I ran into the scenario in the title on this cluster:
5 shards, 5 replicas
Google Cloud Compute
One table only on the cluster (sharded and replicated) with ReplicatedReplacingMergeTree. I can provide the schema if needed, but the issue should not depend on that
Clickhouse 21.8.13.1.altinitystable. (but also reproduced on 20.7.2.30)
This is the sequence of events:
I executed an OPTIMIZE TABLE .... PARTITION .... FINAL on one node of each of the shards. The partition is fairly large (120Gb) so that process would take longer than one hour.
The optimize started and was visible in system.merges and system.replication_queue as usual.
During the process one of the nodes was restarted because of a GCP maintenance event and came back up a few minutes later.
Once Clickhouse restarted, it restarted the merge as expected. Though three GET_PART operations (I assume parts that were created during the downtime and had to be replicated) did not start as they were waiting on the large merge to complete. See the output of the replication_queue table below. 90-20220530_0_1210623_1731 part is the one indeed covered by the merge generated by the OPTIMIZE statement
SELECT
replica_name,
postpone_reason,
type
FROM system.replication_queue
(formatted)
replica_name: snuba-errors-tiger-4-4
postpone_reason: Not executing log entry queue-0055035589 for part 90-20220530_0_1210420_1730 because it is covered by part 90-20220530_0_1210623_1731 that is currently executing.
type: GET_PART
replica_name: snuba-errors-tiger-4-4
postpone_reason: Not executing log entry queue-0055035590 for part 90-20220530_1210421_1210598_37 because it is covered by part 90-20220530_0_1210623_1731 that is currently executing.
type: GET_PART
replica_name: snuba-errors-tiger-4-4
postpone_reason: Not executing log entry queue-0055035591 for part 90-20220530_1210599_1210623_6 because it is covered by part 90-20220530_0_1210623_1731 that is currently executing.
type: GET_PART
replica_name: snuba-errors-tiger-4-4
postpone_reason:
type: MERGE_PARTS
The metrics around the replication delay increased up to 1:30 minutes and the distributed table did not send any query to this node until the merge was done (90 minutes later)
Is this a normal behavior ? If yes, is there a way to prevent a long merge from blocking replication in case of restart ?
max_replica_delay_for_distributed_queries is set to 300 seconds on the cluster. I was expecting the 1:30 minutes delay would be ignored but that did not seem to be the case as no query was routed to the impacted node. Is there another way to tell Clickhouse to ignore the replication delay ?
Thank you
Filippo

Related

Oracle auto-gather statistics & stale statistics

Starting in Oracle 11g, GATHER_STATS_JOB is no longer valid, and has been replace by "auto optimizer stats collection".
This job supposedly runs during the "maintenance windows" and gathers statistics for objects which have changed 10% or more, or have stale stats. If this is true, then why when I run a query checking "stale_stats='YES'", I still get objects?
Maybe I'm not understanding how the job executes......
Two broad possibilities
Oracle updates stale_statistics to "YES" in dba_tab_statistics periodically throughout the day as tables undergo changes. It is entirely possible that a table had just under the threshold amount of changes when stats were gathered this morning and that stale_stats flipped to "YES" during the day today when a few more changes were made.
Depending on how many objects had stale stats when the job ran and how much data those tables contained, how large your maintenance window is, and how powerful your server is, it is possible that the statistics job had to be aborted before it could re-gather all the stale statistics. If the job was aborted, that abort would be logged in the job history. If this happened because there happened to be a large number of changes one day (say you ran an annual purge process that deleted a large amount of data from almost every table in the database), the stale statistics would be updated over the course of several days worth of statistics job runs until the job caught up.

