Importing data incrementally from RDBMS to hive/hadoop using sqoop - hadoop

I have an oracle database and need to import data to a hive table. The daily import data size would be around 1 GB. What would be the better approach?
If I import each day data as a partition, how can the updated values be handled?
For example, if I imported today's data as a partition and for the next day there are some fields that are updated with the new values.
Using --lastmodified we can get the values but where we need to send the updated values to the new partition or to the old (already existing) partition?
If I send to the new partition, then the data is duplicated.
If I want to send to the already existing partition, how we can it be achieved?

Your only option is to override the entire existing partition with 'INSERT OVERWRITE TABLE...'.
Question is - how far back are you going to be constantly updating the data?
I think of 3 approaches u can consider:
Decide on a threshold for 'fresh' data. for example '14 days backwards' or '1 month backwards'.
Then each day you are running the job, you override partitions (only the ones which have updated values) backwards, until the threshold decided.
With ~1 GB a day it should be feasible.
All the data from before your decided time is not guranteed to be 100% correct.
This scenario could be relevant if you know the fields can only be changed a certain time window after they were initially set.
Make your Hive table compatible with ACID transactions, thus allowing updates on the table.
Split your daily job to 2 tasks: the new data being written for the run day. the updated data that you need to run backwards. the sqoop will be responsible for the new data. take care of the updated data 'manually' (some script that generates the update statements)
Don't use partitions based on time. maybe dynamic partitioning is more suitable for your use case.It depends on the nature of the data being handled.

Related

Importing a large amount of data into Elasticsearch every time by dropping existing data

Currently, there's a denormalized table inside a MySQL database that contains hundreds of columns and millions of records.
The original source of the data does not have any way to track the changes so the entire table is dropped and rebuilt every day by a CRON job.
Now, I would like to import this data into Elaticsearch. What is the best way to approach this? Should I use logstash to connect directly to the table and import it or is there a better way?
Exporting the data into JSON or similar is an expensive process since we're talking about gigabytes of data every time.
Also, should I drop the index in elastic as well or is there a way to make it recognize the changes?
In any case - I'd recommend using index templates to simplify index creation.
Now for the ingestion strategy, I see two possible options:
Rework your ETL process to do a merge instead of dropping and recreating the entire table. This would definitely be slower but would allow shipping only deltas to ES or any other data source.
As you've imagined yourself - you should be probably fine with Logstash using daily jobs. Create a daily index and drop the old one during the daily migration.
You could introduce buffers, such as Kafka to your infrastructure, but I feel that might be an overkill for your current use case.

Best approaches to UPDATE the data in tables - Teradata

I am new to Teradata & fortunately got a chance to work on both DDL-DML statements.
One thing I observed is Teradata is very slow when time comes to UPDATE the data in a table having large number of records.
The simplest way I found on the Google to perform this update is to write an INSERT-SELECT statement with a CASE on column holding values to be update with new values.
But what when this situation arrives in Data Warehouse environment, when we need to update multiple columns from a table holding millions of rows ?
Which would be the best approach to follow ?
INSERT-SELECT only OR MERGE-UPDATE OR MLOAD ?
Not sure if any of the above approach is not used for this UPDATE operation.
Thank you in advance!
At enterprise level, we expect volumes to be huge and updates are often part of some scheduled jobs/scripts.
With huge volume of data, Updates comes as a costly operation that involve risk of blocking table for some time in case the update fails (due to fallback journal). Although scripts are tested well, and failures seldom happen in production environments, it's always better to have data that needs to be updated loaded to a temporary table in required form and inserted back to same table after deleting matching records to maintain SCD-1 (Where we don't maintain history).

Historical Data Comparison in realtime - faster in SQL or code?

