from back to front to find where you exceeded your threshold.
Things get a lot nastier once you add random noise into the picture, particularly if there is serial correlation. This problem is common in simulation modeling(see (*) below), and is known as the issue of initial bias. It was first identified by Conway in 1963, and has been an active area of research since then with no universally accepted definitive answer on how to deal with it. As with the deterministic case, the most widely accepted answers approach the problem starting from the right-hand side of the data set since this is where the data are most likely to be in steady state. Techniques based on this approach use the end of the dataset to establish some sort of statistical yardstick or baseline to measure where the data start looking significantly different as observations get added by moving towards the front of the dataset. This is greatly complicated by the presence of serial correlation.
If a time series is in steady state, in the sense of being covariance stationary then a simple average of the data is an unbiased estimate of its expected value, but the standard error of the estimated mean depends heavily on the serial correlation. The correct standard error squared is no longer s2/n, but instead it is (s2/n)*W where W is a properly weighted sum of the autocorrelation values. A method called MSER was developed in the 1990's, and avoids the issue of trying to correctly estimate W by trying to determine where the standard error is minimized. It treats W as a de-facto constant given a sufficiently large sample size, so if you consider the ratio of two standard error estimates the W's cancel out and the minimum occurs where s2/n is minimized. MSER proceeds as follows:
Starting from the end, calculate s2 for half of the data set to establish a baseline.
Now update the estimate of s2 one observation at a time using an efficient technique such as Welford's online algorithm, calculate s2/n where n is the number of observations tallied so far. Track which value of n yields the smallest s2/n. Lather, rinse, repeat.
Once you've traversed the entire data set from back to front, the n which yielded the smallest s2/n is the number of observations from the end of the data set which are not detectable as being biased by the starting conditions.
Justification - with a sufficiently large baseline (half your data), s2/n should be relatively stable as long as the time series remains in steady state. Since n is monotonically increasing, s2/n should continue decreasing subject to the limitations of its variability as an estimate. However, once you start acquiring observations which are not in steady state the drift in mean and variance will inflate the numerator of s2/n. Hence the minimal value corresponds to the last observation where there was no indication of non-stationarity. More details can be found in this proceedings paper. A Ruby implementation is available on BitBucket.
Your data has such a small amount of variation that MSER concludes that it is still converging to steady state. As such, I'd advise going with the deterministic approach outlined in the first paragraph. If you have noisy data in the future, I'd definitely suggest giving MSER a shot.
(*) - In a nutshell, a simulation model is a computer program and hence has to have its state set to some set of initial values. We generally don't know what the system state will look like in the long run, so we initialize it to an arbitrary but convenient set of values and then let the system "warm up". The problem is that the initial results of the simulation are not typical of the steady state behaviors, so including that data in your analyses will bias them. The solution is to remove the biased portion of the data, but how much should that be?

How to measure "homogeneity" of time series?

I have two time series, see this pic:
I need to measure the level of "homogeneity" of the series. So the first one looks very fragmented, so it should have low value close to zero and the second one should have a high value.
Any ideas of an algorithm I could use?
I'm not sure what is meant by homogeneity, but there is a well-established notion of stationarity of a time series. Basically, a time series is stationary if its rolling mean and standard deviation are constant across time. Both of your time series seem to have roughly constant mean, but the top one has a standard deviation that changes wildly across time; sometimes it's almost zero, and at other times, it's very large. Perhaps you could take the standard deviation of the rolling standard deviation, which will be far higher for the top series than for the bottom. If you can load them into pandas as top and bottom, it might look like
top_nonstationarity = np.std(top.rolling(window_size).std())
bottom_nonstationarity = np.std(bottom.rolling(window_size).std())
It might help to know more about the underlying difference between the series, or what you care about, but here goes...
I would subtract constants, if required, to give both series mean zero, and then square them to get something resembling power and filter this enough to smooth away what seems to be noise in the case of the lower filter. Then compute and compare the variances of the two filtered powers, which for the lower time series I would now expect to be a fairly constant line with a few drops down and for the upper series something spending about half of its time near zero and about half of its time away from it.
Possible filters include a simple moving average, whatever your time series toolkit provides, and those described at https://en.wikipedia.org/wiki/Savitzky%E2%80%93Golay_filter

