following the text book, I do measure performance whenever I try optimizing my code. Sometimes, however, the performance gain is rather small and I can't decisively decide whether I should implement that optimization.
For example, when a fix shortens an average response time of 100ms to 90ms under some conditions, should I implement that fix? What if it shortens 200ms to 190ms? How many condition should I try before I can conclude that it will be beneficial overall?
I guess it's not possible to give a straight forward answer to this, as it depends on too many things, but is there a good rule of thumb that I should follow? Are there any guideline/best-practices?
EDIT:Thanks for the great answers! I guess the moral of the story is, there is no easy way to tell whether you should, but there ARE guidelines that can aid that process.. Things you should consider, things you shouldn't do etc. This particular time I ended up implementing the fix, even though it made a few line of code into 20-30 lines of code. Because our app. is very performance critical, and it was a consistent 10% gain in various realistic cases.
I think the rule of thumb (at least for me) is two-fold:
"It matters if it matters"--in the business world, this generally means that it matters if the clients care. That is, if the end users will "notice" the difference between 100ms and 90ms (I'm not being facetious here), then it matters.
If "it matters," then you will want to test your code thoroughly against a realistic variety of use cases that are likely to arise or at least may arise. If an optimization speeds up code in 50% of cases, but actually runs slower than what you previously had the other 50% of the time, obviously, it may not be worth implementing.
Regarding point 1 above: by suggesting an end user of your software might "notice" a 10ms difference, I don't mean to suggest that they will actually visibly see a difference. But if your app runs on a server with millions of connections and every little speed increase takes a substantial load off the server, that might matter to the client running the server. Or if your app performs extremely time-critical work, this is another case where the result of a 10ms speedup might be noticeable, even if the speedup itself isn't.
The only sensible approach to your question is something along the lines of "when the benefit is large enough to warrant the time you invest in exploring, implementing and testing the optimization."
The "benefit is large enough" is extremely subjective. Can you or your employer sell more units of software if you make this change? Will your user base notice? Will it give you personal gratification to have the fastest-possible code? Which of those or similar questions apply is something only you can know.
By and large, most of the software I have written (in a 20+ year career) has been "fast enough" out of the box, and the code I cared to optimize presented itself as an obvious bottleneck to the end users: Queries taking a long time, scrolling too slow, that sort of thing.
Donald Knuth made the following two statements on optimization:
"We should forget about small
efficiencies, say about 97% of the
time: premature optimization is the
root of all evil" [2]
and
"In established engineering
disciplines a 12 % improvement, easily
obtained, is never considered marginal
and I believe the same viewpoint
should prevail in software
engineering"[5]
src: http://en.wikipedia.org/wiki/Program_optimization
Is the optimization obfuscating your code too much?
Do you really need an optimization? if your app just runs fine then readability of the code is probably more important
Did you work on the general design and algorithms of your application before trying small hacky optimizations?
You should focus optimisation efforts on the parts of code that account for the most runtime. If a particular piece of code takes up 80% of the total runtime, then optimising it to reduce the time is takes by 5% will have as much impact as reducing the time of the rest of the code by 20%.
In general, optimisations make code less readable (not always, but often). Therefore you should avoid optimising until you are sure that there is a problem.
If it speeds up your program at all, why not implement it? You have already done the work by creating the new implementation, so you are not doing extra work by applying the new implementation.
Unless the code is THAT much harder to understand.
Also, 100 ms to 90 ms is a 10% gain in performance. A 10% gain should not be taken lightly.
The real question is, if it only took 100 ms to run in the first place, what was the point in trying to optimize it?
As long as it's fast enough, then you don't need to optimise any more. But then, you wouldn't even bother profiling if that was the case...
If the performance gain is small, consider the other factors: maintainability, risk of making the change, understandability, etc. If it reduces the ability to maintain or understand the code, it probably isn't worth doing. If it improves those attributes, then it's more reason to implement the change.
In most cases, your time is more valuable than the computer's. If you think it'll take you half an hour longer to work out what the code is doing later (say if there's a bug in it), and it's only saved you a few seconds, ever, you're at a net loss.
It depends very much on the usage scenario. I'll assume here that the code in question has been profiled and thus it is known to be the bottleneck--i.e. not just "this could be faster", but "the program would give results/finish running faster if this were faster". In situations where this is not the case--e.g. if you spend 99% of your time waiting for more data to come over an ethernet connection--then you should care about correctness but not optimize for speed.
If you are writing a piece of user interface code, what you care about is perceived speed. Generally anything under ~100 ms is perceived as "instant"--no point speeding it up.
If you are writing a piece of code for a giant server farm, then if the cost of your salary to make the code fast is less than the cost of the extra electricity for the server farm, it's worthwhile. (But be sure to prioritize your time.)
If you are writing a piece of code that is used rarely or when unattended, as long as it completes in a semi-sane duration, don't worry about it. Install scripts tend to be of this sort (unless you start running into many minutes, at which point users might start abandoning the install because it's taking too long).
If you are writing code to automate a task for someone else, then if (your time spent coding + their time spent using the optimized code) is less than (their time spent using the slow code), it's worthwhile. If you're doing this in a commercial setting, weight this by your respective salaries.
If you are writing library code that will be used by many thousands of people, always make it faster if you have time to.
If you are under time pressure to simply have something working e.g. as a demo, don't optimize (except through sensible choice of algorithms from libraries) unless the result would be so slow that it isn't even "working".
One of the biggest annoyances for me personally is finding software which perhaps initially fell into one category and then later fell into another, but for which nobody went back to do needed optimizations. Until recently Javascript performance was a great example of this. Moral of the story is: don't just decide once; revisit the issue as the situation demands.
Ahhhw, every time is so frustrating..
We have a dedicated server in our hosting company, and everytime i have to write down a new app (or an add to an pre-existing app), i use to 'lose' some time to optimize the code for many behaviors (reducing the db query, optimizing the db structure, reducing the bandwith, etc..) depending on what the app is supposed to do.
Obviously, is the point is not that i write bad code and then rebuild it, its just that after the project is complete, i allways find somethings that could be done better.
