I have a disconnected bipartite undirected graph. I want to completely disconnect the graph. Only operation that I can perform is to remove a node. Removing a node will automatically delete its edges. Task is to minimize the number of nodes to be removed. Each node in the graph has atmost 4 edges.
By completely disconnecting a graph, I mean that no two nodes should be connected through a link. Basically an empty edge set.
I think, you cannot prove your algorithm is optimal because, in fact, it is not optimal.
To completely disconnect your graph minimizing the number of nodes to be removed, you have to remove all the nodes belonging to the minimal vertex cover of your graph. Searching the minimal vertex cover is usually NP-complete, but for bipartite graphs there is a polynomial-time solution.
Find maximum matching in the graph (probably with Hopcroft–Karp algorithm). Then use König's theorem to get the minimal vertex cover:
Consider a bipartite graph where the vertices are partitioned into left (L) and right (R) sets. Suppose there is a maximum matching which partitions the edges into those used in the matching (E_m) and those not (E_0). Let T consist of all unmatched vertices from L, as well as all vertices reachable from those by going left-to-right along edges from E_0 and right-to-left along edges from E_m. This essentially means that for each unmatched vertex in L, we add into T all vertices that occur in a path alternating between edges from E_0 and E_m.
Then (L \ T) OR (R AND T) is a minimum vertex cover.
Here's a counter-example to your suggested algorithm.
The best solution is to remove both nodes A and B, even though they are different colors.
Since all the edges are from one set to another, find these two sets using say BFS and coloring using 2 colours. Then remove the nodes in smaller set.
Since there are no edges among themselves the rest of the nodes are disconnected as well.
[As a pre-processing step you can leave out nodes with 0 edges first.]
I have thought of an algorithm for it but am not able to prove if its optimal.
My algorithm: On each disconnected subgraph, I run a BFS and color it accordingly. Then I identify the number of nodes colored with each color and take the minimum of the two and store. I repeat the procedure for each subgraph and add up to get the required minimum. Help me prove the algorithm if it's correct.
EDIT: The above algorithm is not optimal. The accepted answer has been verified to be correct.
Related
I'm tackling an interesting question in programming. It is this: we keep adding undirected edges to a graph, until the graph (or subgraph) is connected (i.e. we can use some path to get from each vertex to any other vertex in that subgraph). We stop as soon as the graph is connected.
For example if we have vertices 1,2,3 and 4 and we want the subgraph 1,2,3 to be connected.
Let's say we have edges (3,4), then (2,3), then (1,4), then (1,3). We only need to add in the first 3 edges for the subgraph to be connected, then we stop (edge 1,3 isn't needed).
Obviously I can run a BFS every time an edge is added to see if we can reach the required vertices, but if there are say m edges then we would potentially have to run BFS m times which seems too slow. Any better options? Thanks.
You should research the marvelous "Disjoint-set data structure" and the corresponding union - find algorithm. It can seem magical, but the worst case time and space complexity are tiny, O(α(n)) and O(n) respectively, where α is the inverse Ackerman function.
You can run just one time the BFS to find connected components. Then, each time you add an edge, if it is between vertices of two different components, you can merge them by a reference. So, the complexity of this algorithm is |V| + |E|.
Notice that the implementation of this method should be done by some reference techniques, especially to update the component number of the vertices.
I would normally do this using a disjoint set structure, as Doug suggests. It would be like Kruskal's algorithm for finding the minimum spanning tree, except you process edges in the given order.
If you don't need a spanning tree as output, though, then you can do this with an incremental BFS or DFS:
Pick any vertex, and find the vertices connected to it with BFS or DFS. Color these vertices red. If you start with no edges, of course, then there will be only one red vertex at this stage.
As you add edges, don't do anything else until you add an edge that connects a red vertex to a non-red vertex. Then run BFS or DFS, excluding the new edge, to find all the new vertices that will connect to the red set. Color them all red.
Stop when all vertices are red.
This is a little simpler in practice than using disjoint set, and takes O(|V|+|E|) time, since each vertex will be traversed by exactly one BFS/DFS search.
It does the work in chunks, though, so if you need each edge test to be fast individually, then disjoint set is better.
I have an undirected, weighted graph given with n nodes and m edges. In this graph it is possible to start at a node and visit all other nodes exactly once and return to the starting node (this may be not important). I need to pick n / 2 (n is even) edges such that every node is connected by only one edge and the sum of edges is minimal possible. One more thing should be satisfied, edges should not intersect between themselves.
I've tried brute force and it's too slow. I am not very familiar with graph theory, so maybe there exists some algorithm for this. What I'm looking for is a hint (or web link) to the algorithm that solves this problem.
I just started reading graph theory and was reading about graph coloring. This problem popped in my mind:
We have to color our undirected graph(not completely) with only 1 color so that number of colored nodes are maximized. We need to find this maximum number. I was able to formulate an approach for non cyclic graphs :
My approach : First we divide graph into isolated components and do this for each component. We make a dfs tree and make 2 dp arrays while traversing it so that root comes last :
dp[0][u]=sum(dp[1][visited children])
dp[1][u]=sum(dp[0][visited children])
ans=max(dp[1][root],dp[0][root])
dp[0][i] , dp[1][i] are initialized to 0,1 respectively.
Here 0 signifies uncolored and 1 signifies colored.
But this does not work for cyclic graphs as I have assumed that no visited children are connected.
Can someone guide me in the right direction on how to solve this problem for cyclic graphs(not by brute force)? Is it possible to modify my approach or do we need to come up with a different approach? Would a greedy approach like coloring a nodes with least edges work?
This problem is NP-Hard as well, and is known as maximum independent set problem.
