I'd like to test CB for e-commerce task: personal offer recommendations (like "last chance to buy", "similar positions", "consumers recommend", "bestsellers", etc.). My task is to order them (more relevant issue is higher in the list of recommendations).
So, there are 5 possible offers.
I have some historical data collected without using any model: context (user and web-session features), action id (one of my 5 offers), reward (1 if user clicked this offer, 0 - not clicked). So I have N users and 5 offers with known reward, totally 5*N rows in my historical data.
Ex:
1:1:1 | user_id:1 f1:... f2:...
2:-1:1 | user_id:1 f1:... f2:...
3:-1:1 | user_id:1 f1:... f2:...
This means that user 1 have seen 3 offers (1,2,3), cost of the 1 offer is equal to 1 (didn't click), user ckickes on offers 2 and 3 (cost is negative -> reward is positive). Probabilities are equal to 1, since all offers were shown and we know rewards.
Global task is to increase CTR. I'd like to use this data for training CB and then improve the model by exploration/exploitation policies. I set probabilities equal to 1 in this data (Is it right?). But next I'd like to set the order of offers according to rewards.
Should I use for this warm start in VW CB? Will this work correctly with data collected without using CB? Maybe you can advise more relevant methods in CB for this data and task?
Thanks a lot.
If there are only 5 possible offers and if you (as indicated) have data of the form "I have N users and 5 offers with known reward, totally 5*N rows in my historical data." then your historical data is supervised multilabel data and the warm-start functionality would apply; make sure you use the cost-sensitive version to accommodate the multilabel aspect of your historical data (i.e., there is more than one offer that would result in a click).
Will this work correctly with data collected without using CB?
Because the every action-reward is specified for every user in the data set, you only have to ensure that the sample of users is representative of the population you care about.
Maybe you can advise more relevant methods in CB for this data and task?
The first paragraph started with "if" because the more typical case is 1) there are many possible offers and 2) users have only seen a few of them historically.
In such case what you have is a combination of a degenerate logging policy and multiple rewards being revealed. If there are k possible actions but each user has only seen n<=k historically then you could try and make n lines for each user as you did. Theoretically this does not necessarily work but in practice it might help.
Out of the box: change the data
If the data you have was collected as the result of running an existing policy, then an alternative would be to start randomizing the decisions made by that system in order to collect a dataset which conforms to CB. For example, use your current system to pick the "best" action 96% of the time, and one of the other 4 actions at random 4% of the time, and log the probability along with the reward (either 0.96 or 0.01 depending upon whether it was the considered best), and then set up a proper CB-style training set for vw. With this you can also counterfactually estimate the value of both your current policy and the policy vw generates, and only switch to vw when it is winning.
The fastest way to implement the last paragraph is to just start using APS.
tl;dr: I want to predict file copy completion. What are good methods given the start time and the current progress?
Firstly, I am aware that this is not at all a simple problem, and that predicting the future is difficult to do well. For context, I'm trying to predict the completion of a long file copy.
Current Approach:
At the moment, I'm using a fairly naive formula that I came up with myself: (ETC stands for Estimated Time of Completion)
ETC = currTime + elapsedTime * (totalSize - sizeDone) / sizeDone
This works on the assumption that the remaining files to be copied will do so at the average copy speed thus far, which may or may not be a realistic assumption (dealing with tape archives here).
PRO: The ETC will change gradually, and becomes more and more accurate as the process nears completion.
CON: It doesn't react well to unexpected events, like the file copy becoming stuck or speeding up quickly.
Another idea:
The next idea I had was to keep a record of the progress for the last n seconds (or minutes, given that these archives are supposed to take hours), and just do something like:
ETC = currTime + currAvg * (totalSize - sizeDone)
This is kind of the opposite of the first method in that:
PRO: If the speed changes quickly, the ETC will update quickly to reflect the current state of affairs.
CON: The ETC may jump around a lot if the speed is inconsistent.
Finally
I'm reminded of the control engineering subjects I did at uni, where the objective is essentially to try to get a system that reacts quickly to sudden changes, but isn't unstable and crazy.