And everytime, if my boss catch me doing this, he say 'Your wasting your time! if the application need more resources, we buy more RAM, more CPU, or more bandwith!'.
What is the best (and simplyest) way to explain he that optimization is still important, and that is not so easy or automagically upgrating the hardware of an (production!) server?
EDIT: im not talking just about database optimization, but every aspect of an application
Chances are you are really wasting time. Most of the optimizations that you learn in college or university are sort of irrelevant in the business world. I recommend concentrating on those optimizations where you can quantify WHY your optimization is worth your company's money (your time spent is their money spent).
When trying to optimise code you need to follow the optimisation cycle. There are no short-cuts.
Define specific, detailed, measurable, performance requirements.
Measure your application's performance.
If it meets the requirements, stop, as continuing is a waste of time/money.
Determine where the bottleneck is (which machine? CPU, memory, disk, etc.?).
Fix the bottleneck (either hardware or software fix, whichever is faster/cheaper).
Go to 2.
From your post it doesn't sound like you have done 1 or 2, so you've skipped over 3 and 4 because you don't know enough to do them, and are now stumbling blindly around in 5 attempting to optimise whatever you think needs optimising.
So from what you've said I'd have to agree with your boss. You are wasting your time. Or at least you haven't followed enough process to prove otherwise, which is essentially the same thing.
Keep detailed notes and time sheets the next time you make a server move/upgrade, and protocol every minute of work that arose from it (including things in the weeks after). Then you'll have hard evidence that upgrading is expensive, and optimizations help delay the investment.
In the current situation, you might be able to do something with benchmarks and statistics along the line of "without my optimization, the server will be at 90% capacity with X number of users. With my optimization, we can cater for Y users more, before we have to get a new machine."
On the other hand, the line between optimization and over-optimization is thin. While writing code that doesn't waste resources is good craftsmanship and should be a human right, RAM and disk space are awfully cheap these days. Optimizations also tend to make code more complicated, and harder to maintain for others. When you control your own hardware, code optimization may not always be the top goal.
Do you have performance objectives for the application(s)? Free capacity, response time, bandwidth usage etc. Without them you will find it difficult to justify why an improvement needs to be made. You need to be able to quantify the problem before people will spend money on it.
If the application is already meeting the requirements then your boss is probably right.
To ensure reserve capacity for future customers you (and your boss) could set a threashold such that once performance comes within a percentage of the requirements you need to investigate the problem. This is the time for you to request/push/negociate for performing optimisations as he will be aware of the problem and the risk of doing nothing. If you can recommend some changes to correct the problem that will cost less than the hardware then hopefully he should agree to let you do it. Of course the reverse still applies. If the total cost of the hardware upgrade is cheaper then that is probably the better option.
Wait until buying RAM and CPU becomes more expensive than paying you to optimize the code. Then you have a case.
There's a break even point between improving software vs. improving hardware. For desktop systems, a good threshold is by purchase time:
If that machine fails, can you go to the next mall and buy a replacement within an hour?
As long as you can answer yes, optimization is futile - an investment into the future maybe, but is that really your decision alone?
A similar rule for web sites might be "how long would it take to get a new hosting contract on that?"
This isn't perfect, it covers just a single aspect of scalability. I like it because it's an easy to understand aspect outside of technical concerns.
Of course, you should have more material if that aspect suddenly gets brushed away. It helps to just ask what are the companies/bosses plans for a few key scenarios. - e.g. what contingency plans for DDOS attacks, for "rush events" etc. Having some data to back that up, some key stories ("company foo was mentioned on popular night show, web server broke down under requests, business lost, potential customers angered") helps a lot.
The key to realize is that (assuming from your description alone) it is your responsibility to forsee such events, and provide the technical solutions, but it's not your responsibility to mke these decisions.
Also, getting a written statement from your boss that "five hours downtime isn't a problem, get bck to work on the important things!" is a good CYA.
about the same way one would explain a developer that code/resources optimization is unimportant ...
i guess this problem arises because your way to measure importance is different than his ...
his job is to care about money and make sure he gets the "most" out of it ... and frankly, servers are cheaper than developers ... and managed servers are cheaper than admins ... and the ugly truth is, that many people think that way ... personally, I think PHP isn't really the right choice for performance-critical parts of an app ... neither are RMDBSs ... but nearly every managed server runs PHP and MySQL and business clients prefer to have an app they can run everywhere, based on a technology widely known, which turns out to be PHP and MySQL on the server side ... the world is a cruel place and the truth is ugly ... now when it comes to you, you have only 2 choices:
live with it
work with people who are more like you, and who share the same ambitions
your boss does the job right, from his perspective ... what you do is a waste of company money, because the company's goal is not to write beautiful and highly optimized code ... whatever your company does, in the end you only provide a tool ... and the value of a tool is measured by the use it provides in relation to the money it costs ...
if your optimizations were economically reasonable, then the easiest way would be not to optimize anymore and wait for the moment until your boss comes to you, asking for speedup ...
i suggest, you either look for a new job, or focus on other important things:
good design and use of best practices such as KISS, DRY, SOLID and GRASP
scalable architecture (doesn't mean you have to actually implement it, just have an idea how the whole thing could scale well)
maintainability, including readability and good documentation
flexibility & extensibility
robustness & correctness
do not reinvent the wheel and use the right tools for a job - use adequate technologies, libraries and frameworks
fast developement
these goals are important for the present and the future of a software project (also when it comes to money (especially the bold ones)) ... and they provide the possibility of doing optimization when actually needed ...
this probably isn't the answer you wanted, but I hope it helps ...
Optimizing is often really just a waste of time, what is more important is optimizing for maintainability:
- keep the code simple (see: KISS)
- move duplicate code into functions (see: DRY)
- optimize comments (as few comments as possible, as many as necessary)
- remove unused code
Those changes do not necessarily affect the speed of the program but they reduce the time needed to implement changes and fix bugs so they have real business value as they save expensive developer time.
If you're having to explain why there is a need for optimisation, then you're already on a low-win-rate path. Unfortunately, the best argument is when there is a situation where performance is becoming a noticeable problem (e.g. customers complaining) - this makes people sit up and listen if they're getting constant ear-ache about it. Often, the solution can be that throwing hardware at it is the best/cheapest solution.
