I’m currently studying flow networks in the university, and my professor presented this theorem to us:
“Given a flow network, and a flow B in it, so that for each vertex, except the source and the sink: |∑(e:u→v) of B(e) - ∑(e':v→u) of B(e')|≤ε.
Note: this equation is for every v (vertex who is not the source or
the sink in the network). e:u→v means that I want the Sum of B(e)'s of
every edge who is, in a cutset, from the set of u to the set of v. and
then, e':v→u means that I want the Sum of B(e)'s of every edge who is,
in the same cutset, from the set of v to the set of u.
There exists a new flow, F, that for every edge in the graph, |F(e)-B(e)|<ε*N (where N is the number of vertexes in the graph).”
He claimed that a proof exists, but I can’t get to the bottom of it. I was thinking about the fact that Epsilon’s lower bound is the min cut of the graph, but all the other ideas I had we’re useless. I’d appreciate any help. I searched for the proof on the web but couldn’t find anything.
Thanks in advance,
Or

Given an antisymmetric assignment of quantities to edges, the excess of a vertex is the total quantity entering minus the total quantity exiting. For each vertex v with a negative excess -c, choose a path from the source s to v, multiply it by c, and add it to the assignment. For each vertex v with a positive excess c, choose a path from v to the sink t, multiply it by c, and add it to the assignment. It's straightforward to check that (1) all of the excesses are now zero, except at s and t (2) since every excess was less than epsilon in absolute value, the worst-case change for an edge is if it's involved in every path, for a total of less than epsilon times n, the number of vertices.

Related

Max flow: how to force f units to flow, with minimal changes to capacity?

Let's say I have a graph and run a max-flow on it. I get some flow, f. However, I want to to flow f1 units where f1>f. Of course, I need to go about increasing some of the edge capacities. I want to make as small a total increase as possible to the capacities. Is there a clever algorithm to achieve this?
If it helps, I care for my application about bi-partite graphs with source (s) to left vertices (L) having some finite, integer capacities (c_l), left vertices L to right vertices R having some connectivity with infinite capacities and all right vertices, R connected to a sink vertex with finite integer capacities (c_r). Here, c_l and c_r sum to the same number. Also, there are no connections among the left vertices or among the right ones.
An example is provided in the image below. The blue numbers are the flow capacities and the pink numbers are the actual flows in the max-flow. Currently, 5 units are flowing but I want 9 units to flow.
In general, turn the flow instance into a min-cost flow instance by setting the cost of existing arcs to zero and adding new, infinite-capacity arcs doubling them of cost one.
For these particular instances, the best you're going to do is to repeatedly find an unsaturated arc of finite capacity and push flow along any path that includes it. Once everything's saturated just use any path.
This seems a little too easy to be what you want, so I'll mention that it's possible to formulate more sophisticated objectives and solve them using linear programming techniques.
The graph is undirected, and all the "middle" vertices have infinite capacity. That means we can unify all vertices connected by infinite capacity in L and R, making a very simple graph indeed.
For example, in the above graph, an equivalent graph would be:
s -8-> Vertex 1+2+4 -4-> t
s -1-> Vertex 3+5 -5-> t
So we end up with just a bunch of unique paths with no branching. We can unify the nodes with a simple "floodfill" or DFS type search on infinite-capacity edges. When we unify nodes, we add up their "left" and "right" capacities.
To maximize flow in this graph we:
First, if the left and right paths are not equal, increase the lower one until they are equal. This lets us convert an increase of cost X, into an increase in flow of X.
Once the left and right paths are equal for all nodes, we pick any path. Then, we increase both halves of the path with cost 2X, increasing the flow by X.

