Managing tasks without using the system clock - algorithm

For the sake of argument i'm trying to define an algorithm that creates
a pool of tasks (each task has an individual time-slice to operate)
and managing them without the system clock.
The problem that i've encountered is that with each approach that I was taking,
the tasks with the higher time-slice were starved.
What i've tried to do is creating a tasks vector that contains a pair of task/(int) "time".
I've sorted the vector with the lowest "time" first & then iterated and executed each task with a time of zero (0). While iterating through the entire vector i've decreased the "time" of each task.
Is there a better approach to this kind of "problem". With my approach, startvation definitely will occur.

Managing tasks may not need a system clock at all.
You only need to figure a way to determine the priority between each task then run each task following their priority.
You may want to pause a task to execute another task and then will need to set a new priority to the paused task. This feature (Multitasking) will need an interruption based on an event (usually clock-time, but you can use any other event like temperature or monkey pushing a button or another process sending a signal).
You say your problem is that tasks with the higher time-slice are starving.
As you decrease the 'time' of each task when running it and assuming 'time' will not be negative, higher time-slice tasks will eventually get to 0 and as well as every other task.

Related

Assign same queue item to multiple workers

We have a logical queue of tasks, where each task has to be assigned to multiple workers.
The numbers of workers to be assigned are based on a configuration of Minimum and Maximum workers.
A worker should not see the same task that they have already completed. It is not necessary that all workers will see all the tasks.
Total number of workers can change dynamically. Each worker can become online or offline anytime.
Each worker can choose to either complete the task or let it expire.
On expiry the task should be assigned to any worker who has not already completed the task.
Is there a good algorithm to solve this scenario ?
The easy solution:
Greedily assign tasks:
For every task that is ready.
Find the Minimum <= N <= Maximum workers that
didn't see the task yet and assign them.
Repeat until you either run
out of workers or finish all the tasks.
If a worker comes online or finishes task, re-check for all the tasks.
If a new task comes, re-check for the available workers.
This solution might be enough if there are not that many tasks, as it is computation heavy and recomputes everything.
The possible optimizations:
If the greedy solution fails(and it probably will), there are ways to improve on it. I will try to list those that come to my mind but it won't be an exhaustive list.
First, my personal favorite: Network flows. Unfortunately I don't see an easy way to resolve the minimal number of workers requirement, however it would be fast and it would result in a maximum possible workers being assigned at any given moment.
Create the network Source - Workers - Tasks - Sink. Edges workers to tasks will be linked and unlinked as needed:
when a worker is available for a task, create the edge with weight 1, otherwise don't create the edge.
From source link an edge with weight one to each online worker.
From every task link an edge with weight equal to its maximal worker capacity.
You could even differentiate between different kinds of workers, network flows are awesome. The algorithms are fast which makes them suitable even for large graphs. Also they are available in many libraries so you won't have to implement them yourself. Unfortunately, there is no easy way to enforce the minimal workers rule. At least I don't see one right now, there might be some way. Or maybe at least a heuristic
Second, be smart while being greedy:
Create a queue for every task.
When a worker is available, register him for every task he can do into its queue.
When a worker is not available, remove him from the queues.
When a task has enough workers, start progress and disable these workers.
This is still the brute force approach however since you keep the queues, you limit the amount of the necessary computation to a reasonable level. The potential downside is that large tasks(with a large minimal number of workers) might be stalled by the small tasks that will be easier to start - and will eat up the workers. So there will probably be some further checking/balancing and prioritizing needed.
There is definitely more to be tried & done for your task at hand, however the information you provided is rather limited so this advice is not that specific.

Max-Min and Min-Min algorithms implementation

I'm trying to simulate the Max-Min and Min-Min scheduling algorithms and code them myself in a simulation. But don't really understand how to implement the way they work in code.
For example, in FCFS algorithm i use 3 servers(vms),each server is faster than the other and 5 tasks with different arrival times. So the first task will check the first server and will be scheduled there, the second if arrive while the first is't completed yet, will check the availability and scheduled to the second server. If all 3 servers are occupied the next task will be scheduled to the one with the min remain executing time.
Now for the Min-Min and Min-Max this is the theoretical background:
Min-Min:
Phase 1: First computes the completion time of every task on each machine and then for every task select the machine which processes the tasks in minimum possible time.
Phase 2: Among all the tasks in Meta task the task with minimum completion time is selected and is assigned to machine on which minimum execution time is expected. The task is removed from the list of Meta Task and the procedure continues until Meta Task list is empty.
Max-Min:
Phase 1: First computes the completion time of every task on each machine and then for every task chooses the machine which processes the tasks in minimum possible time
Phase 2: Among all the tasks in Meta Task the task with maximum completion time is selected and is assigned to machine. The task is removed from the list of Meta Task and the procedure continues until Meta Task list is empty.
I get the phase 1 for both algorithms, I need to check the task's burst time and server's speedup -> burst/speedup = execution time. I will find the best server for each task.
But I can't understand the phase 2. For Min-Min i have to choose every time the fastest task and when i find it I will have to schedule it to the faster server. But the workload will be imbalanced, as I said 3 servers and at least one is the faster, lets say server with ID 1, so every time the tasks will scheduled to this one, I also need the other 2 to work.
Same problem with Max-Min, find the worst task, schedule it to the worst server, but only one server is the worst so the other 2 will not work. How am I suppose to do the balancing and also take in consideration that the tasks arrive in different times?
If you need anything more just let me know and thanks in advance!
You can find nice description of both algorithms in A Comparative Analysis of Min-Min and Max-Min Algorithms based on the Makespan Parameter:
I paste here pseudocode for Min-Min. ETij is execution time for task ti on resource Rj. And rj is ready time of Rj.
That's true that you can have imbalanced load, because all small task will get executed first. Max-Min algorithm overcomes this drawback.
Max-Min algorithm performs the same steps as the Min-Min algorithm but the main difference comes in the second phase, where a task ti is selected which has the maximum completion time instead of minimum completion time as in min-min and assigned to resource Rj, which gives the minimum completion time.