However for me, performance is important, when working on highly scalable systems, you need to spend time on optimisations. It should at the very least be on your mind while you're developing and a lot of things can be swallowed up in the dev process (as opposed to after you've finished, then going back to optimise).
e.g.
- What happens if my database has 100,000,000 records instead of 100,000? (you can easily fool SQL Server into thinking there are more records in a table than there actually are to see what the effect on the execution plan would be).
If you're being pro-active about optimisation (which I personally think is good), then you need to try and come with a real-world meaning to your boss. e.g. "if we optimise our site by cutting down the page size, we could save x amount of bandwidth a month, saving us xx much money".
You do have to be careful about micro-optimisations though as you can micro-optimise until the cows come home, for much lower benefit.
You could just wait until your boss says "Why is it taking so long?" Then you could say "Hey, boss, we could buy 10 times as much hardware, or I could spend a couple days and make it 10 times faster". Here's an example.
Added: If your boss says "Well, why did you make it slow in the first place?" I would have no trouble explaining that he could hire God's Right Hand Programmer, and the code as first written would still have room for optimizing.
If you are on a relational database (and your not working with trivial applications).... you cannot afford to write bad database queries. Since you are you using a red-gate tag I assume you are on SQL server. If you design a bad schema (including queries) on SQL Server a database server when you start getting moderate traffic you will be forced to scale in horrendous ways. Once you get a high level of traffic you will be screwed -- and will need to hire a very expensive consultant/DBA to undo the mess -- use this argument with your boss :D.
What I am trying to get at is even though SQL is declarative and it doesn't appear that you have to pay attention to performance -- it doesn't really work that way. You have to design your data model by keeping in mind the way it is going to be used.
If you are writing business logic in application code ... well that doesn't matter much -- you can fix that latter with less trouble if performance becomes an issue. Most business logic these days is stateless (especially if its web-based or web-service based) meaning you can just chuck more machines at the problem -- if it's not than its just a bit harder.
Every time something takes long than it would have if the refactoring had been done ahead of time make sure your boss hears about it.
IMO, It's less a case of convincing that optimizations need to be done (and based on your Boss's responses, you're not going to win this fight), and more a case of always building in refactoring time into your estimates.
Do a cost analysis...
This will take me X hours and will mean every project needs 50% less data storage. Based on us doing 2 projects a year using on average 100Gb space, that will save $Y after a year, $Z after 3 years.
Crude example but it suffices.
Ultimately you and your boss are both wrong... you think code has to be fast (primarily) to satisfy your idealism, he doesn't care at all as he wants to deliver products.
Since I am a Lone Developer, I have to think about every aspect of the systems I am working on. Lately I've been thinking about performance of my two websites, and ways to improve it. Sites like StackOverflow proclaim, "performance is a feature." However, "premature optimization is the root of all evil," and none of my customers have complained yet about the sites' performance.
My question is, is performance always important? Should performance always be a feature?
Note: I don't think this question is the same as this one, as that poster is asking when to consider performance and I am asking if the answer to that question is always, and if so, why. I also don't think this question should be CW, as I believe there is an answer and reasoning for that answer.
Adequate performance is always important.
Absolute fastest possible performance is almost never important.
It's always worth keeping an eye on performance and being aware of anything outrageously non-optimal that you're doing (particularly at a design/architecture level) but that's not the same as micro-optimising every line of code.
Performance != Optimization.
Performance is a feature indeed, but premature optimization will cost you time and will not yield the same result as when you optimize the parts that need optimization. And you can't really know which parts need optimization until you can actually profile something.
Performance is the feature that your clients will not tell you about if it's missing, unless it's really painfully slow and they're forced to use your product. Existing customers may report it in the end, but new customers will simply not bother if the performance is required.
You need to know what performance you need, and formulate it as a requirement. Then, you have to meet your own requirement.
That 'root of all evil' quote is almost always misused and misunderstood.
Designing your application to perform well can be mostly be done with just good design. Good design != premature optimization, and it's utterly ridiculous to go off writing crap code and blowing off doing a better job on the design as an 'evil' waste. Now, I'm not specifically talking about you here... but I see people do this a lot.
It usually saves you time to do a good job on the design. If you emphasize that, you'll get better at it... and get faster and faster at writing systems that perform well from the start.
Understanding what kinds of structures and access methods work best in certain situations is key here.
Sure, if you're app becomes truly massive or has insane speed requirements you may find yourself doing tricked out optimizations that make your code uglier or harder to maintain... and it would be wrong to do those things before you need to.
But that is absolutely NOT the same thing as making an effort to understand and use the right algorithms or data patterns or whatever in the first place.
Your users are probably not going to complain about bad performance if it's bearable. They possibly wouldn't even know it could be faster. Reacting to complaints as a primary driver is a bad way to operate. Sure, you need to address complaints you receive... but a lack of them does not mean there isn't a problem. The fact that you are considering improving performance is a bit of an indicator right there. Was it just a whim, or is some part of you telling you it should be better? Why did you consider improving it?
Just don't go crazy doing unnecessary stuff.
Keep performance in mind but given your situation it would be unwise to spend too much time up front on it.
Performance is important but it's often hard to know where your bottleneck will be. Therefore I'd suggest planning to dedicate some time to this feature once you've got something to work with.
Thus you need to set up metrics that are important to your clients and you. Keep and analyse these measurements. Then estimate how long and how much each would take to implement. Now you can aim on getting as much bang for you buck/time.
If it's web it would be wise to note your page size and performance using Firebug + yslow and/or google page speed. Again, know what applies to a small site like yours and things that only apply to yahoo and google.
Jackson’s Rules of Optimization:
Rule 1. Don’t do it.
Rule 2 (for experts only). Don’t do it
yet— that is, not until you have a
perfectly clear and unoptimized
solution.
—M. A. Jackson
Extracted from Code Complete 2nd edition.