All paths of length k from a given vertice

Let's say i have a directed graph G(V,E) with edge cost(real number) ∈ (0,1).For given i,I need to find all the couples of vertices (i,j) starting from i that "match".Two vertices (i,j) match if there is a directed path from i to j with length exactly k(k is a given number that is relatively small and could be considered as constant)with cost >=C(C is a given number).Cost of a path is calculated as the product of it's edges.For example if a path starting from i and ending in j of lenght 2 consists edges e1 and e2 then CostOfpath=cost(e1)*cost(e2).
This has to be done in O(E+V*k).So what i thought is modifying the DFS algorithm updating the distances from given starting vertice i until they reach the length of k.If they don't then we can't have a match.However i am having a hard time finding what exactly i can modify in the DFS.Any ideas?
When you need to consider paths with a fixed number of edges in it, dynamic programming often comes to help (while other approaches often fail).
Let's denote dp[v][j] the maximal cost of the path from vertex i (fixed) to vertex v that has exactly j edges.
For a starting values, you can set values for j==1: dp[v][1] is the cost of edge from i to v (or 0 if no such edge exists). Or if you think on it it will be obvious that you can set values for j==0, not j==1: dp[i][0] is 1, while dp[v][0] can be set to zero for v!=i.
Now, if you have values for some j, it is easy to calculate values for j+1:
dp[v][j+1] = max( dp[v'][j] * cost((v', v)) )
This is very similar to Ford-Bellman's algorithm, only that the latter does not need to track the number of edges and thus can use one-dimensional array.
This gives you the solution in O((E+V)*k). Not exactly what you have requested, but I doubt that there exists solution in O(E+V*k).
(In the solution above, I assume that the constant C is positive, and so a zero cost path is equivalent to the path being absolutely absent. If you need, you can specifically account for the C==0 case.)

Why priority-queue based Dijkstra shortest-path algorithm cannot work for negative-weights graph? [duplicate]