What is a good way to design and build a task scheduling system with lots of recurring tasks?

Imagine you're building something like a monitoring service, which has thousands of tasks that need to be executed in given time interval, independent of each other. This could be individual servers that need to be checked, or backups that need to be verified, or just anything at all that could be scheduled to run at a given interval.
You can't just schedule the tasks via cron though, because when a task is run it needs to determine when it's supposed to run the next time. For example:
schedule server uptime check every 1 minute
first time it's checked the server is down, schedule next check in 5 seconds
5 seconds later the server is available again, check again in 5 seconds
5 seconds later the server is still available, continue checking at 1 minute interval
A naive solution that came to mind is to simply have a worker that runs every second or so, checks all the pending jobs and executes the ones that need to be executed. But how would this work if the number of jobs is something like 100 000? It might take longer to check them all than it is the ticking interval of the worker, and the more tasks there will be, the higher the poll interval.
Is there a better way to design a system like this? Are there any hidden challenges in implementing this, or any algorithms that deal with this sort of a problem?
Use a priority queue (with the priority based on the next execution time) to hold the tasks to execute. When you're done executing a task, you sleep until the time for the task at the front of the queue. When a task comes due, you remove and execute it, then (if its recurring) compute the next time it needs to run, and insert it back into the priority queue based on its next run time.
This way you have one sleep active at any given time. Insertions and removals have logarithmic complexity, so it remains efficient even if you have millions of tasks (e.g., inserting into a priority queue that has a million tasks should take about 20 comparisons in the worst case).
There is one point that can be a little tricky: if the execution thread is waiting until a particular time to execute the item at the head of the queue, and you insert a new item that goes at the head of the queue, ahead of the item that was previously there, you need to wake up the thread so it can re-adjust its sleep time for the item that's now at the head of the queue.
We encountered this same issue while designing Revalee, an open source project for scheduling triggered callbacks. In the end, we ended up writing our own priority queue class (we called ours a ScheduledDictionary) to handle the use case you outlined in your question. As a free, open source project, the complete source code (C#, in this case) is available on GitHub. I'd recommend that you check it out.

How to calculate proper timeout or ETA value

The problem is as follows: I have a service broker which distributes different types of tasks to workers. These tasks are of different size and complexity and thus require a different amount of time to process.
Now I would like to calculate a time-out value for each type of service, so that after it has elapsed the client can be notified that the task took to long, and that likely something went wrong.
There are two options which I've tried, but both have flaws.
Do not calculate the time-out, but make it an configurable setting (annoying since it's pretty arbitrary)
Start with a very generous time-out and after each task calculate some sort of running statistic (like a running average + variance). This has the problem that it converges to the mean since longer running tasks get censored. Eventually allowing a far too narrow band of task durations.
Since the tail of the distribution of task durations is likely long (i.e. longer than a normal distribution) it is likely that some more complicated statistic is needed.
Is there an accepted way of calculating time-out values based on task durations?

What's the best Task scheduling algorithm for some given tasks?

We have a list of tasks with different length, a number of cpu cores and a Context Switch time.
We want to find the best scheduling of tasks among the cores to maximize processor utilization.
How could we find this?
Isn't it like if we choose the biggest available tasks from the list and give them one by one to the current ready cores, it's going to be best or you think we must try all orders to find out which is the best?
I must add that all cores are ready at the time unit 0 and the tasks are supposed to work concurrently.
The idea here is that there's no silver bullet, for what you must consider what are the types of tasks being executed, and try to schedule them as nicely as possible.
CPU-bound tasks don't use much communication (I/O), and thus, need to be continuously executed, and interrupted only when necessary -- according to the policy being used;
I/O-bound tasks may be continuously put aside in the execution, allowing other processes to work, since it will be sleeping for many periods, waiting for data to be retrieved to primary memory;
interative tasks must be continuously executed, but needs not to be executed without interruptions, as it will generate interruptions, waiting for user inputs, but it needs to have a high priority, in order not to let the user notice delays in the execution.
Considering this, and the context switch costs, you must evaluate what types of tasks you have, choosing, thus, one or more policies for your scheduler.
Edit:
I thought this was a simply conceptual question. Considering you have to implement a solution, you must analyze the requirements.
Since you have the length of the tasks, and the context switch times, and you have to maintain the cores busy, this becomes an optimization problem, where you must keep the minimal number of cores idle when it reaches the end of the processes, but you need to maintain the minimum number of context switches, so that your overall execution time does not grow too much.
As pointed by svick, this sounds like a partition problem, which is NP-complete, and in which you need to divide a sequence of numbers into a given number of lists, so that the sum of each list is equal to each other.
In your problem you'd have a relaxation on the objective, so that you no longer need all the cores to execute the same amount of time, but you want the difference between any two cores execution time to be as small as possible.
In the reference given by svick, you can see a dynamic programming approach that you may be able to map onto your problem.