To give a generalized answer to a general question:
First make it work, then make it right, then make it fast.
http://c2.com/cgi/wiki?MakeItWorkMakeItRightMakeItFast
This puts a more constructive perspective on "premature optimization is the root of all evil".
So to parallel Jon Skeet's answer, adequate performance (as part of making something work, and making it right) is always important. Even then it can often be addressed after other functionality.
Jon Skeets 'adequate' nails it, with the additional provision that for a library you don't know yet what's adequate, so it's better to err on the safe side.
It is one of the many stakes you must not get wrong, but the quality of your app is largely determined by the weakest link.
Performance is definitely always important in a certain sense - maybe not the one you mean: namely in all phases of development.
In Big O notation, what's inside the parantheses is largely decided by design - both components isolation and data storage. Choice of algorithm will usually only best/worst case behavior (unless you start with decidedly substandard algorithms). Code optimizations will mostly affect the constant factor - which shouldn't be neglected, either.
But that's true for all aspects of code: in any stage, you have a good chance to fail any aspect - stability, maintainability, compatibility etc. Performance needs to be balanced, so that no aspect is left behind.
In most applications 90% or more of execution time is spend in 10% or less of the code. Usually there is little use in optimizing other code than these 10%.
performance is only important to the extent that developing the performance improvement takes less time than the total amount of time that will be saved for the user(s).
the result is that if you're developing something for millions... yeah it's important to save them time. if you're coding up a tool for your own use... it might be more trouble than it's worth to save a minute or even an hour or more.
(this is clearly not a rule set in stone... there are times when performance is truly critical no matter how much development time it takes)
There should be a balance to everything. Cost (or time to develop) vs Performance for instance. More performance = more cost. If a requirement of the system being built is high performance then the cost should not matter, but if cost is a factor then you optimize within reason. After a while, your return on investment suffers in that more performance does not bring in more returns.
The importance of performance is IMHO highly correlated to your problem set. If you are creating a site with an expectation of a heavy load and lot of server side processing, then you might want to put some more time into performance (otherwise your site might end up being unusable). However, for most applications the the time put into optimizing your perfomance on a website is not going to pay off - users won't notice the difference.
So I guess it breaks down to this:
Will users notice the improvements?
How does this improvement compare to competing sites?
If users will notice AND the improvement would be enough to differentiate you from the competition - performance is an important feature - otherwise not so much. (To a point - I don't recommend ignoring it entirely - you don't want your site to turtle along after all).
No. Fast enough is generally good enough.
It's not necessarily true, however, that your client's ideas about "fast enough" should trump your own. If you think it's fast enough and your client doesn't then yes, you need to accommodate your ideas to theirs. But if you're client thinks it's fast enough and you don't you should seriously consider going with your opinion, no theirs (since you may be more knowledgeable about performance standards in the wider world).
How important performance is depends largely and foremost on what you do.
For example, if you write a library that can be used in any environment, this can hardly ever have too much performance. In some environments, a 10% performance advantage can be a major feature for a library.
If you, OTOH, write an application, there's always a point where it is fast enough. Users won't neither realize nor care whether a button pressed reacts within 0.05 or 0.2 seconds - even though that's a factor of 4.
However, it is always easier to get working code faster, than it is to get fast code working.
No. Performance is not important.
Lack of performance is important.
Performance is something to be designed in from the outset, not tacked on at the end. For the past 15 years I have been working in the performance engineering space and the cause of most project failures that I work on is a lack of requirements on performance. A couple of posts have noted "fast enough" as an observation and whether your expectation matches that of your clients, but what about when you have a situation of your client, your architectural team, your platform engineering team, your functional test team, your performance test team and your operations team all have different expectations on performance, none of which have been committed to stone and measured against. Bad Magic to be certain.
Capture those expectations on the part of your clients. Commit them to a specific, objective, measurable requirement that you can evaluate at each stage of production of your software. Expectations may not be uniform, with one section of your app/code needing to be faster than others, nor will each customer have the same expectations on what is considered acceptable. Having this information will force you to confront decisions in the design and implementation that you may have overlooked in the past and it will result in a product which is a better match to your clients expectations.
Closed. This question does not meet Stack Overflow guidelines. It is not currently accepting answers.
This question does not appear to be about programming within the scope defined in the help center.
Closed 5 years ago.
Improve this question
If so why? How much?
I tend to inflate mine a little because I can be overly optimistic.
Hofstadter's Law: Any computing project will take twice as long as you think it will — even when you take into account Hofstadter's Law.
If you inflate your estimate based on past experiences to try and compensate for your inherent optimism, then you aren't inflating. You are trying to provide an accurate estimate. If however you inflate so that you will always have fluff time, that's not so good.
Oh yes, I've learnt to always multiply my initial estimation by two. That's why FogBUGZ's Evidence-Based Scheduling tool is so really useful.
Any organization that asks its programmers to estimate time for coarse-grained features is fundamentally broken.
Steps to unbreak:
Hire technical program managers. Developers can double as these folks if needed.
Put any feature request, change request, or bug into a database immediately when it comes in. (My org uses Trac, which doesn't completely suck.)
Have your PMs break those requests into steps that each take a week or less.
At a weekly meeting, your PMs decide which tickets they want done that week (possibly with input from marketing, etc.). They assign those tickets to developers.
Developers finish as many of their assigned tickets as possible. And/or, they argue with the PMs about tasks they think are longer than a week in duration. Tickets are adjusted, split, reassigned, etc., as necessary.
Code gets written and checked in every week. QA always has something to do. The highest priority changes get done first. Marketing knows exactly what's coming down the pipe, and when. And ultimately:
Your company falls on the right side of the 20% success rate for software projects.
It's not rocket science. The key is step 3. If marketing wants something that seems complicated, your PMs (with developer input) figure out what the first step is that will take less than a week. If the PMs are not technical, all is lost.
Drawbacks to this approach:
When marketing asks, "how long will it take to get [X]?", they don't get an estimate. But we all know, and so do they, that the estimates they got before were pure fiction. At least now they can see proof, every week, that [X] is being worked on.
We, as developers, have fewer options for what we work on each week. This is indubitably true. Two points, though: first, good teams involve the developers in the decisions about what tickets will be assigned. Second, IMO, this actually makes my life better.
