How to get the maximum sub-complete-graph from a complete graph? - algorithm

Suppose we have a N-complete graph G(V, E), which is undirected and weighted. Given K, how could we find the sub-graph G'(V', E'), which is also a complete graph and |V'| = K and the sum of all edges in E' is maximum.

Since the original graph is complete, so you can just sum the weights for all the nodes, and keeps only the maximum K nodes and their edges.
Is this right? If not, you can delete the node with minimal weight sum each time, calculate weights sums again, this is more time consume.

Related

An undirected graph having n edges, then find out no. of vertices that graph have?

An undirected graph having 'n' number of edges, then find out number of vertices that graph have?‏‏‎
Since an edge is a connection between to vertices, the amount of vertices is at max 2n.
The amount of vertices is at minimum n+1. (This is pretty logical if you imagine that you have 2 edges - then you will at minimum have 3 vertices, because each edge must connect 2 vertices)
So if e = n, then n+1 <= v <= 2n
There is no exact formula for the number of vertices in terms of number of edges in the general case. However, if you take special cases, you can say more: if the graph is a tree, then the number of vertices is one more than the number of edges.

Find minimum spanning tree of undirected weighed graph with root node having exactly k edges

Having an undirected graph with v vertices and e edges with each edges having a non-negative weight of at most w, the task is to find(if possible!) a subset of edges that connects all vertices with minimum cost. Also this graph has a root node which in the sub-graph should only be directly connected to exactly k other vertices(so it most have exactly k edges connected to it in the sub-graph). The algorithm should work in O(e⋅log(v)⋅log(w)) time.
So after some thinking I thought that we need to find a minimum spanning tree since it gives us the Minimum-cost subgraph which takes O(e.log(v)) time.However for insuring that the root node has exactly k edges in the resulting tree I couldn't come up with any working idea.
I think that maybe changing the weights of k edges that are connect to the root may enforce their selection,since in the Kruskal's algorithm we first sort the edges, if we pick exactly k edges that are already connected to the edge root in the graph and change their weights to some minimum amount then in the tree construction phase, chances are that this k edges make it to the MST. There are still problems here:
K edges should be picked so that it would be possible for them to make it to an MST.

Describing an algorithm at most O(nm log n) run time

If I had to give an algorithm in O|V|3| that takes as input a directed graph with positive edge lengths and returns the length of the shortest cycle in the graph (if the graph is acyclic, it should say so). I know that it will be:
Let G be a graph, define a matrix Dij which stores the shortest path from vertex i to j for any pair of vertices u,v. There can be two shortest paths between u and v. The length of the cycle is Duv+ Dvu. This then is enough to compote the minimum of the Duv+Dvu for any given pair of vertices u and v.
Could I write this in a way to make it at most O(nm log n) (where n is the number of vertices and m is the number of edges) instead of O|V|3|?
Yes, in fact this problem can be solved in O(nm) according to a conference paper by Orlin and Sedeño-Noda (2017), titled An O(nm) time algorithm for finding the min length directed cycle in a graph:
In this paper, we introduce an O(nm) time algorithm to determine the minimum length directed cycle (also called the "minimum weight directed cycle") in a directed network with n nodes and m arcs and with no negative length directed cycles.

Graph Algorithms

What is the maximum and minimum number of edges to be considered in krushkal's algorithm with an example for both cases.
What I thought was since the Krushkal's algorithm is for finding minimum spanning tree the maximum number of edges is (V-1) where V is the number of vertices. Adding one more edge would result in a cycle in the graph. How can we obtain at a minimum value ?
Kruskal's algorithm stops when you've added V - 1 edges to your MST, so this is the minimum that have to be considered. This happens when the lowest value V - 1 edges of your graph do not form a cycle, and they will be added one after the other by the algorithm, after which it will stop.
For example, consider a complete graph with edges with cost 1, which is minimum in the graph, between node 1 and every other node. Make all the other edges have cost 2.
The worst case is when you must inspect every edge (of which there are O(V^2)) until you finally select V - 1. This means that you have to force a lot of cycles to be created before the last edge is added.
Consider a complete graph again. Have the V - 2 edges between node 1 and V - 2 nodes have cost 1, which is minimum in the graph. These will be selected first. Now let node k be the one that is not part of a selected edge, so that is left out of the graph. Have the edge between node k and node 1 have the largest cost. This will cause it to be inspected and added to the MST last, forcing the algorithm to inspect all O(V^2) edges before building the MST.
Remember the Kruskal's algorithm processes edges in increasing order of their cost, rejecting edges that would form a cycle if added to the MST we are building.
A tree of N vertices always has N-1 edges. Consequently you have to consider at least N-1 edges during Kruskal's algorithm. An example may be a graph which is a tree.

How to find maximum spanning tree?