Can somebody tell me why Dijkstra's algorithm for single source shortest path assumes that the edges must be non-negative.
I am talking about only edges not the negative weight cycles.
Recall that in Dijkstra's algorithm, once a vertex is marked as "closed" (and out of the open set) - the algorithm found the shortest path to it, and will never have to develop this node again - it assumes the path developed to this path is the shortest.
But with negative weights - it might not be true. For example:
A
/ \
/ \
/ \
5 2
/ \
B--(-10)-->C
V={A,B,C} ; E = {(A,C,2), (A,B,5), (B,C,-10)}
Dijkstra from A will first develop C, and will later fail to find A->B->C
EDIT a bit deeper explanation:
Note that this is important, because in each relaxation step, the algorithm assumes the "cost" to the "closed" nodes is indeed minimal, and thus the node that will next be selected is also minimal.
The idea of it is: If we have a vertex in open such that its cost is minimal - by adding any positive number to any vertex - the minimality will never change.
Without the constraint on positive numbers - the above assumption is not true.
Since we do "know" each vertex which was "closed" is minimal - we can safely do the relaxation step - without "looking back". If we do need to "look back" - Bellman-Ford offers a recursive-like (DP) solution of doing so.
Consider the graph shown below with the source as Vertex A. First try running Dijkstra’s algorithm yourself on it.
When I refer to Dijkstra’s algorithm in my explanation I will be talking about the Dijkstra's Algorithm as implemented below,
So starting out the values (the distance from the source to the vertex) initially assigned to each vertex are,
We first extract the vertex in Q = [A,B,C] which has smallest value, i.e. A, after which Q = [B, C]. Note A has a directed edge to B and C, also both of them are in Q, therefore we update both of those values,
Now we extract C as (2<5), now Q = [B]. Note that C is connected to nothing, so line16 loop doesn't run.
Finally we extract B, after which . Note B has a directed edge to C but C isn't present in Q therefore we again don't enter the for loop in line16,
So we end up with the distances as
Note how this is wrong as the shortest distance from A to C is 5 + -10 = -5, when you go .
So for this graph Dijkstra's Algorithm wrongly computes the distance from A to C.
This happens because Dijkstra's Algorithm does not try to find a shorter path to vertices which are already extracted from Q.
What the line16 loop is doing is taking the vertex u and saying "hey looks like we can go to v from source via u, is that (alt or alternative) distance any better than the current dist[v] we got? If so lets update dist[v]"
Note that in line16 they check all neighbors v (i.e. a directed edge exists from u to v), of u which are still in Q. In line14 they remove visited notes from Q. So if x is a visited neighbour of u, the path is not even considered as a possible shorter way from source to v.
In our example above, C was a visited neighbour of B, thus the path was not considered, leaving the current shortest path unchanged.
This is actually useful if the edge weights are all positive numbers, because then we wouldn't waste our time considering paths that can't be shorter.
So I say that when running this algorithm if x is extracted from Q before y, then its not possible to find a path - which is shorter. Let me explain this with an example,
As y has just been extracted and x had been extracted before itself, then dist[y] > dist[x] because otherwise y would have been extracted before x. (line 13 min distance first)
And as we already assumed that the edge weights are positive, i.e. length(x,y)>0. So the alternative distance (alt) via y is always sure to be greater, i.e. dist[y] + length(x,y)> dist[x]. So the value of dist[x] would not have been updated even if y was considered as a path to x, thus we conclude that it makes sense to only consider neighbors of y which are still in Q (note comment in line16)
But this thing hinges on our assumption of positive edge length, if length(u,v)<0 then depending on how negative that edge is we might replace the dist[x] after the comparison in line18.
So any dist[x] calculation we make will be incorrect if x is removed before all vertices v - such that x is a neighbour of v with negative edge connecting them - is removed.
Because each of those v vertices is the second last vertex on a potential "better" path from source to x, which is discarded by Dijkstra’s algorithm.
So in the example I gave above, the mistake was because C was removed before B was removed. While that C was a neighbour of B with a negative edge!
Just to clarify, B and C are A's neighbours. B has a single neighbour C and C has no neighbours. length(a,b) is the edge length between the vertices a and b.
Dijkstra's algorithm assumes paths can only become 'heavier', so that if you have a path from A to B with a weight of 3, and a path from A to C with a weight of 3, there's no way you can add an edge and get from A to B through C with a weight of less than 3.
This assumption makes the algorithm faster than algorithms that have to take negative weights into account.
Correctness of Dijkstra's algorithm:
We have 2 sets of vertices at any step of the algorithm. Set A consists of the vertices to which we have computed the shortest paths. Set B consists of the remaining vertices.
Inductive Hypothesis: At each step we will assume that all previous iterations are correct.
Inductive Step: When we add a vertex V to the set A and set the distance to be dist[V], we must prove that this distance is optimal. If this is not optimal then there must be some other path to the vertex V that is of shorter length.
Suppose this some other path goes through some vertex X.