Nothing is as disheartening as realizing at the 1-month mark that the 2-month estimate I gave is hopelessly inadequate, but can't be changed, because it's already in the official marketing literature. Either I piss off the higher-ups by changing my estimate, risking a bad review and/or missing my bonus, or I do a lot of unpaid overtime. I've realized that a lot of overtime is not the mark of a bad developer, or the mark of a "passionate" one - it's the product of a toxic culture.
And yeah, a lot of this stuff is covered under (variously) XP, "agile," SCRUM, etc., but it's not really that complicated. You don't need a book or a consultant to do it. You just need the corporate will.
The Scotty Rule:
make your best guess
round up to the nearest whole number
double that quadruple that (thanks Adam!)
increase to the next higher unit of measure
Example:
you think it will take 3.5 hours
round that to 4 hours
quadruple that to 16 hours
shift it up to 16 days
Ta-daa! You're a miracle worker when you get it done in less than 8 days.
Typically yes, but I have two strategies:
Always provide estimates as a range (i.e. 1d-2d) rather than a single number. The difference between the numbers tells the project manager something about your confidence, and allows them to plan better.
Use something like FogBugz' Evidence Based-Scheduling, or a personal spreadsheet, to compare your historical estimates to the time you actually took. That'll give you a better idea than always doubling. Not least because doubling might not be enough!
I'll be able to answer this in 3-6 weeks.
It's not called "inflating" — it's called "making them remotely realistic."
Take whatever estimate you think appropriate. Then double it.
Don't forget you (an engineer) actually estimate in ideal hours (scrum term).
While management work in real hours.
The difference being that ideal hours are time without interuption (with a 30 minute warm up after each interuption). Ideal hours don't include time in meetings, time for lunch or normal chit chat etc.
Take all these into consideration and ideal hours will tend towards real hours.
Example:
Estimated time 40 hours (ideal)
Management will assume that is 1 week real time.
If you convert that 40 hours to real time:
Assume one meeting per day (duration 1 hour)
one break for lunch per day (1 hour)
plus 20% overhead for chit chat bathroom breaks getting coffie etc.
8 hour day is now 5 hours work time (8 - meeting - lunch - warm up).
Times 80% effeciency = 4 hours ideal time per day.
This your 40 hour ideal will take 80 hours real time to finish.
Kirk : Mr. Scott, have you always multiplied your repair estimates by a factor of four?
Scotty : Certainly, sir. How else can I keep my reputation as a miracle worker?
A good rule of thumb is estimate how long it will take and add 1/2 again as much time to cover the following problems:
The requirements will change
You will get pulled onto another project for a quick fix
The New guy at the next desk will need help with something
The time needed to refactor parts of the project because you found a better way to do things
<sneaky> Instead of inflating your project's estimate, inflate each task individually. It's harder for your superiors to challenge your estimates this way, because who's going to argue with you over minutes.
</sneaky>
But seriously, through using EBS I found that people are usually much better at estimating small tasks than large ones. If you estimate your project at 4 months, it could very well be 7 month before it's done; or it might not. If your estimate of a task is 35 minutes, on the other hand, it's usually about right.
FogBugz's EBS system shows you a graph of your estimation history, and from my experience (looking at other people's graphs as well) people are indeed much better at estimating short tasks. So my suggestion is to switch from doing voodoo multiplication of your projects as totals, and start breaking them down upfront into lots of very small tasks that you're much better at estimating.
Then multiply the whole thing by 3.14.
A lot depends on how detailed you want to get - but additional 'buffer' time should be based on a risk assessment - at a task level, where you put in various buffer times for:
High Risk: 50% to 100%
Medium Risk: 25% to 50%
Low Risk: 10% to 25% (all dependent on prior project experience).
Risk areas include:
est. of requirement coverage (#1 risk area is missing components at the design and requirement levels)
knowledge of technology being used
knowledge/confidence in your resources
external factors such as other projects impacting yours, resource changes, etc.
So, for a given task (or group of tasks) that cover component A, initial est. is 5 days and it's considered a high risk based on requirements coverage - you could add between 50% to 100%
Six weeks.
Industry standard: every request will take six weeks. Some will be longer, some will be shorter, everything averages out in the end.
Also, if you wait long enough, it no longer becomes an issue. I can't tell you how many times I've gone through that firedrill only to have the project/feature cut.
I wouldn't say I inflate them, so much as I try to set more realistic expectations based on past experience.
You can calculate project durations in two ways - one is to work out all the tasks involved and figure out how long each will take, factor in delays, meetings, problems etc. This figure always looks woefully short, which is why people always say things like 'double it'. After some experience in delivering projects you'll be able to tell very quickly, just by looking briefly at a spec how long it will take, and, invariably, it will be double the figure arrived at by the first method...
It's a better idea to add specific buffer time for things like debugging and testing than to just inflate the total time. Also, by taking the time up front to really plan out the pieces of the work, you'll make the estimation itself much easier (and probably the coding, too).
If anything, make a point of recording all of your estimates and comparing them to actual completion time, to get a sense of how much you tend to underestimate and under what conditions. This way you can more accurately "inflate".
I wouldn't say I inflate them but I do like to use a template for all possible tasks that could be involved in the project.
You find that not all tasks in your list are applicable to all projects, but having a list means that I don't let any tasks slip through the cracks with me forgetting to allow some time for them.
As you find new tasks are necessary, add them to your list.
This way you'll have a realistic estimate.
I tend to be optimistic in what's achievable and so I tend to estimate on the low side. But I know that about my self so I tend to add on an extra 15-20%.
I also keep track of my actuals versus my estimates. And make sure the time involved does not include other interruptions, see the accepted answer for my SO question on how to get back in the flow.
HTH
cheers
I wouldn't call additional estimated time on a project "inflated" unless you actually do complete your projects well before your original estimation. If you make a habit of always completing the project well before your original estimated time, then project leaders will get wise and expect it earlier.
What are your estimates based on?