A set S<=V is said to be Independent Set in a graph if for each two vertices u,v in S, there is no edge (u,v).
The maximum size of S (which is the number you are seeking) is called the independence number of the graph, and unfortunately finding it is NP-Hard.
So, unless P=NP, your algorithm fails for general purposes graphs.
Proving it is fairly simple, given a graph G=(V,E), create the complementary graph G'=(V,E') where (u,v) is in E' if and only if (u,v) is NOT in E.
Now, given a graph G, there is a clique of size k if and only if there is an independent set of size k in G', using the same vertices (since if (u,v) are two vertices the independent set, there is no edge (u,v) in E', and by definition there is an edge in E. Repeat for all vertices in the independent set, and you got a clique in G).
Since clique problem is NP-Hard, this makes this one such as well.
Okay, so I found this a bit tricky.
Basically, you have a directed graph (let's call it the base graph), that has some leaves and a node with 0 indegree that is called root. It may contain cycles.
From that base graph, a tree has been made, that contains the root and all leaves, and some connection between them. The nodes and edges that are not needed to connect the root to the leaves are left out.
Now imagine one or more edges in the tree "break", and can no longer be used. The problem now is to
a) If possible, find an alternative route(s) to the disconnected node(s), introducing as few previously unused edges from the base graph as possible.
b) If not possible, select which edges to "repair", repairing as few edges as possible to get all leaves connected again.
This is supposed to represent an electrical grid, and the breaks are power outages.
If just one edge is broken, it is easy enough. But say you have a graph with 100 leaves, 500 edges, and 50 edges break. Now to find which combination of adding previously unused edges from the base graph, and if necessary repairing some edges, to connect all leaves, seems like a very hard problem.
I imagined one could do some sort of brute force, where ALL combinations of unused edges, from using 1 to all of them, are tested. Or if repairs are needed, testing ALL combinations of repairs with all combinations of new edges. When the amount of edges get high, this seems to me very very inefficient.
My question is, does anyone have any smart ideas to how this could be done in a more efficient way? I hope I explained it well enough.
This is an NP-hard problem, and I'll explain why. Imagine that you have three layers of nodes: the root node, a layer of intermediate connecting nodes, and then a layer of leaf nodes. Edges go from root to intermediate nodes, and from an intermediate node to some subset of leaf nodes. Suppose you have some choice of intermediate nodes and edges to leaf nodes that gives you a connected tree graph, where each intermediate node has an edge to only one leaf node. Now imagine all edges in the reduced graph are removed. Then to find the minimum number of edges needed to add to repair the graph, this is equivalent to finding the minimum number of remaining intermediate nodes whose edges cover all of the leaf nodes. This is equivalent to the set cover problem for the leaf nodes http://en.wikipedia.org/wiki/Set_cover_problem and is NP-hard. Thus there is almost certainly no fast algorithm for your problem in the worst case (unless P = NP). Maybe if you bound the number of edges that are removed, you can come up with a polynomial time algorithm where the exponent in the polynomial depends (hopefully weakly) on how many edges were removed.
Seems like the start to a good efficient heuristic/solution would be to weight the edges. A couple simple approaches (not the most space efficient) as to how you could weight the edges based on the total number of edges are listed below.
If using any number of undamaged edges is better than using a single alternative edge and using any number of alternative edges is better than a single damaged edge.
Undamaged edge: 1
Alternative edge: E
Damaged edge: E^2
In the case of 100 vertices and 500 edges, alternative edges would be weighted as 500, while damaged edges would be weighted as 250000.
If using any number of undamaged edges is better than using a single alternative edge or a single damaged edge.
Undamaged edge: 1
Alternative/damaged edge: E
In the case of 100 vertices and 500 edges, alternative/damaged edges would be weighted as 500.
It seems like you then try a number of approaches to find either the exact solution or a heuristic result. The main suggestion I have for an algorithm is below.
Find the directed minimium spanning tree. If you use the weighting listed above, then I believe the result is optimum if I'm understanding things correctly.
Although, if you have intermediate nodes (nodes that are neither the root or a leaf), then this is likely to result in an overestimating heuristic. In which case, you might be able to get around it by running all pairs all shortest paths first and use the path costs for that as input for the directed minimium spanning tree algorithm, but that's probably a heuristic as well.
Here is the full question:
Assume we have a directed graph G = (V,E), we want to find a graph G' = (V,E') that has the following properties:
G' has same connected components as G
G' has same component graph as G
E' is minimized. That is, E' is as small as possible.
Here is what I got:
First, run the strongly connected components algorithm. Now we have the strongly connected components. Now go to each strong connected component and within that SCC make a simple cycle; that is, a cycle where the only nodes that are repeated are the start/finish nodes. This will minimize the edges within each SCC.
Now, we need to minimize the edges between the SCCs. Alas, I can't think of a way of doing this.
My 2 questions are: (1) Does the algorithm prior to the part about minimizing edges between SCCs sound right? (2) How does one go about minimizing the edges between SCCs.
For (2), I know that this is equivalent to minimizing the number of edges in a DAG. (Think of the SCCs as the vertices). But this doesn't seem to help me.
The algorithm seems right, as long as you allow for closed walks (i.e. repeating vertices.) Proper cycles might not exist (e.g. in an "8" shaped component) and finding them is NP-hard.
It seems that it is sufficient to group the inter-component edges by ordered pairs of components they connect and leave only one edge in each group.
Regarding the step 2,minimize the edges between the SCCs, you could randomly select a vertex, and run DFS, only keeping the longest path for each pair of (root, end), while removing other paths. Store all the vertices searched in a list L.
Choose another vertex, if it exists in L, skip to the next vertex; if not, repeat the procedure above.