With that said, the other option I could think of would be to calculate the average of both of the above, perhaps with some kind of weighting:
Weight the first method more if the copy has a fairly consistent long-term average speed, even if it jumps around a bit locally.
Weight the second method more if the copy speed is unpredictable, and is likely to do things like speed up/slow down for long periods, or stop altogether for long periods.
What I am really asking for is:
Any alternative approaches to the two I have given.
If and how you would combine several different methods to get a final prediction.
If you feel that the accuracy of prediction is important, the way to go about about building a predictive model is as follows:
collect some real-world measurements;
split them into three disjoint sets: training, validation and test;
come up with some predictive models (you already have two plus a mix) and fit them using the training set;
check predictive performance of the models on the validation set and pick the one that performs best;
use the test set to assess the out-of-sample prediction error of the chosen model.
I'd hazard a guess that a linear combination of your current model and the "average over the last n seconds" would perform pretty well for the problem at hand. The optimal weights for the linear combination can be fitted using linear regression (a one-liner in R).
An excellent resource for studying statistical learning methods is The Elements of
Statistical Learning by Hastie, Tibshirani and Friedman. I can't recommend that book highly enough.
Lastly, your second idea (average over the last n seconds) attempts to measure the instantaneous speed. A more robust technique for this might be to use the Kalman filter, whose purpose is exactly this:
Its purpose is to use measurements observed over time, containing
noise (random variations) and other inaccuracies, and produce values
that tend to be closer to the true values of the measurements and
their associated calculated values.
The principal advantage of using the Kalman filter rather than a fixed n-second sliding window is that it's adaptive: it will automatically use a longer averaging window when measurements jump around a lot than when they're stable.
Imho, bad implementations of ETC are wildly overused, which allows us to have a good laugh. Sometimes, it might be better to display facts instead of estimations, like:
5 of 10 files have been copied
10 of 200 MB have been copied
Or display facts and an estimation, and make clear that it is only an estimation. But I would not display only an estimation.
Every user knows that ETCs are often completely meaningless, and then it is hard to distinguish between meaningful ETCs and meaningless ETCs, especially for inexperienced users.
I have implemented two different solutions to address this problem:
The ETC for the current transfer at start time is based on a historic speed value. This value is refined after each transfer. During the transfer I compute a weighted average between the historic data and data from the current transfer, so that the closer to the end you are the more weight is given to actual data from the transfer.
Instead of showing a single ETC, show a range of time. The idea is to compute the ETC from the last 'n' seconds or minutes (like your second idea). I keep track of the best and worst case averages and compute a range of possible ETCs. This is kind of confusing to show in a GUI, but okay to show in a command line app.
There are two things to consider here:
the exact estimation
how to present it to the user
1. On estimation
Other than statistics approach, one simple way to have a good estimation of the current speed while erasing some noise or spikes is to take a weighted approach.
You already experimented with the sliding window, the idea here is to take a fairly large sliding window, but instead of a plain average, giving more weight to more recent measures, since they are more indicative of the evolution (a bit like a derivative).
Example: Suppose you have 10 previous windows (most recent x0, least recent x9), then you could compute the speed:
Speed = (10 * x0 + 9 * x1 + 8 * x2 + ... + x9) / (10 * window-time) / 55
When you have a good assessment of the likely speed, then you are close to get a good estimated time.
2. On presentation
The main thing to remember here is that you want a nice user experience, and not a scientific front.
Studies have demonstrated that users reacted very badly to slow-down and very positively to speed-up. Therefore, a good progress bar / estimated time should be conservative in the estimates presented (reserving time for a potential slow-down) at first.
A simple way to get that is to have a factor that is a percentage of the completion, that you use to tweak the estimated remaining time. For example:
real-completion = 0.4
presented-completion = real-completion * factor(real-completion)
Where factor is such that factor([0..1]) = [0..1], factor(x) <= x and factor(1) = 1. For example, the cubic function produces the nice speed-up toward the completion time. Other functions could use an exponential form 1 - e^x, etc...