Now, since dist[V] <= dist[X] , therefore any other path to V will be atleast dist[V] length, unless the graph has negative edge lengths.
Thus for dijkstra's algorithm to work, the edge weights must be non negative.
Dijkstra's Algorithm assumes that all edges are positive weighted and this assumption helps the algorithm run faster ( O(E*log(V) ) than others which take into account the possibility of negative edges (e.g bellman ford's algorithm with complexity of O(V^3)).
This algorithm wont give the correct result in the following case (with a -ve edge) where A is the source vertex:
Here, the shortest distance to vertex D from source A should have been 6. But according to Dijkstra's method the shortest distance will be 7 which is incorrect.
Also, Dijkstra's Algorithm may sometimes give correct solution even if there are negative edges. Following is an example of such a case:
However, It will never detect a negative cycle and always produce a result which will always be incorrect if a negative weight cycle is reachable from the source, as in such a case there exists no shortest path in the graph from the source vertex.
Try Dijkstra's algorithm on the following graph, assuming A is the source node and D is the destination, to see what is happening:
Note that you have to follow strictly the algorithm definition and you should not follow your intuition (which tells you the upper path is shorter).
The main insight here is that the algorithm only looks at all directly connected edges and it takes the smallest of these edge. The algorithm does not look ahead. You can modify this behavior , but then it is not the Dijkstra algorithm anymore.
You can use dijkstra's algorithm with negative edges not including negative cycle, but you must allow a vertex can be visited multiple times and that version will lose it's fast time complexity.
In that case practically I've seen it's better to use SPFA algorithm which have normal queue and can handle negative edges.
Recall that in Dijkstra's algorithm, once a vertex is marked as "closed" (and out of the open set) -it assumes that any node originating from it will lead to greater distance so, the algorithm found the shortest path to it, and will never have to develop this node again, but this doesn't hold true in case of negative weights.
The other answers so far demonstrate pretty well why Dijkstra's algorithm cannot handle negative weights on paths.
But the question itself is maybe based on a wrong understanding of the weight of paths. If negative weights on paths would be allowed in pathfinding algorithms in general, then you would get permanent loops that would not stop.
Consider this:
A <- 5 -> B <- (-1) -> C <- 5 -> D
What is the optimal path between A and D?
Any pathfinding algorithm would have to continuously loop between B and C because doing so would reduce the weight of the total path. So allowing negative weights for a connection would render any pathfindig algorithm moot, maybe except if you limit each connection to be used only once.
So, to explain this in more detail, consider the following paths and weights:
Path | Total weight
ABCD | 9
ABCBCD | 7
ABCBCBCD | 5
ABCBCBCBCD | 3
ABCBCBCBCBCD | 1
ABCBCBCBCBCBCD | -1
...
So, what's the perfect path? Any time the algorithm adds a BC step, it reduces the total weight by 2.
So the optimal path is A (BC) D with the BC part being looped forever.
Since Dijkstra's goal is to find the optimal path (not just any path), it, by definition, cannot work with negative weights, since it cannot find the optimal path.
Dijkstra will actually not loop, since it keeps a list of nodes that it has visited. But it will not find a perfect path, but instead just any path.
Adding few points to the explanation, on top of the previous answers, for the following simple example,
Dijktra's algorithm being greedy, it first finds the minimum distance vertex C from the source vertex A greedily and assigns the distance d[C] (from vertex A) to the weight of the edge AC.
The underlying assumption is that since C was picked first, there is no other vertex V in the graph s.t. w(AV) < w(AC), otherwise V would have been picked instead of C, by the algorithm.
Since by above logic, w(AC) <= w(AV), for all vertex V different from the vertices A and C. Now, clearly any other path P that starts from A and ends in C, going through V , i.e., the path P = A -> V -> ... -> C, will be longer in length (>= 2) and total cost of the path P will be sum of the edges on it, i.e., cost(P) >= w(AV) >= w(AC), assuming all edges on P have non-negative weights, so that
C can be safely removed from the queue Q, since d[C] can never get smaller / relaxed further under this assumption.
Obviously, the above assumption does not hold when some.edge on P is negative, in a which case d[C] may decrease further, but the algorithm can't take care of this scenario, since by that time it has removed C from the queue Q.
In Unweighted graph
Dijkstra can even work without set or priority queue, even if you just use STACK the algorithm will work but with Stack its time of execution will increase
Dijkstra don't repeat a node once its processed becoz it always tooks the minimum route , which means if you come to that node via any other path it will certainly have greater distance
For ex -
(0)
/
6 5
/
(2) (1)
\ /
4 7
\ /
(9)
here once you get to node 1 via 0 (as its minimum out of 5 and 6)so now there is no way you can get a minimum value for reaching 1
because all other path will add value to 5 and not decrease it
more over with Negative weights it will fall into infinite loop
In Unweighted graph
Dijkstra Algo will fall into loop if it has negative weight
In Directed graph
Dijkstra Algo will give RIGHT ANSWER except in case of Negative Cycle
Who says Dijkstra never visit a node more than once are 500% wrong
also who says Dijkstra can't work with negative weight are wrong