Does the opposite of Kruskal's algorithm for minimum spanning tree work for it? I mean, choosing the max weight (edge) every step?
Any other idea to find maximum spanning tree?
Yes, it does.
One method for computing the maximum weight spanning tree of a network G –
due to Kruskal – can be summarized as follows.
Sort the edges of G into decreasing order by weight. Let T be the set of edges comprising the maximum weight spanning tree. Set T = ∅.
Add the first edge to T.
Add the next edge to T if and only if it does not form a cycle in T. If
there are no remaining edges exit and report G to be disconnected.
If T has n−1 edges (where n is the number of vertices in G) stop and
output T . Otherwise go to step 3.
Source: https://web.archive.org/web/20141114045919/http://www.stats.ox.ac.uk/~konis/Rcourse/exercise1.pdf.
From Maximum Spanning Tree at Wolfram MathWorld:
"A maximum spanning tree is a spanning tree of a weighted graph having maximum weight. It can be computed by negating the weights for each edge and applying Kruskal's algorithm (Pemmaraju and Skiena, 2003, p. 336)."
If you invert the weight on every edge and minimize, do you get the maximum spanning tree? If that works you can use the same algorithm. Zero weights will be a problem, of course.
Although this thread is too old, I have another approach for finding the maximum spanning tree (MST) in a graph G=(V,E)
We can apply some sort Prim's algorithm for finding the MST. For that I have to define Cut Property for the maximum weighted edge.
Cut property: Let say at any point we have a set S which contains the vertices that are in MST( for now assume it is calculated somehow ). Now consider the set S/V ( vertices not in MST ):
Claim: The edge from S to S/V which has the maximum weight will always be in every MST.
Proof: Let's say that at a point when we are adding the vertices to our set S the maximum weighted edge from S to S/V is e=(u,v) where u is in S and v is in S/V. Now consider an MST which does not contain e. Add the edge e to the MST. It will create a cycle in the original MST. Traverse the cycle and find the vertices u' in S and v' in S/V such that u' is the last vertex in S after which we enter S/V and v' is the first vertex in S/V on the path in cycle from u to v.
Remove the edge e'=(u',v') and the resultant graph is still connected but the weight of e is greater than e' [ as e is the maximum weighted edge from S to S/V at this point] so this results in an MST which has sum of weights greater than original MST. So this is a contradiction. This means that edge e must be in every MST.
Algorithm to find MST:
Start from S={s} //s is the start vertex
while S does not contain all vertices
do
{
for each vertex s in S
add a vertex v from S/V such that weight of edge e=(s,v) is maximum
}
end while
Implementation:
we can implement using Max Heap/Priority Queue where the key is the maximum weight of the edge from a vertex in S to a vertex in S/V and value is the vertex itself. Adding a vertex in S is equal to Extract_Max from the Heap and at every Extract_Max change the key of the vertices adjacent to the vertex just added.
So it takes m Change_Key operations and n Extract_Max operations.
Extract_Min and Change_Key both can be implemented in O(log n). n is the number of vertices.
So This takes O(m log n) time. m is the number of edges in the graph.
Let me provide an improvement algorithm:
first construct an arbitrary tree (using BFS or DFS)
then pick an edge outside the tree, add to the tree, it will form a cycle, drop the smallest weight edge in the cycle.
continue doing this util all the rest edges are considered
Thus, we'll get the maximum spanning tree.
This tree satisfies any edge outside the tree, if added will form a cycle and the edge outside <= any edge weights in the cycle
In fact, this is a necessary and sufficient condition for a spanning tree to be maximum spanning tree.
Pf.
Necessary: It's obvious that this is necessary, or we could swap edge to make a tree with a larger sum of edge weights.
Sufficient: Suppose tree T1 satisfies this condition, and T2 is the maximum spanning tree.
Then for the edges T1 ∪ T2, there're T1-only edges, T2-only edges, T1 ∩ T2 edges, if we add a T1-only edge(x1, xk) to T2, we know it will form a cycle, and we claim, in this cycle there must exist one T2-only edge that has the same edge weights as (x1, xk). Then we can exchange these edges will produce a tree with one more edge in common with T2 and has the same sum of edge weights, repeating doing this we'll get T2. so T1 is also a maximum spanning tree.
Prove the claim:
suppose it's not true, in the cycle we must have a T2-only edge since T1 is a tree. If none of the T2-only edges has a value equal to that of (x1, xk), then each of T2-only edges makes a loop with tree T1, then T1 has a loop leads to a contradiction.
This algorithm taken from UTD professor R. Chandrasekaran's notes. You can refer here: Single Commodity Multi-terminal Flows
Negate the weight of original graph and compute minimum spanning tree on the negated graph will give the right answer. Here is why: For the same spanning tree in both graphs, the weighted sum of one graph is the negation of the other. So the minimum spanning tree of the negated graph should give the maximum spanning tree of the original one.
Only reversing the sorting order, and choosing a heavy edge in a vertex cut does not guarantee a Maximum Spanning Forest (Kruskal's algorithm generates forest, not tree). In case all edges have negative weights, the Max Spanning Forest obtained from reverse of kruskal, would still be a negative weight path. However the ideal answer is a forest of disconnected vertices. i.e. a forest of |V| singleton trees, or |V| components having total weight of 0 (not the least negative).
Change the weight in a reserved order(You can achieve this by taking a negative weight value and add a large number, whose purpose is to ensure non-negative) Then run your family geedy-based algorithm on the minimum spanning tree.

Resources