Rapid change detection algorithm

I'm logging temperature values in a room, saving them to the database. I'd like to be alerted when temperature rises suddenly. I can't set fixed values, because 18°C is acceptable in winter and 25°C is acceptable in summer. But if it jumps from 20°C to 25°C during, let's say, 30 minutes and stays like this for 5 minutes (to eliminate false readouts), I'd like to be informed.
My current idea is to take readouts from last 30 minutes (A) and readouts from last 5 minutes (B), calculate median of A and B and check if difference between them is less then my desired threshold.
Is this correct way to solve this or is there a better algorithm? I searched for a specific one but most of them seem overcomplicated.
Thanks!
Detecting changes in a time-series is a well-researched subject, and hundreds if not thousands of papers have been written on this subject. As you've seen many methods are quite advanced, but proved to be quite useful for many use cases. Whatever method you choose, you should evaluate it against real of simulated data, and optimize its parameters for your use case.
As you require, let me suggest a very simple method that in many cases prove to be good enough, and is quite similar to that you considered.
Basically, you have two concerns:
Detecting a monotonous change in a sampled noisy signal
Ignoring false readouts
First, note that medians are not commonly used for detecting trends. For the series (1,2,3,30,35,3,2,1) the medians of 5 consecutive terms is be (3, 3, 3, 3). It is much more common to use averages.
One common trick is to throw the extreme values before averaging (e.g. for each 7 values average only the middle 5). If many false readouts are expected - try to take measurements at a faster rate, and throw more extreme values (e.g. for each 13 values average the middle 9).
Also, you should throw away unfeasible values and replace them with the last measured value (unfeasible means out of range, or non-physical change rate).
Your idea of comparing a short-period measure with a long-period measure is a good idea, and indeed it is commonly used (e.g. in econometrics).
Quoting from "Financial Econometric Models - Some Contributions to the Field [Nicolau, 2007]:
Buy and sell signals are generated by two moving averages of the price
level: a long-period average and a short-period average. A typical
moving average trading rule prescribes a buy (sell) when the
short-period moving average crosses the long-period moving average
from below (above) (i.e. when the original time series is rising
(falling) relatively fast).
When you say "rises suddenly," mathematically you are talking about the magnitude of the derivative of the temperature signal.
There is a nice algorithm to simultaneously smooth a signal and calculate its derivative called the Savitzky–Golay filter. It's explained with examples on Wikipedia, or you can use Matlab to help you generate the convolution coefficients required. Once you have the coefficients the calculation is very simple.

What are some good approaches to predicting the completion time of a long process?