Suppose you were able keep track of the news mentions of different entities, like say "Steve Jobs" and "Steve Ballmer".
What are ways that could you tell whether the amount of mentions per entity per a given time period was unusual relative to their normal degree of frequency of appearance?
I imagine that for a more popular person like Steve Jobs an increase of like 50% might be unusual (an increase of 1000 to 1500), while for a relatively unknown CEO an increase of 1000% for a given day could be possible (an increase of 2 to 200). If you didn't have a way of scaling that your unusualness index could be dominated by unheard-ofs getting their 15 minutes of fame.
update: To make it clearer, it's assumed that you are already able to get a continuous news stream and identify entities in each news item and store all of this in a relational data store.
You could use a rolling average. This is how a lot of stock trackers work. By tracking the last n data points, you could see if this change was a substantial change outside of their usual variance.
You could also try some normalization -- one very simple one would be that each category has a total number of mentions (m), a percent change from the last time period (δ), and then some normalized value (z) where z = m * δ. Lets look at the table below (m0 is the previous value of m) :
Name m m0 δ z
Steve Jobs 4950 4500 .10 495
Steve Ballmer 400 300 .33 132
Larry Ellison 50 10 4.0 400
Andy Nobody 50 40 .20 10
Here, a 400% change for unknown Larry Ellison results in a z value of 400, a 10% change for the much better known Steve Jobs is 495, and my spike of 20% is still a low 10. You could tweak this algorithm depending on what you feel are good weights, or use standard deviation or the rolling average to find if this is far away from their "expected" results.
Create a database and keep a history of stories with a time stamp. You then have a history of stories over time of each category of news item you're monitoring.
Periodically calculate the number of stories per unit of time (you choose the unit).
Test if the current value is more than X standard deviations away from the historical data.
Some data will be more volatile than others so you may need to adjust X appropriately. X=1 is a reasonable starting point
Way over simplified-
store people's names and the amount of articles created in the past 24 hours with their name involved. Compare to historical data.
Real life-
If you're trying to dynamically pick out people's names, how would you go about doing that? Searching through articles how do you grab names? Once you grab a new name, do you search for all articles for him? How do you separate out Steve Jobs from Apple from Steve Jobs the new star running back that is generating a lot of articles?
If you're looking for simplicity, create a table with 50 people's names that you actually insert. Every day at midnight, have your program run a quick google query for past 24 hours and store the number of results. There are a lot of variables in this though that we're not accounting for.
The method you use is going to depend on the distribution of the counts for each person. My hunch is that they are not going to be normally distributed, which means that some of the standard approaches to longitudinal data might not be appropriate - especially for the small-fry, unknown CEOs you mention, who will have data that are very much non-continuous.
I'm really not well-versed enough in longitudinal methods to give you a solid answer here, but here's what I'd probably do if you locked me in a room to implement this right now:
Dig up a bunch of past data. Hard to say how much you'd need, but I would basically go until it gets computationally insane or the timeline gets unrealistic (not expecting Steve Jobs references from the 1930s).
In preparation for creating a simulated "probability distribution" of sorts (I'm using terms loosely here), more recent data needs to be weighted more than past data - e.g., a thousand years from now, hearing one mention of (this) Steve Jobs might be considered a noteworthy event, so you wouldn't want to be using expected counts from today (Andy's rolling mean is using this same principle). For each count (day) in your database, create a sampling probability that decays over time. Yesterday is the most relevant datum and should be sampled frequently; 30 years ago should not.
Sample out of that dataset using the weights and with replacement (i.e., same datum can be sampled more than once). How many draws you make depends on the data, how many people you're tracking, how good your hardware is, etc. More is better.
Compare your actual count of stories for the day in question to that distribution. What percent of the simulated counts lie above your real count? That's roughly (god don't let any economists look at this) the probability of your real count or a larger one happening on that day. Now you decide what's relevant - 5% is the norm, but it's an arbitrary, stupid norm. Just browse your results for awhile and see what seems relevant to you. The end.