If they're based on nothing but a vague intuition of how much code it would require and how long it would take to write that code, then you better pad them a LOT to account for subtasks you didn't think of, communication and synchronization overhead, and unexpected problems. Of course, that kind o estimate is nearly worthless anyway.
OTOH, if your estimates are based on concrete knowledge of how long it took last time to do a task of that scope with the given technology and number of developers, then inflation should not be necessary, since the inflationary factors above should already be included in the past experiences. Of course there will be probably new factors whose influence on the current project you can't foresee - such risks justify a certain amount of additional padding.
This is part of the reason why Agile teams estimate tasks in story points (an arbitrary and relative measurement unit), then as the project progresses track the team's velocity (story points completed per day). With this data you can then theoretically compute your completion date with accuracy.
I take my worst case scenario, double it, and it's still not enough.
Under-promise, over-deliver.
Oh yes, the general rule from long hard experience is give the project your best estimate for time, double it, and that's about how long it will actually take!
We have to, because our idiot manager always reduces them without any justification whatever. Of course, as soon as he realizes we do this, we're stuck in an arms race...
I fully expect to be the first person to submit a two-year estimate to change the wording of a dialog.
sigh.
As a lot said, it's a delicate balance between experience and risk.
Always start by breaking down the project in manageable pieces, in fact, in pieces you can easily imagine yourself starting and finishing in the same day
When you don't know how to do something (like when it's the first time) the risk goes up
When your risk goes up, that's where you start with your best guess, then double it to cover some of the unexpected, but remember, you are doing that on a small piece of the project, not the whole project itself
The risk goes up also when there's a factor you don't control, like the quality of an input or that library that seems it can do everything you want but that you never tested
Of course, when you gain experience on a specific task (like connecting your models to the database), the risk goes down
Sum everything up to get your subtotal...
Then, on the whole project, always add about another 20-30% (that number will change depending on your company) for all the answers/documents/okays you will be waiting for, meetings we are always forgetting, the changes of idea during the project and so on... that's what we call the human/political factor
And again add another 30-40% that accounts for tests and corrections that goes out of the tests you usually do yourself... such as when you'll first show it to your boss or to the customer
Of course, if you look at all this, it ends up that you can simplify it with the magical "double it" formulae but the difference is that you'll be able to know what you can squeeze in a tight deadline, what you can commit to, what are the dangerous tasks, how to build your schedule with the important milestones and so on.
I'm pretty sure that if you note the time spent on each pure "coding" task and compare it to your estimations in relation to its riskiness, you won't be so far off. The thing is, it's not easy to think of all the small pieces ahead and be realistic (versus optimistic) on what you can do without any hurdle.
I say when I can get it done. I make sure that change requests are followed-up with a new estimation and not the "Yes, I can do that." without mentioning it will take more time. The person requesting the change will not assume it will take longer.
Of course, you'd have be to an idiot not to add 25-50%
The problem is when the idiot next to you keeps coming up with estimates which are 25-50% lower than yours and the PM thinks you are stupid/slow/swinging it.
(Has anyone else noticed project managers never seem to compare estimates with actuals?)
I always double my estimates, for the following reasons:
1) Buffer for Murphy's Law. Something's always gonna go wrong somewhere that you can't account for.
2) Underestimation. Programmers always think things are easy to do. "Oh yeah, it'll take just a few days."
3) Bargaining space. Upper Management always thinks that schedules can be shortened. "Just make the developers work harder!" This allows you to give them what they want. Of course, overuse of this (more than once) will train them to assume you're always overestimating.
Note: It's always best to put buffer at the end of the project schedule, and not for each task. And never tell developers that the buffer exists, otherwise Parkinson's Law (Work expands so as to fill the time available for its completion) will take effect instead. Sometimes I do tell Upper Management that the buffer exists, but obviously I don't give them reason #3 as justification. This, of course depends on how much your boss trusts you to be truthful.
It's difficult to tell what is being asked here. This question is ambiguous, vague, incomplete, overly broad, or rhetorical and cannot be reasonably answered in its current form. For help clarifying this question so that it can be reopened, visit the help center.
Closed 10 years ago.
If something is making a single-thread program take, say, 10 times as long as it should, you could run a profiler on it. You could also just halt it with a "pause" button, and you'll see exactly what it's doing.
Even if it's only 10% slower than it should be, if you halt it more times, before long you'll see it repeatedly doing the unnecessary thing. Usually the problem is a function call somewhere in the middle of the stack that isn't really needed. This doesn't measure the problem, but it sure does find it.
Edit: The objections mostly assume that you only take 1 sample. If you're serious, take 10. Any line of code causing some percentage of wastage, like 40%, will appear on the stack on that fraction of samples, on average. Bottlenecks (in single-thread code) can't hide from it.
EDIT: To show what I mean, many objections are of the form "there aren't enough samples, so what you see could be entirely spurious" - vague ideas about chance. But if something of any recognizable description, not just being in a routine or the routine being active, is in effect for 30% of the time, then the probability of seeing it on any given sample is 30%.
Then suppose only 10 samples are taken. The number of times the problem will be seen in 10 samples follows a binomial distribution, and the probability of seeing it 0 times is .028. The probability of seeing it 1 time is .121. For 2 times, the probability is .233, and for 3 times it is .267, after which it falls off. Since the probability of seeing it less than two times is .028 + .121 = .139, that means the probability of seeing it two or more times is 1 - .139 = .861. The general rule is if you see something you could fix on two or more samples, it is worth fixing.
In this case, the chance of seeing it in 10 samples is 86%. If you're in the 14% who don't see it, just take more samples until you do. (If the number of samples is increased to 20, the chance of seeing it two or more times increases to more than 99%.) So it hasn't been precisely measured, but it has been precisely found, and it's important to understand that it could easily be something that a profiler could not actually find, such as something involving the state of the data, not the program counter.
On Java servers it's always been a neat trick to do 2-3 quick Ctrl-Breakss in a row and get 2-3 threaddumps of all running threads. Simply looking at where all the threads "are" may extremely quickly pinpoint where your performance problems are.
This technique can reveal more performance problems in 2 minutes than any other technique I know of.
Because sometimes it works, and sometimes it gives you completely wrong answers. A profiler has a far better record of finding the right answer, and it usually gets there faster.