tl;dr: I want to predict file copy completion. What are good methods given the start time and the current progress?
Firstly, I am aware that this is not at all a simple problem, and that predicting the future is difficult to do well. For context, I'm trying to predict the completion of a long file copy.
Current Approach:
At the moment, I'm using a fairly naive formula that I came up with myself: (ETC stands for Estimated Time of Completion)
ETC = currTime + elapsedTime * (totalSize - sizeDone) / sizeDone
This works on the assumption that the remaining files to be copied will do so at the average copy speed thus far, which may or may not be a realistic assumption (dealing with tape archives here).
PRO: The ETC will change gradually, and becomes more and more accurate as the process nears completion.
CON: It doesn't react well to unexpected events, like the file copy becoming stuck or speeding up quickly.
Another idea:
The next idea I had was to keep a record of the progress for the last n seconds (or minutes, given that these archives are supposed to take hours), and just do something like:
ETC = currTime + currAvg * (totalSize - sizeDone)
This is kind of the opposite of the first method in that:
PRO: If the speed changes quickly, the ETC will update quickly to reflect the current state of affairs.
CON: The ETC may jump around a lot if the speed is inconsistent.
Finally
I'm reminded of the control engineering subjects I did at uni, where the objective is essentially to try to get a system that reacts quickly to sudden changes, but isn't unstable and crazy.
With that said, the other option I could think of would be to calculate the average of both of the above, perhaps with some kind of weighting:
Weight the first method more if the copy has a fairly consistent long-term average speed, even if it jumps around a bit locally.
Weight the second method more if the copy speed is unpredictable, and is likely to do things like speed up/slow down for long periods, or stop altogether for long periods.
What I am really asking for is:
Any alternative approaches to the two I have given.
If and how you would combine several different methods to get a final prediction.
If you feel that the accuracy of prediction is important, the way to go about about building a predictive model is as follows:
collect some real-world measurements;
split them into three disjoint sets: training, validation and test;
come up with some predictive models (you already have two plus a mix) and fit them using the training set;
check predictive performance of the models on the validation set and pick the one that performs best;
use the test set to assess the out-of-sample prediction error of the chosen model.
I'd hazard a guess that a linear combination of your current model and the "average over the last n seconds" would perform pretty well for the problem at hand. The optimal weights for the linear combination can be fitted using linear regression (a one-liner in R).
An excellent resource for studying statistical learning methods is The Elements of
Statistical Learning by Hastie, Tibshirani and Friedman. I can't recommend that book highly enough.
Lastly, your second idea (average over the last n seconds) attempts to measure the instantaneous speed. A more robust technique for this might be to use the Kalman filter, whose purpose is exactly this:
Its purpose is to use measurements observed over time, containing
noise (random variations) and other inaccuracies, and produce values
that tend to be closer to the true values of the measurements and
their associated calculated values.
The principal advantage of using the Kalman filter rather than a fixed n-second sliding window is that it's adaptive: it will automatically use a longer averaging window when measurements jump around a lot than when they're stable.
Imho, bad implementations of ETC are wildly overused, which allows us to have a good laugh. Sometimes, it might be better to display facts instead of estimations, like:
5 of 10 files have been copied
10 of 200 MB have been copied
Or display facts and an estimation, and make clear that it is only an estimation. But I would not display only an estimation.
Every user knows that ETCs are often completely meaningless, and then it is hard to distinguish between meaningful ETCs and meaningless ETCs, especially for inexperienced users.
I have implemented two different solutions to address this problem:
The ETC for the current transfer at start time is based on a historic speed value. This value is refined after each transfer. During the transfer I compute a weighted average between the historic data and data from the current transfer, so that the closer to the end you are the more weight is given to actual data from the transfer.
Instead of showing a single ETC, show a range of time. The idea is to compute the ETC from the last 'n' seconds or minutes (like your second idea). I keep track of the best and worst case averages and compute a range of possible ETCs. This is kind of confusing to show in a GUI, but okay to show in a command line app.
There are two things to consider here:
the exact estimation
how to present it to the user
1. On estimation
Other than statistics approach, one simple way to have a good estimation of the current speed while erasing some noise or spikes is to take a weighted approach.
You already experimented with the sliding window, the idea here is to take a fairly large sliding window, but instead of a plain average, giving more weight to more recent measures, since they are more indicative of the evolution (a bit like a derivative).
Example: Suppose you have 10 previous windows (most recent x0, least recent x9), then you could compute the speed:
Speed = (10 * x0 + 9 * x1 + 8 * x2 + ... + x9) / (10 * window-time) / 55
When you have a good assessment of the likely speed, then you are close to get a good estimated time.
2. On presentation
The main thing to remember here is that you want a nice user experience, and not a scientific front.
Studies have demonstrated that users reacted very badly to slow-down and very positively to speed-up. Therefore, a good progress bar / estimated time should be conservative in the estimates presented (reserving time for a potential slow-down) at first.
A simple way to get that is to have a factor that is a percentage of the completion, that you use to tweak the estimated remaining time. For example:
real-completion = 0.4
presented-completion = real-completion * factor(real-completion)
Where factor is such that factor([0..1]) = [0..1], factor(x) <= x and factor(1) = 1. For example, the cubic function produces the nice speed-up toward the completion time. Other functions could use an exponential form 1 - e^x, etc...