Here's what sucks about this method: there's no trend in it. If Steve Jobs had 15,000 a week ago, 2000 three days ago, and 300 yesterday, there's a clear downward trend. But the method outlined above can only account for that by reducing the weights for the older data; it has no way to project that trend forward. It assumes that the process is basically stationary - that there's no real change going on over time, just more and less probable events from the same random process.
Anyway, if you have the patience and willpower, check into some real statistics. You could look into multilevel models (each day is a repeated measure nested within an individual), for example. Just beware of your parametric assumptions... mention counts, especially on the small end, are not going to be normal. If they fit a parametric distribution at all, it would be in the Poisson family: the Poisson itself (good luck), the overdispersed Poisson (aka negative binomial), or the zero-inflated Poisson (quite likely for your small-fry, no chance for Steve).
Awesome question, at any rate. Lend your support to the statistics StackExchange site, and once it's up you'll be able to get a much better answer than this.
I'm going to be starting a banner-rotation script soon and I'm getting a bit perplexed over how exactly to develop it. Suppose a client asks for
"10,000 impressions in the next 10 days for $10,000 dollars."
Another client asks for
"1,000 impressions for $100 dollars."
And a third asks for
"1,000 clicks or 10,000 impressions for $5,000."
How exactly do I determine which banner to show upon a page-request? How do I weigh one against another? Clearly the first request is rather important, as I'm expected to serve a set number of impressions within a time-window.
The second client is not nearly as important, as they don't care about a time-window, they just want some face-time.
And the last client wants to place an n or m restraint on the impressions/clicks, making matters slightly more difficult.
I'm already pretty confident that I'll need to abstract some weight from these scenarios to determine who gets the most attention. My question is what type of algorithm could handle this, and secondly how could I serve up banners by weight without always serving up the most important banner with each request?
The difficulty comes from the time constraint more than anything else. I would divide anyone's priority who did not specify a time constraint by 365 (a year), and then use time as part of the weight factor. So:
Client 1 priority: 10000/10 = 1000
Client 2 priority: 1000/365 ~ 3
Client 3 priority: 10000/365 ~30
That should get you a fairly decent indicator of priority. Now, you can't mix and match impressions and clicks can you? They either go the impression route or the click route. Seeing as you cannot control click, but you can control impressions (at least, moreso than clicks), I would weigh it according to impressions.
Use a random-number generator to pick which ad to show, and weight it with a priority for each ad. Set the weighting factor higher for clients that want more impressions or have a deadline. You can increase weighting factor if the time is almost up.
Once a client hits their requested impressions, drop weighting to 0 to prevent their ad from showing.
Default weighting could be 1 or so, with clients being allowed to pay extra to increase priority (without telling them the mechanics -- bill it as "premium" placement, etc).
Edit: weighting details
You can make this as simple or complex as you like, but a basic version would include the following terms:
weight is 0 if ad has reached purchased impressions/clicks
base weighting (1.0 probably)
multiply weight by impressions_remaining / TOTAL impressions remaining for all clients
add a small constant if remaining impressions/clicks is small -- ensures they get the last few ones needed to finish the account
for deadline clients: add term for (remaining impressions/purchased impressions)/(time left/total time)
The deadline clients should be capped at 90% of all page displays or something to ensure they don't outcompete others. The last term gives the "urgency" for deadline clients -- it goes to infinity as deadline hits, so you should put a condition on the remaining time piece to prevent problems with this.
Microsoft Commerce Server contains a NOD algorithm
(see http://msdn.microsoft.com/en-us/library/ms960081%28v=cs.70%29.aspx
and http://msdn.microsoft.com/en-us/library/ee825423%28v=cs.10%29.aspx )
I've used derived versions of this formula in 3 different ad servers, which turned out to work nice for my conditions.
The basic formula regarding your situation uses a variable called NOD, short for "Need of Delivery". At any given time, the "basic" NOD formula of a banner is:
NOD=(Remaining Events / Total Events Requested) * (Total Runtime /
Remaining Runtime)
Note that "Events" is a general term, which may represent impressions, clicks, conversions, etc. depending on your system.
