Adding users one after another in JMeter - jmeter

I need to perform the following scenario in JMeter:
Every 20 seconds a user will start pinging the server (will ping every 5 seconds)
1000 users.
So it start with one user that will ping every 5 seconds and after 20 sec another user will start pinging every 5 sec, and this will continue for 1000 users.
At the end 1000 users will ping together every 5 sec and all this need to run for 24 hours.

Define Thread Group with 1000 users,
Ramp Up Period 20000 - meaning every 20 seconds new users will start
Loop Count = 17280 (5 seconds per day count)
and add as a child to your ping request a Constant Timer with 5000 milliseconds
It will execute every 20 seconds a new user which will ping every 5 seconds. example in View Results Tree:

Related

Performance testing using JMeter for dynamic 365 ecommerce website using ultimate thread group. How to increase concurrent sessions?

I am doing performance testing using JMeter for a 365 dynamics ecommerce website. Script is written and its working fine for following flow: Homepage> category listing> product detail page> add to cart> and complete checkout.
I want to run my script for 200 concurrent users with some time interval. Like, start with 30 concurrent sessions for 10 minutes then increase 60 users with total concurrent session 90 for next 10 minutes. Then increase 44 users with total concurrent session 134 for next 10 minutes, Then increase 66 more users with total concurrent session 200 for next 10 minutes.
I am using ultimate thread group for this but not sure how to set configuration. See attached image.
I think you should amend your setup to introduce initial delay incrementing by 600 seconds for each group of new arrivals. The time to hold the load needs to be reduced by the same factor.
Example setup:
More information:
Ultimate Thread Group documentation
JMeter Ramp-Up - The Ultimate Guide

Run multiple threads parallel or sequential in Jmeter

I want to perform performance testing using JMeter, I have the following scenario which I want to record and run 5 min 300 users(Login) -> 20 min 150 users(assessment save) -> 5 min 40 users (Submit assessment) when users log in simultaneously 20 min 50 users (Browsing). Please refer screenshot for reference. I want to create a script on the basis of the scenario.
In this scenario, first 300 users will land on assessment page out of 300, 20 users will browse then 150 users will complete then 40 users Submit assessment and parallel 10 users download report in 5 min

Understanding Google Search Console URL Testing Tools API Limits

I am using Google Search Console URL Testing Tools API, I have a problem in the understanding limit quota of API. It says:
Project per-second limit per 100 seconds = 1
User per-second limit per 100 seconds per user = 1
What does that mean?
Most of highly used APIs (google, facebook..) have short-time limits and long-time limits for better control over traffic. It allows developers make many requests (eg. 20000 per day) but prevents throttling if someone would try to eg. send 1000 requests in one second, which could clog api endpoint.
What you have in your google console:
Project per-second limit per 100 seconds = 1
That means you can make 1 query for 100 seconds in each project.
And:
User per-second limit per 100 seconds per user = 1
That means you can make 1 query for 100 seconds for each user connected to project.
That two limit rules putted together dont make much sense beacuse second rule will never be triggered (both have 1 request per 100 seconds but first one is for 'higher' resource and will block more requests).
Example of many limits you can see eg. in Analytics API where we have:
Queries per day = 50000
Big limit for queries per day.
Queries per 100 seconds per user = 100
Small limit per 100 seconds and per user so they can prevent too high peaks of requests from single user.
Queries per 100 seconds = 2000
Medium limit per 100 seconds.

How to increase users periodially in jmeter

My test case is Users starts from 1000 and in next 1 hour there will be 10k users on website.
I am confuse that how can I increase users in jmeter so when test reach at 1 hour, I can see 10k active users.
Should I use ultimate thread group for this? I just want hint from expert to go to next step.
From what i have understood, you want to have 1000 users immediately, then slowly 9000 users in the next 1 hr, so that you will have 10000 users.
Then ultimate thread group seems to be a good choice for this exact requirement.
Hold Load for sec is the test duration with 10000 users. adjust accordingly.
Or, if your requirement is just to have 10000 users in 1 hr, (not 1000 in the beginning) , you can also use regular thread group.

What does Average value mean in Summary Report in Jmeter?

I Have a Thread Group created in my Test Plan. I have set the Thread Group to run 20 Threads with Ramp Up Period as 0 and Loop Count as 1.
Now i have created 5 JDBC Sampler Request each which runs different queries against the same Database, so when i start the test , it should kick start 100 queries (20 * 5)
I also generated a Summary report and copied pasted parts of that report.
Sampler Label No of Requests per Sampler Average( in milliseconds)
------------- -------------------------- --------------------------
MYSQL JDBC Request 1 20 8571
MySQL JDBC Request 2 20 5154
MySQL JDBC Request 3 20 5927
MySQL JDBC Request 4 20 1290
MySQL JDBC Request 5 20 1449
TOTAL 100 4478
In the Summary Report taht i have compiled above, what does average of 4478 milliseconds mean?
Does this mean that it took 4478 milliseconds to run 20 threads on an average ? or does it mean that it took 4478 milliseconds to run 100 queries?..can someone help me here. I could not find this information anywhere in the Jmeter apache documentation.
Thanks in advance.
As per this documentation:
https://jmeter.apache.org/usermanual/component_reference.html#Summary_Report
Average : The average elapsed time of a set of results
So it means its it:
Sum of all request's response time / total number of requests

Resources