Doing this manually can't really be called "quick" or "effective", but there are several profiling tools which do this automatically; also known as statistical profiling.
Callstack sampling is a very useful technique for profiling, especially when looking at a large, complicated codebase that could be spending its time in any number of places. It has the advantage of measuring the CPU's usage by wall-clock time, which is what matters for interactivity, and getting callstacks with each sample lets you see why a function is being called. I use it a lot, but I use automated tools for it, such as Luke Stackwalker and OProfile and various hardware-vendor-supplied things.
The reason I prefer automated tools over manual sampling for the work I do is statistical power. Grabbing ten samples by hand is fine when you've got one function taking up 40% of runtime, because on average you'll get four samples in it, and always at least one. But you need more samples when you have a flat profile, with hundreds of leaf functions, none taking more than 1.5% of the runtime.
Say you have a lake with many different kinds of fish. If 40% of the fish in the lake are salmon (and 60% "everything else"), then you only need to catch ten fish to know there's a lot of salmon in the lake. But if you have hundreds of different species of fish, and each species is individually no more than 1%, you'll need to catch a lot more than ten fish to be able to say "this lake is 0.8% salmon and 0.6% trout."
Similarly in the games I work on, there are several major systems each of which call dozens of functions in hundreds of different entities, and all of this happens 60 times a second. Some of those functions' time funnels into common operations (like malloc), but most of it doesn't, and in any case there's no single leaf that occupies more than 1000 μs per frame.
I can look at the trunk functions and see, "we're spending 10% of our time on collision", but that's not very helpful: I need to know exactly where in collision, so I know which functions to squeeze. Just "do less collision" only gets you so far, especially when it means throwing out features. I'd rather know "we're spending an average 600 μs/frame on cache misses in the narrow phase of the octree because the magic missile moves so fast and touches lots of cells," because then I can track down the exact fix: either a better tree, or slower missiles.
Manual sampling would be fine if there were a big 20% lump in, say, stricmp, but with our profiles that's not the case. Instead I have hundreds of functions that I need to get from, say, 0.6% of frame to 0.4% of frame. I need to shave 10 μs off every 50 μs function that is called 300 times per second. To get that kind of precision, I need more samples.
But at heart what Luke Stackwalker does is what you describe: every millisecond or so, it halts the program and records the callstack (including the precise instruction and line number of the IP). Some programs just need tens of thousands of samples to be usefully profiled.
(We've talked about this before, of course, but I figured this was a good place to summarize the debate.)
There's a difference between things that programmers actually do, and things that they recommend others do.
I know of lots of programmers (myself included) that actually use this method. It only really helps to find the most obvious of performance problems, but it's quick and dirty and it works.
But I wouldn't really tell other programmers to do it, because it would take me too long to explain all the caveats. It's far too easy to make an inaccurate conclusion based on this method, and there are many areas where it just doesn't work at all. (for example, that method doesn't reveal any code that is triggered by user input).
So just like using lie detectors in court, or the "goto" statement, we just don't recommend that you do it, even though they all have their uses.
I'm surprised by the religous tone on both sides.
Profiling is great, and certainly is a more refined and precise when you can do it. Sometimes you can't, and it's nice to have a trusty back-up. The pause technique is like the manual screwdriver you use when your power tool is too far away or the bateries have run-down.
Here is a short true story. An application (kind of a batch proccessing task) had been running fine in production for six months, suddenly the operators are calling developers because it is going "too slow". They aren't going to let us attach a sampling profiler in production! You have to work with the tools already installed. Without stopping the production process, just using Process Explorer, (which operators had already installed on the machine) we could see a snapshot of a thread's stack. You can glance at the top of the stack, dismiss it with the enter key and get another snapshot with another mouse click. You can easily get a sample every second or so.
It doesn't take long to see if the top of the stack is most often in the database client library DLL (waiting on the database), or in another system DLL (waiting for a system operation), or actually in some method of the application itself. In this case, if I remember right, we quickly noticed that 8 times out of 10 the application was in a system DLL file call reading or writing a network file. Sure enough recent "upgrades" had changed the performance characteristics of a file share. Without a quick and dirty and (system administrator sanctioned) approach to see what the application was doing in production, we would have spent far more time trying to measure the issue, than correcting the issue.
On the other hand, when performance requirements move beyond "good enough" to really pushing the envelope, a profiler becomes essential so that you can try to shave cycles from all of your closely-tied top-ten or twenty hot spots. Even if you are just trying to hold to a moderate performance requirement durring a project, when you can get the right tools lined-up to help you measure and test, and even get them integrated into your automated test process it can be fantasticly helpful.
But when the power is out (so to speak) and the batteries are dead, it's nice know how to use that manual screwdriver.
So the direct answer: Know what you can learn from halting the program, but don't be afraid of precision tools either. Most importantly know which jobs call for which tools.
Hitting the pause button during the execution of a program in "debug" mode might not provide the right data to perform any performance optimizations. To put it bluntly, it is a crude form of profiling.
If you must avoid using a profiler, a better bet is to use a logger, and then apply a slowdown factor to "guesstimate" where the real problem is. Profilers however, are better tools for guesstimating.
The reason why hitting the pause button in debug mode, may not give a real picture of application behavior is because debuggers introduce additional executable code that can slowdown certain parts of the application. One can refer to Mike Stall's blog post on possible reasons for application slowdown in a debugging environment. The post sheds light on certain reasons like too many breakpoints,creation of exception objects, unoptimized code etc. The part about unoptimized code is important - the "debug" mode will result in a lot of optimizations (usually code in-lining and re-ordering) being thrown out of the window, to enable the debug host (the process running your code) and the IDE to synchronize code execution. Therefore, hitting pause repeatedly in "debug" mode might be a bad idea.
If we take the question "Why isn't it better known?" then the answer is going to be subjective. Presumably the reason why it is not better known is because profiling provides a long term solution rather than a current problem solution. It isn't effective for multi-threaded applications and isn't effective for applications like games which spend a significant portion of its time rendering.