The equation states that all banners start with the initial value of 1.0 to their lives, because (e / e) * (t / t) = 1.0
A higher-than-1 NOD value means you are behind your schedule, while a NOD between 0 and 1 generally means that you have displayed the banner "too fast". Values between 0.9 and 1.2 are generally in acceptable range (this is not a technical range, rather a business experience).
As long as the serving ratios match duration ratios, values stay around 1.0.
For a specific ad slot, the algorithm checks the NODs of all available banners targettable on the slot. Suppose you have 3 banners available on a slot, with NOD values 0.6, 1.35 and 1.05, which add up to 3.0. Then relative probabilities of each banner to be displayed become 20%, 45% and 35% in order [ 0.6 / (0.6 + 1.35 + 1.05)] = 20%
The algorithm uses weighted probability distribution, which means that even the banner with the least NOD value has the chance to be displayed. While the basic formula uses this approach, business decisions generally always forced me to implement algorithms favoring the urgent NOD values more than the original formula. So, I took the base NODs and multiplied them with themselves. In the same example, probabilities become 11%, 55,5%
and 33,5% in order.
For your condition, you might consider changing the formula a little bit to serve your needs. First to be able to compare the income you will earn by displaying a banner, you should convert all display types (impression, click, action, etc) to a common eCPM value. Then you might use this eCPM as a multiplier to the original equation.
Calculating eCPM (effective CPM) might be tricky for not-yet-published campaigns, in this case you should use historical data.
Let me explain this part a little bit more: When trying to compare the probable income you will earn by "displaying" a single banner, you don't need to compare impression based budgets. For click based budgets, you should use historical CTR value to guess "how many impressions does my system need to serve to get X clics". A more advanced algorithm might utilize "how many impressions does my system need to serve to get a campaign in X category, in y inventory".
Then your final equation becomes:
NOD = eCPM * (Remaining Events / Total Events Requested) * (Total
Runtime / Remaining Runtime)
You can always consider using powers of eCPM to compare the results. Like my way of changing the original formula to favor more urgent campaigns, you might favor "more paying" campaigns.
I really like AlbertoPL's time-based approach, but he doesn't factor in the clicks. Its easy to demonstrate pathological cases where clicks are relevant:
Client A offers $1000 for 1 click or 10,000 impressions
Client B offers $1000 for 5000 clicks or 10,000 impressions.
Any reasonable person would give the 1-click guy higher priority. The calculation is actually pretty trivial: assume your click-through is 100 impressions per click.
Client A wants 10,000 impressions or 1 click, so we require a bare minimum of 100 impressions to get paid. At a cost of $1000 per 100 impressions, you can figure that your client is willing to pay $10/impression.
Client B wants 10,000 impressions or 5000 clicks. 5000 clicks requires 500,000 impressions, we'll clearly meet the 10,000 impression mark before then, so we assume the client is really offering to pay $1000 for 10,000 impressions, or $0.10/impression.
We maximize revenue by maximizing our $$$$$/impression, so client A takes priority. Let's use the figures provided in the OP:
Client 1:
10,000 impressions in the next 10 days for $10,000 dollars
= minimum of 10,000 impressions * $1/impression / 10 days
= $1000/day
Client 2:
1,000 impressions for $100 dollars
= minimum of 1,000 impressions * $.01/impression / 365 days
= $0.27/day.
Client 3:
1,000 clicks or 10,000 impressions for $5000
= min(100,000 impressions to get 1,000 clicks, 10,000 impressions) = 10,000 impressions for $5000
= minimum of 10,000 impressions * $0.5/impression / 365
= $13.7/day.
Clients take priority based on how much they pay per day.
What's the rationale behind the formula used in the hive_trend_mapper.py program of this Hadoop tutorial on calculating Wikipedia trends?
There are actually two components: a monthly trend and a daily trend. I'm going to focus on the daily trend, but similar questions apply to the monthly one.