I have a requirement in the project I am currently working on to compare the most recent version of a record with the previous historical record to detect changes.
I am using the Azure Offline data sync framework to transfer data from a client device to the server which causes records in the synced table to update based on user changes. I then have a trigger copying each update into a history table and a SQL query which runs when building a list of changes to compare the current record vs the most recent historical by doing column comparisons - mainly string but some integer and date values.
Is this the most efficient way of achieving this? Would it be quicker to load the data into memory and perform a code based comparison with rules?
Also, if I continually store all the historical data in a SQL table, will this affect the performance over time and would I be better storing this data in something like Azure Table Storage? I am also thinking along the lines of cost as SQL usage is much more expensive that Table Storage but obviously I cannot use a trigger and would need to insert each synced row into Table Storage manually.
You could avoid querying and comparing the historical data altogether, because the most recent version is already in the main table (and if it's not, it will certainly be new/changed data).
Consider a main table with 50.000 records and 1.000.000 records of historical data (and growing every day).
Instead of updating the main table directly and then querying the 1.000.000 records (and extracting the most recent record), you could query the smaller main table for that one record (probably an ID), compare the fields, and only if there is a change (or no data yet) update those fields and add the record to the historical data (or use a trigger / stored procedure for that).
That way you don't even need a database (probably containing multiple indexes) for the historical data, you could even store it in a flat file if you wanted, depending on what you want to do with that data.
The sync framework I am using deals with the actual data changes, so i only get new history records when there is an actual change. Given a batch of updates to a number of records, i need to compare all the changes with their previous state and produce an output list of whats changed.

Sugessions on defining the Technical Stack for my Hadoop infra structe

I am planning to build a new system in Hadoop, that brings data from External Environment and then do some transformations and builds up a end product.
The external data (if we can assume it is from either oracle/mysql/postgre-sql data base, there can be n-data bases schema) that comes to hadoop system should be always real time (new data should get inserted and updated data should get updated), may be atleast an hour delay at max (we can poll/push hourly basis).
We can also assume the data that exists in my data base schema is with n-tables, I may need m-tables only out of n-tables that exists in source. And each table data of size in GB/TB. So I can't go with full table replace. I should always go incremental(updates/inserts) push/pull into hadoop system.
Hive may support, by dividing my data into date wise partitions, and can query faster, but doesn't not support updates so I have to go for full table replace always, which does not scalable.
My end goal is "Real time data into hadoop system, read query performace, update performance".
Your Technical suggestions for my use case is very useful.

Deleting large number of rows of an Oracle table

I have a data table from company which is of 250Gb having 35 columns. I need to delete around 215Gb of data which
is obviously large number of rows to delete from the table. This table has no primary key.
What could be the fastest method to delete data from this table? Are there any tools in Oracle for such large deletion processes?
Please suggest me the fastest way to do this with using Oracle.
As it is said in the answer above it's better to move the rows to be retained into a separate table and truncate the table because there's a thing called HIGH WATERMARK. More details can be found here http://sysdba.wordpress.com/2006/04/28/how-to-adjust-the-high-watermark-in-oracle-10g-alter-table-shrink/ . The delete operation will overwhelm your UNDO TABLESPACE it's called.
The recovery model term is rather applicable for mssql I believe :).
hope it clarifies the matter abit.
thanks.
Dou you know which records need to be retained ? How will you identify each record ?
A solution might be to move the records to be retained to a temp db, and then truncate the big table. Afterwards, move the retained records back.
Beware that the transaction log file might become very big because of this (but depends on your recovery model).
We had a similar problem a long time ago. Had a table with 1 billion rows in it but had to remove a very large proportion of the data based on certain rules. We solved it by writing a Pro*C job to extract the data that we wanted to keep and apply the rules, and sprintf the data to be kept to a csv file.
Then created a sqlldr control file to upload the data using direct path (which wont create undo/redo (but if you need to recover the table, you have the CSV file until you do your next backup anyway).
The sequence was
Run the Pro*C to create CSV files of data
generate DDL for the indexes
drop the indexes
run the sql*load using the CSV files
recreate indexes using parallel hint
analyse the table using degree(8)
The amount of parellelism depends on the CPUs and memory of the DB server - we had 16CPUs and a few gig of RAM to play with so not a problem.
The extract of the correct data was the longest part of this.
After a few trial runs, the SQL Loader was able to load the full 1 billion rows (thats a US Billion or 1000 million rows) in under an hour.

Resources