Furthermore, in single threaded applications if you have a method that you expect to consume the most run time, and you want to reduce the run-time of all other methods then it is going to be harder to determine which secondary methods to focus your efforts upon first.
Your process for profiling is an acceptable method that can and does work, but profiling provides you with more information and has the benefit of showing you more detailed performance improvements and regressions.
If you have well instrumented code then you can examine more than just the how long a particular method; you can see all the methods.
With profiling:
You can then rerun your scenario after each change to determine the degree of performance improvement/regression.
You can profile the code on different hardware configurations to determine if your production hardware is going to be sufficient.
You can profile the code under load and stress testing scenarios to determine how the volume of information impacts performance
You can make it easier for junior developers to visualise the impacts of their changes to your code because they can re-profile the code in six months time while you're off at the beach or the pub, or both. Beach-pub, ftw.
Profiling is given more weight because enterprise code should always have some degree of profiling because of the benefits it gives to the organisation of an extended period of time. The more important the code the more profiling and testing you do.
Your approach is valid and is another item is the toolbox of the developer. It just gets outweighed by profiling.
Sampling profilers are only useful when
You are monitoring a runtime with a small number of threads. Preferably one.
The call stack depth of each thread is relatively small (to reduce the incredible overhead in collecting a sample).
You are only concerned about wall clock time and not other meters or resource bottlenecks.
You have not instrumented the code for management and monitoring purposes (hence the stack dump requests)
You mistakenly believe removing a stack frame is an effective performance improvement strategy whether the inherent costs (excluding callees) are practically zero or not
You can't be bothered to learn how to apply software performance engineering day-to-day in your job
....
Stack trace snapshots only allow you to see stroboscopic x-rays of your application. You may require more accumulated knowledge which a profiler may give you.
The trick is knowing your tools well and choose the best for the job at hand.
These must be some trivial examples that you are working with to get useful results with your method. I can't think of a project where profiling was useful (by whatever method) that would have gotten decent results with your "quick and effective" method. The time it takes to start and stop some applications already puts your assertion of "quick" in question.
Again, with non-trivial programs the method you advocate is useless.
EDIT:
Regarding "why isn't it better known"?
In my experience code reviews avoid poor quality code and algorithms, and profiling would find these as well. If you wish to continue with your method that is great - but I think for most of the professional community this is so far down on the list of things to try that it will never get positive reinforcement as a good use of time.
It appears to be quite inaccurate with small sample sets and to get large sample sets would take lots of time that would have been better spent with other useful activities.
What if the program is in production and being used at the same time by paying clients or colleagues. A profiler allows you to observe without interferring (as much, because of course it will have a little hit too as per the Heisenberg principle).
Profiling can also give you much richer and more detailed accurate reports. This will be quicker in the long run.
EDIT 2008/11/25: OK, Vineet's response has finally made me see what the issue is here. Better late than never.
Somehow the idea got loose in the land that performance problems are found by measuring performance. That is confusing means with ends. Somehow I avoided this by single-stepping entire programs long ago. I did not berate myself for slowing it down to human speed. I was trying to see if it was doing wrong or unnecessary things. That's how to make software fast - find and remove unnecessary operations.
Nobody has the patience for single-stepping these days, but the next best thing is to pick a number of cycles at random and ask what their reasons are. (That's what the call stack can often tell you.) If a good percentage of them don't have good reasons, you can do something about it.
It's harder these days, what with threading and asynchrony, but that's how I tune software - by finding unnecessary cycles. Not by seeing how fast it is - I do that at the end.
Here's why sampling the call stack cannot give a wrong answer, and why not many samples are needed.
During the interval of interest, when the program is taking more time than you would like, the call stack exists continuously, even when you're not sampling it.
If an instruction I is on the call stack for fraction P(I) of that time, removing it from the program, if you could, would save exactly that much. If this isn't obvious, give it a bit of thought.
If the instruction shows up on M = 2 or more samples, out of N, its P(I) is approximately M/N, and is definitely significant.
The only way you can fail to see the instruction is to magically time all your samples for when the instruction is not on the call stack. The simple fact that it is present for a fraction of the time is what exposes it to your probes.
So the process of performance tuning is a simple matter of picking off instructions (mostly function call instructions) that raise their heads by turning up on multiple samples of the call stack. Those are the tall trees in the forest.
Notice that we don't have to care about the call graph, or how long functions take, or how many times they are called, or recursion.
I'm against obfuscation, not against profilers. They give you lots of statistics, but most don't give P(I), and most users don't realize that that's what matters.
You can talk about forests and trees, but for any performance problem that you can fix by modifying code, you need to modify instructions, specifically instructions with high P(I). So you need to know where those are, preferably without playing Sherlock Holmes. Stack sampling tells you exactly where they are.
This technique is harder to employ in multi-thread, event-driven, or systems in production. That's where profilers, if they would report P(I), could really help.
Stepping through code is great for seeing the nitty-gritty details and troubleshooting algorithms. It's like looking at a tree really up close and following each vein of bark and branch individually.
Profiling lets you see the big picture, and quickly identify trouble points -- like taking a step backwards and looking at the whole forest and noticing the tallest trees. By sorting your function calls by length of execution time, you can quickly identify the areas that are the trouble points.
I used this method for Commodore 64 BASIC many years ago. It is surprising how well it works.
I've typically used it on real-time programs that were overrunning their timeslice. You can't manually stop and restart code that has to run 60 times every second.
I've also used it to track down the bottleneck in a compiler I had written. You wouldn't want to try to break such a program manually, because you really have no way of knowing if you are breaking at the spot where the bottlenck is, or just at the spot after the bottleneck when the OS is allowed back in to stop it. Also, what if the major bottleneck is something you can't do anything about, but you'd like to get rid of all the other largeish bottlenecks in the system? How to you prioritize which bottlenecks to attack first, when you don't have good data on where they all are, and what their relative impact each is?
The larger your program gets, the more useful a profiler will be. If you need to optimize a program which contains thousands of conditional branches, a profiler can be indispensible. Feed in your largest sample of test data, and when it's done import the profiling data into Excel. Then you check your assumptions about likely hot spots against the actual data. There are always surprises.