In the daily trend, pageviews is an array of number of page views per day for this topic, one element per day, and total_pageviews is the sum of this array:
# pageviews for most recent day
y2 = pageviews[-1]
# pageviews for previous day
y1 = pageviews[-2]
# Simple baseline trend algorithm
slope = y2 - y1
trend = slope * log(1.0 +int(total_pageviews))
error = 1.0/sqrt(int(total_pageviews))
return trend, error
I know what it's doing superficially: it just looks at the change over the past day (slope), and scales this up to the log of 1+total_pageviews (log(1)==0, so this scaling factor is non-negative). It can be seen as treating the month's total pageviews as a weight, but tempered as it grows - this way, the total pageviews stop making a difference for things that are "popular enough," but at the same time big changes on insignificant don't get weighed as much.
But why do this? Why do we want to discount things that were initially unpopular? Shouldn't big deltas matter more for items that have a low constant popularity, and less for items that are already popular (for which the big deltas might fall well within a fraction of a standard deviation)? As a strawman, why not simply take y2-y1 and be done with it?
And what would the error be useful for? The tutorial doesn't really use it meaningfully again. Then again, it doesn't tell us how trend is used either - this is what's plotted in the end product, correct?
Where can I read up for a (preferably introductory) background on the theory here? Is there a name for this madness? Is this a textbook formula somewhere?
Thanks in advance for any answers (or discussion!).
As the in-line comment goes, this is a simple "baseline trend algorithm",
which basically means before you compare the trends of two different pages, you have to establish
a baseline. In many cases, the mean value is used, it's straightforward if you
plot the pageviews against the time axis. This method is widely used in monitoring
water quality, air pollutants, etc. to detect any significant changes w.r.t the baseline.
In OP's case, the slope of pageviews is weighted by the log of totalpageviews.
This sorta uses the totalpageviews as a baseline correction for the slope. As Simon put it, this puts a balance
between two pages with very different totalpageviews.
For exmaple, A has a slope 500 over 1000,000 total pageviews, B is 1000 over 1,000.
A log basically means 1000,000 is ONLY twice more important than 1,000 (rather than 1000 times).
If you only consider the slope, A is less popular than B.
But with a weight, now the measure of popularity of A is the same as B. I think it is quite intuitive:
though A's pageviews is only 500 pageviews, but that's because it's saturating, you still gotta give it enough credit.
As for the error, I believe it comes from the (relative) standard error, which has a factor 1/sqrt(n), where
n is the number of data points. In the code, the error is equal to (1/sqrt(n))*(1/sqrt(mean)).
It roughly translates into : the more data points, the more accurate the trend. I don't see
it is an exact math formula, just a brute trend analysis algorithm, anyway the relative
value is more important in this context.
In summary, I believe it's just an empirical formula. More advanced topics can be found in some biostatistics textbooks (very similar to monitoring the breakout of a flu or the like.)
The code implements statistics (in this case the "baseline trend"), you should educate yourself on that and everything becomes clearer. Wikibooks has a good instroduction.
The algorithm takes into account that new pages are by definition more unpopular than existing ones (because - for example - they are linked from relatively few other places) and suggests that those new pages will grow in popularity over time.
error is the error margin the system expects for its prognoses. The higher error is, the more unlikely the trend will continue as expected.
The reason for moderating the measure by the volume of clicks is not to penalise popular pages but to make sure that you can compare large and small changes with a single measure. If you just use y2 - y1 you will only ever see the click changes on large volume pages. What this is trying to express is "significant" change. 1000 clicks change if you attract 100 clicks is really significant. 1000 click change if you attract 100,000 is less so. What this formula is trying to do is make both of these visible.
Try it out at a few different scales in Excel, you'll get a good view of how it operates.
Hope that helps.
another way to look at it is this:
suppose your page and my page are made at same day, and ur page gets total views about ten million, and mine about 1 million till some point. then suppose the slope at some point is a million for me, and 0.5 million for you. if u just use slope, then i win, but ur page already had more views per day at that point, urs were having 5 million, and mine 1 million, so that a million on mine still makes it 2 million, and urs is 5.5 million for that day. so may be this scaling concept is to try to adjust the results to show that ur page is also good as a trend setter, and its slope is less but it already was more popular, but the scaling is only a log factor, so doesnt seem too problematic to me.