Weighted graph and all pairs path

Am trying to solve a question at this link:
https://www.chegg.com/homework-help/questions-and-answers/consider-weighted-directed-graph-g-n-vertices-e-edges-weights-integers-suppose-g-contains--q12054851
(this is not a homework question)
Consider a weighted directed graph G with n vertices and e edges, and the weights are integers. Suppose that G contains no negative cycles, and for every pair of vertices u and v in G, the distance from u to v falls in the range [-2d, 2d] for some positive integer d. We are going to fix a particular edge (x,y) in G, and consider what happens to the distances in G as we change the weight associated with that edge (and leave all other edge weights fixed).
Design an algorithm that takes G as input, as well as a specified edge (x,y) in G. The output of the algorithm should be an integral range of values that the weight of this edge (x,y) could take such that all of the distances in G would remain the same. Note that this range will be non-empty, as it must include the original weight of the edge (x,y). Also note that infinity may occur as an endpoint of your range (i.e. the range may not be finite). For this, you may return “∞” as an endpoint. The running time of your algorithm must be polynomial in n,e, and d (so your running time should not have any of these parameters appearing as exponents). Prove why the algorithm is correct.
I have been thinking on the following lines:
Since distances are in a range, weights should also be in a range. One option is we run Djkstra's multiple times. How do we optimize this?
Yes, you can run Dijkstra n times. Alternatively you can run Floyd-Warshall, which is designed for these problems. Overall, they have similar complexity bounds.

Finding a "positive cycle"

Suppose we E is an nxn matrix where E[i,j] represents the exchange rate from currency i to currency j. (How much of currency j can be obtained with 1 of currency i). (Note, E[i,j]*E[j,i] is not necessarily 1).
Come up with an algorithm to find a positive cycle if one exists, where a positive cycle is defined by: if you start with 1 of currency i, you can keep exchanging currency such that eventually you can come back and have more than 1 of currency i.
I've been thinking about this problem for a long time, but I can't seem to get it. The only thing I can come up with is to represent everything as a directed graph with matrix E as an adjacency matrix, where log(E[i,j]) is the weight between vertices i and j. And then you would look for a cycle with a negative path or something. Does that even make sense? Is there a more efficient/easier way to think of this problem?
First, take logs of exchange rates (this is not strictly necessary, but it means we can talk about "adding lengths" as usual). Then you can apply a slight modification of the Floyd-Warshall algorithm to find the length of a possibly non-simple path (i.e. a path that may loop back on itself several times, and in different places) between every pair of vertices that is at least as long as the longest simple path between them. The only change needed is to flip the sign of the comparison, so that we always look for the longest path (more details below). Finally you can look through all O(n^2) pairs of vertices u and v, taking the sum of the lengths of the 2 paths in each direction (from u to v, and from v to u). If any of these are > 0 then you have found a (possibly non-simple) cycle having overall exchange rate > 1. Overall the FW part of the algorithm dominates, making this O(n^3)-time.
In general, the problem with trying to use an algorithm like FW to find maximum-weight paths is that it might join together 2 subpaths that share one or more vertices, and we usually don't want this. (This can't ever happen when looking for minimum-length paths in a graph with no negative cycles, since such a path would necessarily contain a positive-weight cycle that could be removed, so it would never be chosen as optimal.) This would be a problem if we were looking for the maximum-weight simple cycle; in that case, to get around this we would need to consider a separate subproblem for every subset of vertices, which pushes the time and space complexity up to O(2^n). Fortunately, however, we are only concerned with finding some positive-weight cycle, and it's reasonably easy to see that if the path found by FW happens to use some vertex more than once, then it must contain a nonnegative-weight cycle -- which can either be removed (if it has weight 0), or (if it has weight > 0) is itself a "right answer"!
If you care about finding a simple cycle, this is easy to do in a final step that is linear in the length of the path reported by FW (which, by the way, may be O(2^|V|) -- if all paths have positive length then all "optimal" lengths will double with each outermost iteration -- but that's pretty unlikely to happen here). Take the optimal path pair implied by the result of FW (each path can be calculated in the usual way, by keeping a table of "optimal predecessor" values of k for each vertex pair (i, j)), and simply walk along it, assigning to each vertex you visit the running total of the length so far, until you hit a vertex that you have already visited. At this point, either currentTotal - totalAtAlreadyVisitedVertex > 0, in which case the cycle you just found has positive weight and you're finished, or this difference is 0, in which case you can delete the edges corresponding to this cycle from the path and continue as usual.

Resources