Understanding algorithms for measuring trends

What's the rationale behind the formula used in the hive_trend_mapper.py program of this Hadoop tutorial on calculating Wikipedia trends?
There are actually two components: a monthly trend and a daily trend. I'm going to focus on the daily trend, but similar questions apply to the monthly one.
In the daily trend, pageviews is an array of number of page views per day for this topic, one element per day, and total_pageviews is the sum of this array:
# pageviews for most recent day
y2 = pageviews[-1]
# pageviews for previous day
y1 = pageviews[-2]
# Simple baseline trend algorithm
slope = y2 - y1
trend = slope * log(1.0 +int(total_pageviews))
error = 1.0/sqrt(int(total_pageviews))
return trend, error
I know what it's doing superficially: it just looks at the change over the past day (slope), and scales this up to the log of 1+total_pageviews (log(1)==0, so this scaling factor is non-negative). It can be seen as treating the month's total pageviews as a weight, but tempered as it grows - this way, the total pageviews stop making a difference for things that are "popular enough," but at the same time big changes on insignificant don't get weighed as much.
But why do this? Why do we want to discount things that were initially unpopular? Shouldn't big deltas matter more for items that have a low constant popularity, and less for items that are already popular (for which the big deltas might fall well within a fraction of a standard deviation)? As a strawman, why not simply take y2-y1 and be done with it?
And what would the error be useful for? The tutorial doesn't really use it meaningfully again. Then again, it doesn't tell us how trend is used either - this is what's plotted in the end product, correct?
Where can I read up for a (preferably introductory) background on the theory here? Is there a name for this madness? Is this a textbook formula somewhere?
Thanks in advance for any answers (or discussion!).
As the in-line comment goes, this is a simple "baseline trend algorithm",
which basically means before you compare the trends of two different pages, you have to establish
a baseline. In many cases, the mean value is used, it's straightforward if you
plot the pageviews against the time axis. This method is widely used in monitoring
water quality, air pollutants, etc. to detect any significant changes w.r.t the baseline.
In OP's case, the slope of pageviews is weighted by the log of totalpageviews.
This sorta uses the totalpageviews as a baseline correction for the slope. As Simon put it, this puts a balance
between two pages with very different totalpageviews.
For exmaple, A has a slope 500 over 1000,000 total pageviews, B is 1000 over 1,000.
A log basically means 1000,000 is ONLY twice more important than 1,000 (rather than 1000 times).
If you only consider the slope, A is less popular than B.
But with a weight, now the measure of popularity of A is the same as B. I think it is quite intuitive:
though A's pageviews is only 500 pageviews, but that's because it's saturating, you still gotta give it enough credit.
As for the error, I believe it comes from the (relative) standard error, which has a factor 1/sqrt(n), where
n is the number of data points. In the code, the error is equal to (1/sqrt(n))*(1/sqrt(mean)).
It roughly translates into : the more data points, the more accurate the trend. I don't see
it is an exact math formula, just a brute trend analysis algorithm, anyway the relative
value is more important in this context.
In summary, I believe it's just an empirical formula. More advanced topics can be found in some biostatistics textbooks (very similar to monitoring the breakout of a flu or the like.)
The code implements statistics (in this case the "baseline trend"), you should educate yourself on that and everything becomes clearer. Wikibooks has a good instroduction.
The algorithm takes into account that new pages are by definition more unpopular than existing ones (because - for example - they are linked from relatively few other places) and suggests that those new pages will grow in popularity over time.
error is the error margin the system expects for its prognoses. The higher error is, the more unlikely the trend will continue as expected.
The reason for moderating the measure by the volume of clicks is not to penalise popular pages but to make sure that you can compare large and small changes with a single measure. If you just use y2 - y1 you will only ever see the click changes on large volume pages. What this is trying to express is "significant" change. 1000 clicks change if you attract 100 clicks is really significant. 1000 click change if you attract 100,000 is less so. What this formula is trying to do is make both of these visible.
Try it out at a few different scales in Excel, you'll get a good view of how it operates.
Hope that helps.
another way to look at it is this:
suppose your page and my page are made at same day, and ur page gets total views about ten million, and mine about 1 million till some point. then suppose the slope at some point is a million for me, and 0.5 million for you. if u just use slope, then i win, but ur page already had more views per day at that point, urs were having 5 million, and mine 1 million, so that a million on mine still makes it 2 million, and urs is 5.5 million for that day. so may be this scaling concept is to try to adjust the results to show that ur page is also good as a trend setter, and its slope is less but it already was more popular, but the scaling is only a log factor, so doesnt seem too problematic to me.