Multiple small inserts in clickhouse

I have an event table (MergeTree) in clickhouse and want to run a lot of small inserts at the same time. However the server becomes overloaded and unresponsive. Moreover, some of the inserts are lost. There are a lot of records in clickhouse error log:
01:43:01.668 [ 16 ] <Error> events (Merger): Part 201 61109_20161109_240760_266738_51 intersects previous part
Is there a way to optimize such queries? I know I can use bulk insert for some types of events. Basically, running one insert with many records, which clickhouse handles pretty well. However, some of the events, such as clicks or opens could not be handled in this way.
The other question: why clickhouse decides that similar records exist, when they don't? There are similar records at the time of insert, which have the same fields as in index, but other fields are different.
From time to time I also receive the following error:
Caused by: ru.yandex.clickhouse.except.ClickHouseUnknownException: ClickHouse exception, message: Connect to localhost:8123 [ip6-localhost/0:0:0:0:0:0:0:1] timed out, host: localhost, port: 8123; Connect to ip6-localhost:8123 [ip6-localhost/0:0:0:0:0:0:0:1] timed out
... 36 more
Mostly during project build when test against clickhouse database are run.
Clickhouse has special type of tables for this - Buffer. It's stored in memory and allow many small inserts with out problem. We have near 200 different inserts per second - it works fine.
Buffer table:
CREATE TABLE logs.log_buffer (rid String, created DateTime, some String, d Date MATERIALIZED toDate(created))
ENGINE = Buffer('logs', 'log_main', 16, 5, 30, 1000, 10000, 1000000, 10000000);
Main table:
CREATE TABLE logs.log_main (rid String, created DateTime, some String, d Date)
ENGINE = MergeTree(d, sipHash128(rid), (created, sipHash128(rid)), 8192);
Details in manual: https://clickhouse.yandex/docs/en/operations/table_engines/buffer/
This is known issue when processing large number of small inserts into (non-replicated) MergeTree.
This is a bug, we need to investigate and fix.
For workaround, you should send inserts in larger batches, as recommended: about one batch per second: https://clickhouse.tech/docs/en/introduction/performance/#performance-when-inserting-data.
I've had a similar problem, although not as bad - making ~20 inserts per second caused the server to reach a high loadavg, memory consumption and CPU use. I created a Buffer table which buffers the inserts in memory, and then they are flushed periodically to the "real" on-disk table. And just like magic, everything went quite: loadavg, memory and CPU usage came down to normal levels. The nice thing is that you can run queries against the buffer table, and get back matching rows from both memory and disk - so clients are unaffected by the buffering. See https://clickhouse.tech/docs/en/engines/table-engines/special/buffer/
Alternatively, you can use something like https://github.com/nikepan/clickhouse-bulk: it will buffer multiple inserts and flush them all together according to user policy.
The design of clickhouse MergeEngines is not meant to take small writes concurrently. The MergeTree as much as I understands merges the parts of data written to a table into based on partitions and then re-organize the parts for better aggregated reads. If we do small writes often you would encounter another exception that Merge
Error: 500: Code: 252, e.displayText() = DB::Exception: Too many parts (300). Merges are processing significantly slow
When you would try to understand why the above exception is thrown the idea will be a lot clearer. CH needs to merge data and there is an upper limit as to how many parts can exist! And every write in a batch is added as a new part and then eventually merged with the partitioned table.
SELECT
table, count() as cnt
FROM system.parts
WHERE database = 'dbname' GROUP BY `table` order by cnt desc
The above query can help you monitor parts, observe while writing how the parts would increase and eventually merge down.
My best bet for the above would be buffering the data set and periodically flushing it to DB, but then that means no real-time analytics.
Using buffer is good, however please consider these points:
If the server is restarted abnormally, the data in the buffer is lost.
FINAL and SAMPLE do not work correctly for Buffer tables. These conditions are passed to the destination table, but are not used for processing data in the buffer
When adding data to a Buffer, one of the buffers is locked. (So no reads)
If the destination table is replicated, some expected characteristics of replicated tables are lost when writing to a Buffer table. (no deduplication)
Please read throughly, it's a special case engine: https://clickhouse.tech/docs/en/engines/table-engines/special/buffer/

Oracle slow down unexpected and rapidly when using sql "update" continuously

The situation is simple, there is a table in oracle used as a "shared table" for data exchange. The table structure and number of records remains unchanged. In normal case, I continuously update data into this table and other process read this table for current data.
Strange thing is, when my process starts, the time consumption of each update statement execution is approximately 2 ms. And after a certain peroid of time(like 8 hours), the time consumption increased to 10 ~ 20 ms per statement. It makes the procedure quite slow.
the structure of table
and the update statement is like:
anaNum = anaList.size();
qry.prepare(tr("update YC set MEAVAL=:MEAVAL, QUALITY=:QUALITY, LASTUPDATE=:LASTUPDATE where YCID=:YCID"));
foreach(STbl_ANA ana, anaList)
{
qry.bindValue(":MEAVAL",ana.meaVal);
qry.bindValue(":QUALITY",ana.quality);
qry.bindValue(":LASTUPDATE",QDateTime::fromTime_t(ana.lastUpdate));
qry.bindValue(":YCID",ana.ycId);
if(!qry.exec())
{
qWarning() << QObject::tr("update yc failed, ")
<< qry.lastError().databaseText() << qry.lastError().driverText();
failedAnaList.append(ana);
}
}
the update statement using qt interface
There is many reasons which can cause orcle opreation slowd down, but I cannot find a clue to explain this.
I never start a transaction manually in qt code, which means the commit operation is executed every time after update statement.
The update frequency is about 200 records per second, but the number is dynamically changed by time. It maybe increase to 1000 in one time and drop to 10 in next time.
once the time consumption up to 10 ~ 20 ms per statement, it'll never dorp down. time consumption can be restored to 2ms only be restart oracle service.(it's useless to shutdown or restart any user process which visit orcle)
Please tell me how to solve it or at least what to be examined.
Good starting points is to check the AWR and ASH reports.
Comparing the reports in "good" and "bad" times you can spot the cause of the change. This can be for example a change of an execution plan or increase of wait events. One possible outcome is that only change you see is that the database is waiting more time on the client (i.e. the problem is not in the DB).
Anyway as diagnosed in other answer, the root cause of problems seems to be the update in a loop. If your update lists are long (say more that 10-100 entries) you can profit by updating the whole list in a single statement using MERGE.
build a collection from your list
cast the collection as TABLE
use this table in a MERGE statement to update the rows.
See here for details.
You can trace the session while it is running quickly and again later when it is running slowly. Use the sql trace functionality and tkprof to get a breakdown of where the update is spending its time in each case and see what has changed.
https://docs.oracle.com/cd/E25178_01/server.1111/e16638/sqltrace.htm#i4640
If you need help interpreting the results you can update your question or ask a new one.
Secondly, as a rule single record updates are not the best way to do updates in Oracle. Since you have many records to update already prepared before you prepare the query, look at execBatch.
https://doc.qt.io/qt-4.8/qsqlquery.html#execBatch
This will both execute the update faster and only issue a single commit.

