Autosys job suspension for a specific hour in a day - job-scheduling

I need to schedule a job in Autosys in such a way that
it runs every 20 min everyday
it does not run for a specific time (say 01:00 to 02:00) everyday
What is the correct way to schedule this?

Try this....
date_conditions: 1
days_of_week: all
start_mins: 00,20,40
run_window: "02:00-01:00"

You would need to set up 2 jobs, with all the same parameters (except the job name, of course, which has to be unique), except one will have a run_window before the period of time you don't want it to run, and the other job will start up at the end of the time it is not to run:
Job A: run_window: 08:00-12:00
Job B: run_window: 13:00-16:00

Related

What is "INTERVAL=0" means in Oracle Schedular?

My Oracle DBA have setup a task with following repeat_interval:
Start Date :"30/JAN/20 08:00AM"
Repeat_interval: "FREQ=DAILY; INTERVAL=0; BYMINUTE=15"
Can I ask what is "Interval=0" means?
Does it means this task will run daily from 8AM, and will repeat every 15 mins until success?
I tried to get the answer from Google, but what I find is what is Interval=1, but nothing for 0.
So would be great if anyone can share me some light here.
Thanks in advance!
INTERVAL is the number of increments of the FREQ value between executions. I believe in this case that a value of 0 or 1 would be the same. The schedule as shown would execute once per day (FREQ=DAILY), at approximately 15 minutes past a random hour (BYMINUTE=15, but BYHOUR and BYSECOND are not set).
Schedule has nothing to do with whether or not the previous execution succeeded or not. Start Date is only the date at which the job was enabled, not when it actually starts processing.
If you want it to run every 15 minutes from the moment you enable it, you should set as follows:
FREQ=MINUTELY; INTERVAL=15
If you want it to run exactly on the quarter hour, then this:
FREQ=MINUTELY; BYMINUTE=0,15,30,45; BYSECOND=0
If you want it to run every day at 8am, then this:
FREQ=DAILY; BYHOUR=8; BYMINUTE=0; BYSECOND=0

how can I run ruby script for n-occurrences every X-minutes

I am looking at https://github.com/jmettraux/rufus-scheduler which nicely allows me to schedule and chain events.
But I want the events to stop after, say, the 10th occurrence or after the 24 days.
How do I do this?
My case would be:
run a script which creates the recurring jobs based on intervals and then stops after a given date or occurrence.
This is what I have done.
def run_schedule(url, count, method, interval)
puts "running scheduler"
scheduler = Rufus::Scheduler.new
scheduler.every interval do
binding.pry
attack_loop(url, count, method)
end
end
I am testing my site and want the attack_loop to be scheduled in memory to run against the interval.
But it appears it never hits the binding.pry line.
Normally these schedulers are running via cron jobs. Then the problem with your requirement is cron job doesn't know whether you hit the 10th occurrence or the 24 days as it doesnt keep a track. One possible solution would be to create a separate table to update the cron job details.
I'm thinking a table like,
scheduler_details
- id
- occurrence_count
- created_date
- updated_date
_ scheduler_type
So, now when you run a script, you can create or update the details. (You can search the script by scheduler_type, that way
you can check the number of occurrences
with created date, you can calculate the 24 days
HTH
Good day, you can specify the number of times a job should run:
https://github.com/jmettraux/rufus-scheduler/#times--nb-of-times-before-auto-unscheduling
If you need a more elaborate stop condition, you could do:
scheduler.every interval do |job|
if Time.now > some_max_date
job.unschedule
else
attack_loop(url, count, method)
end
end
But it appears it never hits the binding.pry line.
What has it to do with your issue title? Are you mixing issues?

How can I give dependancy to every(repeat Job ) in TWS

How can I add dependency to Every Job for example
there are 2 job in one jobstream,both are every job mean they run at every 30 min.but I want to implement one condition in between.
Condition: 2nd job will run only after completion of 1st for every 30 min mean each instance of 2nd job will run only after each instance of 1st job
Please give me solution.I need this
Job1
every 30 min
at 10.30
Job2
every 30 min
at 10.30
follow job1
For this scenario you cannot use the every on the job, that let each job to repeat by its own and how you have seen let the 2nd job to run after the 1st job has completed the first time.
In order to have the dependency considered at each run you have to include the 2 jobs in a job stream and repeat the whole job stream
There are two possible solutions for that, depending on your scenario:
Use the every on job stream
SCHEDULE JS1
ON RUNCYCLE RC1 "FREQ=DAILY;INTERVAL=1"
( SCHEDTIME 1030 EVERY 0030 EVERYENDTIME 1800 )
ONOVERLAP ENQUEUE
:
JOB1
JOB2
FOLLOWS JOB1
END
Add a 3rd job after job2 that resubmit the job stream using conman sbs. In this case you can use datecalc to calculate the AT time of the new instance.

Oracle-DBMS jobs scheduler change the start time

I have a DBMS_jobs which is scheduled to run a procedure FINDING_PROCEDURE at 6 am evey day. Can anyone tell me how can i change the start time so that it is scheduled to run at 9 am from tomorrow. Thanks in advance.
As I already mentioned in my comment - your job doesn't run at 6 am every day, it runs every 21 hours.
As a second remark, you should seriously consider switching to DBMS_SCHEDULER - it's so much nicer than DBMS_JOB.
Anyway, to let this job run at 9am every day, this should do the trick:
DBMS_JOB.CHANGE (
job => your_job_id,
interval => 'trunc(sysdate) + 1 + 9/24');
you can use DBMS_JOB.CHANGE() to Alter your job schedule.
Click on this link for complete reference from
Oracle Documentation:DBMS_JOB
and find DBMS_JOB.CHANGE()

Scheduling a task to run at the end of every month. (Windows Server 2003 - Scheduled Tasks)

I need to schedule a task to run on the last night of each month, on a Windows 2003 Server.
I see that you can schedule it to run on the "first or last Mon-Fri", or even on the nth day of each month - but, not how to get it to run on the last day (regardless of day of the week or number).
Thanks in advance.
Note: I did check "How do you schedule tasks in Windows?", etc...
Looks like you have to set up multiple schedules for your task. One schedule for the months with 31 days, another for those with 30, and one more for February. See this: http://support.microsoft.com/kb/936627
I do it a little differently - I run one task every day but since the task is in vbscript - I do this:
DIM datecur, datefut
datecur = DATEPART("m",NOW())
datefut = DATEPART("m",NOW()+1)
If (datecur <> datefut) then
'insert code you want to run here
end if
Simple and it works - hope this helps someone
As of November 2022, much newer Windows version (2019)
I see this option in Triggers:
WinScheduler Task Triggers
Begin the task: On a schedule
Settings:
Monthly
On: Last > then select All weekdays

Resources