Azure SQL Data IO 100% for extended periods for no apparent reason

I have an Azure website running about 100K requests/hour and it connects to Azure SQL S2 database with about 8GB throughput/day. I've spent a lot of time optimizing the database indexes, queries, etc. Normally the Data IO, CPU and Log IO percentages are well behaved in the 20% range.
A recent portion of the data throughput is retained for supporting our customers. I have a nightly maintenance procedure that removes obsolete data to manage database size. This mostly works well with the exception of removing image blobs in a varbinary(max) field.
The nightly procedure has a loop that sets 10 records varbinary(max) field to null at a time, waits a couple seconds, then sets the next 10. Nightly total for this loop is about 2000.
This loop will run for about 45 - 60 minutes and then stop running with no return to my remote Sql Agent job and no error reported. A second and sometimes third running of the procedure is necessary to finish setting the desired blobs to null.
In an attempt to alleviate the load on the nightly procedure, I started running a job once every 30 seconds throughout the day - it sets one blob to null each time.
Normally this trickle job is fine and runs in 1 - 6 seconds. However, once or twice a day something goes wrong and I can find no explanation for it. The Data I/O percentage peaks at 100% and stays there for 30 - 60 minutes or longer. This causes the database responsiveness to suffer and the website performance goes with it. The trickle job also reports running for this extended period of time. If I stop the Sql Agent job, it can take a few minutes to stop but the Data I/O continues at 100% for the 30 - 60 minute period.
The web service requests and database demands are relatively steady throughout the business day - no volatile demands that would explain this. No database deadlocks or other errors are reported. It's as if the database hits some kind of backlog limit where its ability to keep up suddenly drops and then it can't catch up until something that is jammed finally clears. Then the performance will suddenly return to normal.
Do you have any ideas what might be causing this intermittent and unpredictable issue? Any ideas what I could look at when one of these events is happening to determine why the Data I/O is 100% for an extended period of time? Thank you.
If you are on SQL DB V12, you may also consider using the Query Store feature to root cause this performance problem. It's now in public preview.
In order to turn on Query Store just run the following statement:
ALTER DATABASE your_db SET QUERY_STORE = ON;

Impala query stuck in status Executing

I have a query CREATE TABLE foobar AS SELECT ... that runs successfully in Hue (the returned status is Inserted 986571 row(s)) and takes a couple seconds to complete. However, in Cloudera Manager its status - after more than 10 minutes - still says Executing.
Is it a bug in Cloudera Manager or is this query actually still running?
When Hue executes a query, it leaves the query open so that users can page through results at their own pace. (Of course, this behavior isn't very useful for DDL statements.) That means that Impala still considers the query to be executing, even if it is not actively using CPU cycles (keep in mind it is still holding memory!). Hue will close the query if explicitly told to, or when the page/session is closed, e.g. using the hue command:
> build/env/bin/hue close_queries --help
Note that Impala has a query option to automatically 'timeout' queries after a period of time, see query_timeout_s. Hue sets this to 10 minutes by default, but you can override it in the hue.ini settings.
One thing to note is that when queries 'time out', they are cancelled but not closed, i.e. the query will remain "in flight" with a CANCELLED status. The reason for this is so that users (or tools) can continue to observe the query metadata (e.g. query profile, status, etc.), which would not be available if the query is fully closed and thus deregistered from the impalad. Unfortunately these cancelled queries may still hold some non-negligible resources, but this will be fixed with IMPALA-1575.
More information: Hive and Impala queries life cycle